National Aeronautics and Space Administration
Total awarded · trailing 12 months
$70.4B
$537for every U.S. household÷ 131M U.S. households
In perspective
11%of all $654.0B in tracked awards
283separate awards, trailing 12 months
National Aeronautics and Space Administration has awarded $70.4B across 283 federal contracts of $1M or more on record.
Data as of August 5, 2026. Source: USAspending.gov, prime contract awards $1M+. Federal spending data lags and has known gaps. This is not a real-time or complete record.
Top recipients
Where this agency’s dollars go.
All contract awards
Swipe to see description and amount →
| Contractor | Description | Amount |
|---|---|---|
| THE BOEING COMPANY | INTERNATIONAL SPACE STATION | $22,440,930,497 |
| THE BOEING COMPANY | PROVIDE DEVELOPMENTAL HARDWARE AND TEST ARTICLES, AND MANUFACTURE AND ASSEMBLE ARES I UPPER STAGES. THE UPPER STAGE (US) ELEMENT IS AN INTEGRAL PART OF THE ARES I LAUNCH VEHICLE AND PROVIDES THE SECOND STAGE OF FLIGHT. THE US ELEMENT IS RESPONSIBLE FOR THE ROLL CONTROL DURING THE FIRST STAGE BURN AND SEPARATION; AND WILL PROVIDE THE GUIDANCE AND NAVIGATION, COMMAND AND DATA HANDLING, AND OTHER AVIONICS FUNCTIONS FOR THE ARES I DURING ALL PHASES OF THE ASCENT FLIGHT. THE US ELEMENT IS A NEW DESIGN THAT EMPHASIZES SAFETY, OPERABILITY, AND MINIMUM LIFE CYCLE COST. THE OVERALL DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E), PRODUCTION, AND SUSTAINING ENGINEERING EFFORTS INCLUDE ACTIVITIES PERFORMED BY THREE ORGANIZATIONS; THE NASA DESIGN TEAM (NDT), THE UPPER STAGE PRODUCTION CONTRACTOR (USPC) AND THE INSTRUMENT UNIT PRODUCTION CONTRACTOR (IUPC). FOR CLARITY, THE USPC WILL BE REFERRED TO AS THE CONTRACTOR THROUGHOUT THIS DOCUMENT. NASA IS RESPONSIBLE FOR THE INTEGRATION OF THE PRIMARY ELEMENTS OF THE ARES I LAUNCH VEHICLE INCLUDING: THE FIRST STAGE, US INCLUDING INSTRUMENT UNIT (IU), AND US ENGINE; AND WILL ALSO INTEGRATE THE ARES I LAUNCH VEHICLE AT THE LAUNCH SITE. NASA IS RESPONSIBLE FOR THE DDT&E, INCLUDING TECHNICAL AND PROGRAMMATIC INTEGRATION OF THE US SUBSYSTEMS AND GOVERNMENT-FURNISHED PROPERTY. NASA WILL LEAD THE EFFORT TO DEVELOP THE REQUIREMENTS AND SPECIFICATIONS OF THE US ELEMENT, THE DEVELOPMENT PLAN AND TESTING REQUIREMENTS, AND ALL DESIGN DOCUMENTATION, INITIAL MANUFACTURING AND ASSEMBLY PROCESS PLANNING, LOGISTICS PLANNING, AND OPERATIONS SUPPORT PLANNING. DEVELOPMENT, QUALIFICATION, AND ACCEPTANCE TESTING WILL BE CONDUCTED BY NASA AND THE CONTRACTOR TO SATISFY REQUIREMENTS AND FOR RISK MITIGATION. NASA IS RESPONSIBLE FOR THE OVERALL UPPER STAGE VERIFICATION AND VALIDATION PROCESS AND WILL REQUIRE SUPPORT FROM THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR THE MANUFACTURE AND ASSEMBLY OF THE UPPER STAGE TEST FLIGHT AND OPERATIONAL UPPER STAGE UNITS INCLUDING THE INSTALLATION OF UPPER STAGE INSTRUMENT UNIT, THE GOVERNMENT-FURNISHED US ENGINE, BOOSTER SEPARATION MOTORS, AND OTHER GOVERNMENT-FURNISHED PROPERTY. A DESCRIPTION OF THE NASA MANAGED AND PERFORMED EFFORTS IS CONTAINED IN THE US WORK PACKAGES AND WILL BE MADE AVAILABLE TO THE CONTRACTOR TO ENSURE THEIR UNDERSTANDING OF THE ROLES AND RESPONSIBILITIES OF THE NDT, IUPC, AND CONTRACTOR DURING THE DESIGN, DEVELOPMENT, AND OPERATION OF THE US ELEMENT. THE US CONCEPTUAL DESIGN DESCRIBED IN THE USO-CLV-SE-25704 US DESIGN DEFINITION DOCUMENT (DDD) IS THE BASELINE DESIGN FOR THIS CONTRACT. THE CONTRACTORS EARLY ROLE WILL BE TO PROVIDE PRODUCIBILITY ENGINEERING SUPPORT TO NASA VIA THE ESTABLISHED US OFFICE STRUCTURE AND TO PROVIDE INPUTS INTO THE FINAL DESIGN CONFIGURATION, SPECIFICATIONS, AND STANDARDS. NASA WILL TRANSITION THE MANUFACTURING AND ASSEMBLY, LOGISTICS SUPPORT INFRASTRUCTURE, CONFIGURATION MANAGEMENT, AND THE SUSTAINING ENGINEERING FUNCTIONS TO THE CONTRACTOR AT THE KEY POINTS DURING THE DEVELOPMENT AND IMPLEMENTATION OF THE PROGRAM CURRENTLY PLANNED TO OCCUR NO LATER THAN 90 DAYS AFTER THE COMPLETION OF THE FOLLOWING MAJOR MILESTONES: MANUFACTURING AND ASSEMBLY US PRELIMINARY DESIGN REVIEW (PDR) LOGISTICS SUPPORT INFRASTRUCTURE US PDR CONFIGURATION MANAGEMENT US CRITICAL DESIGN REVIEW CDR) SUSTAINING ENGINEERING US DESIGN CERTIFICATION REVIEW (DCR) AFTER THE COMPLETION OF AN ORDERLY TRANSITION OF ROLES AND RESPONSIBILITIES TO THE CONTRACTOR, NASA WILL ASSUME AN INSIGHT ROLE INTO THE CONTRACTORS PRODUCTION, SUSTAINING ENGINEERING, AND OPERATIONS SUPPORT OF THE ARES I US TEST PROGRAM AND FLIGHT HARDWARE. AFTER DCR, THE CONTRACTOR WILL BE RESPONSIBLE FOR SUSTAINING ENGINEERING PER SOW SECTION 4.7, AS NECESSARY TO MAINTAIN AND SUPPORT THE US CONFIGURATION AND FOR PRODUCTION AND OPERATIONS SUPPORT. | $10,521,604,426 |
| AEROJET ROCKETDYNE OF DE, INC | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. | $3,373,486,394 |
| SPACE EXPLORATION TECHNOLOGIES CORP. | WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER. | $3,055,729,526 |
| THE BOEING COMPANY | SPACE LAUNCH SYSTEM (SLS) STAGES PRODUCTION AND EVOLUTION CONTRACT (SPEC) | $2,744,085,731 |
| LOCKHEED MARTIN CORP | THE GOVERNMENT IS PROCURING THE NEXT-GENERATION GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) SERIES TO CONTINUE ITS MISSION THROUGH NEW REQUIREMENTS SPECIFIED IN THE GOES-R LEVEL I REQUIREMENTS DOCUMENT AND MISSION REQUIREMENTS DOCUMENT (MRD). THE FIRST SATELLITE OF THIS NEW SERIES, DESIGNATED AS GOES-R, WILL PROVIDE THE FIRST MAJOR IMPROVEMENT IN INSTRUMENT TECHNOLOGY SINCE GOES-I LAUNCHED IN 1994. THE GOES-R SERIES WILL INTRODUCE OTHER NEW TECHNOLOGIES IN BOTH THE SPACE AND GROUND SEGMENTS. THESE ADVANCES WILL IMPROVE THE NATION'S ABILITY TO MONITOR AND FORECAST WEATHER AND ENVIRONMENTAL PHENOMENA WITH A SIGNIFICANT INCREASE IN THE NUMBER OF PRODUCTS. ONE OF NOAA'S PRINCIPAL MISSIONS IS TO PROVIDE FORECASTS AND WARNINGS FOR THE UNITED STATES, ITS TERRITORIES, ADJACENT WATERS AND OCEAN AREA FOR THE PROTECTION OF LIFE AND PROPERTY AND ENHANCEMENT OF THE NATIONAL ECONOMY. THIS MISSION REQUIRES THE CAPABILITY TO ACQUIRE, PROCESS, AND DISSEMINATE ENVIRONMENTAL DATA ON AN EXTENSIVE SPATIAL RANGE (GLOBAL, REGIONAL AND LOCAL) ON A VARIETY OF TIME SCALES. THESE DATA INCLUDE, BUT ARE NOT LIMITED TO: GLOBAL IMAGERY; CLOUD AND PRECIPITATION PARAMETERS; ATMOSPHERIC PROFILES OF TEMPERATURE, MOISTURE, WINDS, AEROSOLS, AND OZONE; SURFACE CONDITIONS CONCERNING ICE, SNOW AND VEGETATION; OCEAN PARAMETERS AND SEA-SURFACE TEMPERATURE; AND SOLAR AND IN-SITU SPACE ENVIRONMENT CONDITIONS. THE STATEMENT OF WORK (SOW) DEFINES THOSE TASKS TO DESIGN, ANALYZE, VALIDATE, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, TEST, VERIFY, EVALUATE, DELIVER GOES-R SERIES SATELLITES AND SUPPORT LAUNCH AND POST LAUNCH, SUPPLY AND MAINTAIN THE GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE NOAA SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES, AND OTHER RESOURCES TO DESIGN, VALIDATE, FABRICATE, ASSEMBLE, INTEGRATE, TEST, VERIFY, AND DELIVER GOES-R SERIES SATELLITES AND PROVIDE PRE-LAUNCH, LAUNCH, AND POST-LAUNCH SUPPORT AND TRAINING UNDER THE BASIC CONTRACT, AND OPTIONS WHEN EXERCISED BY THE GOVERNMENT. | $2,032,829,135 |
| BLUE ORIGIN MANUFACTURING, LLC | RAPID DDT&E AND DEMONSTRATION OF S SUSTAINABLE HUMAN LANDING SYSTEM INTEGRATED LANDER. | $1,987,372,021 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | MARS SAMPLE RETURN (MSR) PROGRAM - PHASE A 40-108270 | $1,605,134,076 |
| ASSOCIATION OF UNIVERSITIES FOR RESEARCH IN ASTRONOMY, INC. | THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS. | $1,589,272,070 |
| PERATON INC. | THE EXPLORATION AND SPACE COMMUNICATIONS PROJECTS DIVISION (ESC) IS A NATIONAL RESOURCE LOCATED AT GODDARD SPACE FLIGHT CENTER (GSFC) WHICH ENABLES SCIENTIFIC DISCOVERY AND SPACE EXPLORATION BY PROVIDING INNOVATIVE AND MISSION-EFFECTIVE SPACE COMMUNICATIONS AND NAVIGATION SOLUTIONS TO A LARGE COMMUNITY OF DIVERSE CUSTOMERS. ESC MANAGES OPERATIONAL GEOSTATIONARY COMMUNICATIONS RELAY SATELLITES AND GROUND SYSTEMS FOR THE SPACE COMMUNICATIONS AND NAVIGATION (SCAN) PROGRAM AT NASA HEADQUARTERS. TODAY, SCAN NETWORK SYSTEMS CONSIST OF THE SPACE NETWORK (SN), THE NEAR EARTH NETWORK (NEN), AND THE DEEP SPACE NETWORK (DSN). THE DAY-TO-DAY MANAGEMENT OF THESE THREE NETWORKS IS CURRENTLY NOT FULLY CONSISTENT. IT IS THE INTENTION OF THE GOVERNMENT TO UNIFY THE SN AND NEN WHERE PRACTICABLE UNDER THIS CONTRACT USING INTEGRATED, COMMON MANAGEMENT PRACTICES AND NETWORK SOLUTIONS. | $1,503,404,163 |
| THE BOEING COMPANY | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS | $1,336,720,376 |
| KBR WYLE SERVICES, LLC | IGF::CT::IGFMSOC FPDS-NG MISSION SYSTEMS OPERATIONS CONTRACT (MSOC) | $1,060,037,519 |
| L3HARRIS TECHNOLOGIES, INC. | TAS::80 0122::TAS DEVELOPMENT, MANUFACTURING AND SUPPORT TO WEATHER OBSERVING INSTRUMENT | $1,036,291,804 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | NEAR EARTH OBJECT SURVEYOR (NEO SURVEYOR) PROJECT (71-107722) | $887,370,046 |
| SYNCOM SPACE SERVICES LLC | IGF::OT::IGF SYNERGY-ACHIEVING CONSOLIDATED OPERATIONS AND MAINTENANCE, COST PLUS INCENTIVE FEE - INDEFINITE DELIVERY INDEFINITE QUANTITY | $817,387,492 |
| L3HARRIS TECHNOLOGIES, INC. | ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE CROSS TRACK INFRARED SOUNDER (CRIS) INSTRUMENT AND SUPPORT. | $814,435,946 |
| KBR WYLE SERVICES, LLC | GROUND SYSTEMS AND MISSION OPERATIONS (GSMO-3) | $641,006,214 |
| AMENTUM SPACEPORT LLC | BASE OPERATIONS AND SPACEPORT SERVICES (BOSS) CONTRACT | $634,704,286 |
| LOCKHEED MARTIN CORPORATION | TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS | $486,440,471 |
| SCIENCE SYSTEMS AND APPLICATIONS, INC. | THE PURPOSE OF THIS CONTRACT IS TO ACQUIRE SCIENTIFIC RESEARCH SERVICES THAT CONCEIVES, DEVELOPS AND APPLIES SPACE, FIELD-DEPLOYED (I.E. AIRBORNE AND IN SITU) AND LABORATORY BASED TECHNOLOGIES AND OBSERVATIONS OF THE EARTH SYSTEMS. | $467,185,870 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | MASS CHANGE (MC) PRE-PHASE A AND PHASE A PLAN (89-109861) | $445,052,655 |
| AXIOM SPACE INC | EXPLORATION EXTRAVEHICULAR ACTIVITY SERVICE (XEVAS) ARTEMIS PROGRAM | $414,362,340 |
| SYNCOM SPACE SERVICES LLC | IGF::OT::IGF SYNERGY-ACHIEVING CONSOLIDATED OPERATIONS AND MAINTENANCE, COST PLUS INCENTIVE FEE, CORE WORK | $391,753,857 |
| AIR PRODUCTS AND CHEMICALS, INC | THIS DELIVERY ORDER IS ISSUED PURSUANT TO THE SCHEDULE OF SUPPLIES, CONTRACT PERIOD PRICING, OTHER PRICING OPTIONS, AND TERMS AND CONDITIONS OF CONTRACT 80KSC023DA010 FOR HELIUM AT KENNEDY SPACE CENTER. | $351,551,422 |
| ALCYON TECHNICAL SERVICES (ATS) JV, LLC | IGF::CL::IGF SYSTEMS ENGINEERING ADVANCED SERVICES (SEAS). UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE MISSION AND INSTRUMENT SYSTEMS ENGINEERING (M&ISE) SERVICES TO THE MISSION ENGINEERING&SYSTEMS ANALYSIS DIVISION AND RELATED APPLIED ENGINEERING AND TECHNOLOGY DIRECTORATE ORGANIZATIONS FOR THE FORMULATION AND IMPLEMENTATION OF FLIGHT AND GROUND SYSTEMS AS WELL AS DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES. | $350,917,796 |
| L3HARRIS TECHNOLOGIES, INC. | GEOXO IMAGER (GXI) INSTRUMENT IMPLEMENTATION | $343,955,638 |
| PERATON INC. | THE ETIS III CONTRACT WILL PROVIDE ENVIRONMENTAL TEST AND INTEGRATION RELATED SERVICES FOR NASA GSFC ENGINEERING AND TECHNOLOGY DIRECTORATE (ETD) MECHANICAL SYSTEMS DIVISION AND RELATED ORGANIZATIONS FOR THE FORMULATION, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACEFLIGHT AND GROUND SYSTEM HARDWARE AND SOFTWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. | $341,709,066 |
| AEROJET ROCKETDYNE, INC. | EXPLORATION UPPER STAGE ENGINES MSFC WILL PROCURE TEN (10) RL10 FLIGHT ENGINES FROM AEROJET ROCKETDYNE, INC. TO SUPPORT THE SPACE LAUNCH SYSTEM (SLS) EXPLORATION MISSIONS 2 AND 3 (EM-2 AND EM-3). EACH FLIGHT WILL REQUIRE A FOUR (4) ENGINE CLUSTER. ADDITIONALLY, TWO (2) SPARE ENGINES WILL BE PROCURED. CORRESPONDING TO THESE SPECIFIC RL10 ENGINES, NASA MSFC WILL PROCURE VEHICLE AND PROGRAM INTEGRATION SUPPORT, FLIGHT SUPPORT, AND HUMAN RATING COMPLIANCE REVIEW SUPPORT. | $287,084,371 |
| AMENTUM TECHNOLOGY, INC. | IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 1 (MAINTENANCE). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR) CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED AIR, ELECTRICAL POWER DISTRIBUTION, POTABLE WATER) TECHNOLOGY DEVELOPMENT/ADMINISTRATION (E.G., FACILITY AUTOMATION SYSTEMS [FAS], DATA ACQUISITION SYSTEMS [DAS]) RESEARCH AND INSTITUTIONAL FACILITY MAINTENANCE (E.G., PREVENTIVE MAINTENANCE, TROUBLE CALLS, RELIABILITY CENTERED MAINTENANCE [RCM], FACILITY CONDITION ASSESSMENT [FCA]) AND FACILITY ENGINEERING (E.G., DESIGN, CONSTRUCTION, CONFIGURATION MANAGEMENT, TACTICAL ENGINEERING, PRESSURE SYSTEM RECERTIFICATION, PROJECT MANAGEMENT/PLANNING SUPPORT). | $273,056,082 |
| AMENTUM TECHNOLOGY, INC. | IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 2 (OPERATIONS). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR); CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED AIR, ELECTRICAL POWER DISTRIBUTION, POTABLE WATER); TECHNOLOGY DEVELOPMENT/ADMINISTRATION (E.G., FACILITY AUTOMATION SYSTEMS [FAS], DATA ACQUISITION SYSTEMS [DAS]); RESEARCH AND INSTITUTIONAL FACILITY MAINTENANCE (E.G., PREVENTIVE MAINTENANCE, TROUBLE CALLS, RELIABILITY CENTERED MAINTENANCE [RCM], FACILITY CONDITION ASSESSMENT [FCA]); AND FACILITY ENGINEERING (E.G., DESIGN, CONSTRUCTION, CONFIGURATION MANAGEMENT, TACTICAL ENGINEERING, PRESSURE SYSTEM RECERTIFICATION, PROJECT MANAGEMENT/PLANNING SUPPORT). | $261,235,568 |
| CACI, INC. - FEDERAL | NASA CONSOLIDATED APPLICATION AND PLATFORM SERVICES (NCAPS) | $250,934,271 |
| RSI-QUANTITECH JV LLC | MARSHALL ENGINEERING TECHNICIANS AND TRADES SUPPORT (METTS III) COVERS A WIDE RANGE OF ENGINEERING TECHNICIANS AND TRADE SKILLS TO PERFORM TESTING GROUND AND SPACE BASED RESEARCH TEST OPERATIONS DATA ANALYSIS INSTRUMENTATION CALIBRATION | $242,292,296 |
| GENERAL ELECTRIC COMPANY | THE REQUIREMENT IS TO ASSIST NASA IN ACCELERATING THE INTRODUCTION OF MEGAWATT CLASS EAP SYSTEMS INTO FUTURE AIRCRAFT PRODUCTS BY U.S. INDUSTRY. THIS EFFORT HELPS TO IDENTIFY CERTIFICATION GAPS, AND ADDRESS GAPS THROUGH GROUND TEST AND FLIGHT TESTS. | $214,925,976 |
| TELEDYNE BROWN ENGINEERING, INC. | IGF::OT::IGF LAUNCH VEHICLE/STAGES ADAPTER | $208,686,024 |
| MILLENNIUM ENGINEERING AND INTEGRATION SERVICES, LLC | IGF::OT::IGF THE AMES RESEARCH CENTER(ARC)PROJECT AND ENGINEERING SUPPORT SERVICES (PESS) | $202,588,310 |
| REGENTS OF THE UNIVERSITY OF CALIFORNIA, THE | TIME HISTORY OF EVENTS&MACROSCALE INTERACTIONS DURING SUBSTORMS (THEMIS) MISSION PHASE A EFFORT THE CONTRACTOR SHALL PROVIDE A CONCEPT STUDY FOR THE THEMIS MISSION IN ORDER TO PROVIDE NASA WITH MORE DEFINITIVE INFORMATION REGARDING THE COST, RISK, AND FEASIBILITY OF THE INVESTIGATION. THE CONTRACTOR SHALL PREPARE AND DELIVER A CONCEPT STUDY REPORT DETAILING THE RESULTS OF THE STUDY IN ACCORDANCE WITH ATTACHMENT B OF THE CONTRACT ENTITLED "MEDIUM-CLASS EXPLORER PROGRAM GUIDELINES AND CRITERIA FOR THE PHASE A CONCEPT STUDY". THE CONTRACTOR SHALL ALSO SUPPORT A NASA SITE VISIT AT ITS FACILITY TO DISCUSS THE CONCEPT STUDY REPORT AND ATTEND A PHASE A CONCEPT STUDY REVIEW MEETING, BRIDGE PHASE OPTION: THE CONTRACTOR SHALL COMMENCE INITIAL DEFINITION PHASE ACTIVITIES, INCLUDING LONG LEAD PARTS PROCUREMENTS. AND THE FOLLOWING ACTIVITIES: - PROVIDE PROGRAM MANAGEMENT FOR THEMIS - BEGIN SCIENTIFIC STUDIES AND SIMULATIONS TO PROVIDE SCIENTIFIC INPUT FOR INSTRUMENT AND ORBIT DESIGN ENSURING THEY MEET SCIENCE GOALS - BEGIN THE DESIGN AND DEVELOPMENT AND INSTRUMENTS, OTHER HARDWARE, AND ELECTRONICS AND - BEGIN FLIGHT SOFTWARE DEVELOPMENT | $200,537,577 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | MARS PROGRAM MANAGEMENT AND FUTURE PLANNING 60-8583 | $193,623,820 |
| LOCKHEED MARTIN CORPORATION | INTERFACE REGION IMAGING SPECTROGRAPH (IRIS). THE CONTRACTOR SHALL REFINE AND EVOLVE THE CONTRACTOR'S COST ESTIMATE FOR PHASES B-F FOR THE INTERFACE REGION IMAGING SPECTROGRAPH (IRIS) MISSION SUBMITTED IN RESPONSE TO NASA ANNOUNCEMENT OF OPPORTUNITY #NNH07ZDA003O FOR THE EXPLORERS PROJECTS DIVISION. THE PRIMARY TASKS IN PHASE B WILL INCLUDE THE GENERATION AND PRESENTATION OF THE SYSTEMS REQUIREMENTS REVIEW (SRR) AND THE PRELIMINARY DESIGN REVIEW (PDR). IN ORDER TO SUPPORT THESE REVIEWS, THE CONCEPT DEFINITION EFFORTS SHALL ENCOMPASS THE WORK REQUIRED TO UPDATE AND REFINE THE PROPOSAL'S SCIENCE INVESTIGATION OBJECTIVES AND PLANS (IF NECESSARY), INSTRUMENT AND SPACECRAFT CONCEPTS AND PERFORMANCE CHARACTERISTICS, AND SCIENCE OPERATIONS AND FLIGHT OPERATIONS PLANS AND CONCEPTS. THESE EFFORTS SHALL IDENTIFY THE CONDITIONS AND CONSTRAINTS NECESSARY FOR THE DEVELOPMENT OF AN INTEGRATED IRIS MISSION APPROACH. THE CONTRACTOR'S MISSION INTEGRATION EFFORTS SHALL INCLUDE CONSIDERATIONS FOR THE ACCOMMODATION OF THE IRIS OBSERVATORY ONTO THE LAUNCH VEHICLE. THE CONTRACTOR'S PHASE B PRELIMINARY DESIGN EFFORTS SHALL DEVELOP THE CSR AND SITE VISIT CONCEPTS INTO A PRELIMINARY DESIGN AND DEFINITION OF THE IRIS MISSION, INCLUDING ITS MISSION OPERATIONS CENTER (MOC) AND SCIENCE OPERATIONS CENTER (SOC). THE PRELIMINARY DESIGN REVIEW (PDR) SHALL BE HELD IN ACCORDANCE WITH NPR 7120.5D, NPR 7123.1A, AND GSFC STD 1001B. THE CONTRACTOR'S EFFORTS IN PHASE B SHALL FORM THE BASIS FOR FINAL ATION OF THE REMAINDER OF THE IRIS DEVELOPMENT AND OPERATIONAL PHASES (C, D, E AND F). DETAILED COST AND SCHEDULE ESTIMATES SHALL BE PREPARED AND SUBMITTED DURING PHASE B, WHICH DEFINES THE CONTRACTOR'S UPDATED BUDGET FOR PHASE B AND THE PLANNED BUDGETS FOR PHASE C, D, E AND F WORK. PERIODIC TECHNICAL AND PROGRAMMATIC INTERCHANGE MEETINGS AT BOTH THE CONTRACTOR'S FACILITY AND AT GSFC SHALL BE REQUIRED TO COORDINATE EFFORTS BETWEEN THE CONTRACTOR AND THE EXPLORERS PROJECTS OFFICE. THESE MAY BE CONDUCTED AS FACE-TO-FACE MEETINGS OR TELECONFERENCES, AS REQUIRED. | $193,275,152 |
| AMENTUM TECHNOLOGY, INC. | IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 402 (FFP IDIQ). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR); CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED AIR, ELECTRICAL POWER DISTRIBUTION, POTABLE WATER); TECHNOLOGY DEVELOPMENT/ADMINISTRATION (E.G., FACILITY AUTOMATION SYSTEMS [FAS], DATA ACQUISITION SYSTEMS [DAS]); RESEARCH AND INSTITUTIONAL FACILITY MAINTENANCE (E.G., PREVENTIVE MAINTENANCE, TROUBLE CALLS, RELIABILITY CENTERED MAINTENANCE [RCM], FACILITY CONDITION ASSESSMENT [FCA]); AND FACILITY ENGINEERING (E.G., DESIGN, CONSTRUCTION, CONFIGURATION MANAGEMENT, TACTICAL ENGINEERING, PRESSURE SYSTEM RECERTIFICATION, PROJECT MANAGEMENT/PLANNING SUPPORT). | $189,367,442 |
| THE LELAND STANFORD JUNIOR UNIVERSITY | SOLAR DYNAMICS OBSERVATORY PROJECT HELIOSEISMIC AND MAGNETIC IMAGER INVESTIGATION (HMI) PHASE B/C/D/E THE CONTRACTOR SHALL PROVIDE PERSONNEL, MATERIALS, EQUIPMENT, FACILITIES AND RESOURCES NECESSARY FOR DESIGN, ANALYSIS, DEVELOPMENT, FABRICATION, ASSEMBLY, INTEGRATION, TESTING, CALIBRATION, QUALIFICATION AND DELIVERY OF A FLIGHT INSTRUMENT FOR SPACECRAFT INTEGRATION. DURING SPACECRAFT INTEGRATION ACTIVITIES, THE CONTRACTOR SHALL SUPPORT INSTRUMENT INSTALLATION AND INTEGRATION, INTEGRATED SPACECRAFT TESTING AND FLIGHT QUALIFICATION, LAUNCH PROCESSING AND LAUNCH. FOLLOWING LAUNCH, THE CONTRACTOR SHALL PROVIDE THE NECESSARY ENGINEERING AND SCIENCE RESOURCES TO PERFORM INITIAL ON-ORBIT CHECKOUT AND CHARACTERIZATION OF THE INSTRUMENT AND SHALL CONDUCT SCIENCE OPERATIONS FOR THE REMAINING DURATION OF THE MISSION. THE PRINCIPAL HARDWARE DELIVERABLES OF THIS EFFORT ARE THE FLIGHT HARDWARE AND SOFTWARE CONSTITUTING THE FLIGHT INSTRUMENT PACKAGE AND THE NECESSARY SCIENCE PROCESSING AND SCIENCE OPERATIONS GROUND SYSTEMS AND SOFTWARE REQUIRED TO ANALYZE, PROCESS, DISTRIBUTE AND ARCHIVE THE SCIENCE MEASUREMENTS PERFORMED BY THE INSTRUMENT. | $182,819,613 |
| ASSOCIATION OF UNIVERSITIES FOR RESEARCH IN ASTRONOMY, INC. | THIS CONTRACT IS FOR THE PRODUCTS AND SERVICES ASSOCIATED WITH THE DESIGN PHASE OF THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST) SCIENCE OPERATIONS CENTER (SOC) | $179,225,457 |
| ASTRION GROUP, LLC | LABORATORY SUPPORT SERVICES AND OPERATIONS II (LASSO) II CONTRACT | $164,275,692 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | EXOPLANET EXPLORATION ION PROGRAM (EXEP) SCIENCE&RESEARCH TECHNOLOGY (ST&T) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASA S DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8) JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS (STEM) DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. | $164,108,588 |
| KBR WYLE SERVICES, LLC | HHPC2 TO | $160,695,060 |
| PERATON INC. | NSROC IV CONTRACTOR SHALL DESIGN, FABRICATE, INTEGRATE, & PERFORM FLIGHT QUALIFICATION TESTING OF SUB-ORBITAL PAYLOADS, PROVIDE LAUNCH VEHICLES & ASSOCIATED HARDWARE, & PROVIDE VARIOUS ACTIVITIES ASSOCIATED WITH SUBSEQUENT MISSION LAUNCH OPERATIONS | $158,599,367 |
| CGI FEDERAL INC. | PROGRAM SUPPORT SERVICES (CPSS) PROGRAMMATIC SUBJECT MATTER EXPERT (SME) IDIQ TASK ORDER FOR MARSHALL SPACE FLIGHT CENTER (MSFC). | $158,194,606 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | INCUS (INVESTIGATION OF CONVECTIVE UPDRAFTS) (89-111155) | $155,472,798 |
| YULISTA SOLUTIONS, LLC | THE PURPOSE OF CHARLES IS TO PROVIDE SUPPORT FOR AIRCRAFT AT JSC, BASED AT ELLINGTON FIELD IN HOUSTON, AND AT EL PASO, TEXAS | $155,093,264 |
| AXIENT LLC | IGF::OT::IGF ORS RAPID RESPONSE BRANCH. COMMUNICATIONS DEVELOPMENT UNDER THE RRSW IDIQ CONTRACT. THE CONTRACTOR SHALL FURNISH ALL LABOR, SUPPLIES, MATERIALS, TRAVEL, OTHER DIRECT COSTS, AND FEES NECESSARY TO ACCOMPLISH THE REQUIREMENTS CONTAINED IN THE ATTACHED TASK ORDER. | $133,312,995 |
| AXIOM SPACE INC | EXTRAVEHICULAR ACTIVITY (EVA) DEMONSTRATION | $131,014,257 |
| ARES TECHNICAL SERVICES CORPORATION | KENNEDY EXPLORATION GROUND SYSTEMS (EGS) PROGRAM (LX) SUPPORT SERVICES CONTRACT THREE (KLXS III). | $117,950,981 |
| AMENTUM TECHNOLOGY, INC. | IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 403 (CPFF IDIQ). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR); CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED AIR, ELECTRICAL POWER DISTRIBUTION, POTABLE WATER); TECHNOLOGY DEVELOPMENT/ADMINISTRATION (E.G., FACILITY AUTOMATION SYSTEMS [FAS], DATA ACQUISITION SYSTEMS [DAS]); RESEARCH AND INSTITUTIONAL FACILITY MAINTENANCE (E.G., PREVENTIVE MAINTENANCE, TROUBLE CALLS, RELIABILITY CENTERED MAINTENANCE [RCM], FACILITY CONDITION ASSESSMENT [FCA]); AND FACILITY ENGINEERING (E.G., DESIGN, CONSTRUCTION, CONFIGURATION MANAGEMENT, TACTICAL ENGINEERING, PRESSURE SYSTEM RECERTIFICATION, PROJECT MANAGEMENT/PLANNING SUPPORT). | $116,565,321 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | PLANETARY SCIENCE PROGRAM SUPPORT 40-15961 | $111,209,405 |
| FOUR POINTS TECHNOLOGY, L.L.C. | THIS DELIVERY ORDER IS FOR PROVIDING AN ENTERPRISE-WIDE SOLUTION FOR CLOUD SERVICES | $110,814,151 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | RESEARCH AND ANALYSIS (R&A), EARTH SCIENCE, CLIMATE VARIABILITY AND CHANGE | $109,361,932 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | EMIT (EARTH SURFACE MINERAL DUST SOURCE INVESTIGATION) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASA S DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8) JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS (STEM) DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. | $109,055,342 |
| AGILE DECISION SCIENCES, LLC | SCIENCE MISSION DIRECTORATE (SMD) SOLICITATION PEER REVIEW PROGRAM PORTFOLIO SUPPORT | $107,425,846 |
| SYNCOM SPACE SERVICES LLC | SYNERGY-ACHIEVING CONSOLIDATED OPERATIONS AND MAINTENANCE, COST PLUS INCENTIVE FEE - INDEFINITE DELIVERY INDEFINITE QUANTITY | $106,938,018 |
| THE REGENTS OF THE UNIVERSITY OF COLORADO | TAS::80 0120::TAS THIS CONTRACT IS FOR THE TASKS NECESSARY TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, EVALUATE AND SUPPORT LAUNCH OF THE EUVS XRS IRRADIANCE SENSORS (EXIS), SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE EXIS IS CLASSIFIED AS A NON-PRIMARY INSTRUMENT SUITE ON THE GOES-R SATELLITE AND HAS A RISK CLASSIFICATION OF B. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR 4 FLIGHT MODELS B) ONE EXIS FLIGHT MODEL (FM) C) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) D) TWO EXIS EMULATORS (EXISES) E) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) F) ONE GROUND PROCESSING DEVELOPMENT SYSTEM (GPDS) G) SPARES FOR THE FOUR FMS H) ALL ADDITIONAL EXIS MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT I) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER AND SUPPORT: A) OPTION 1 FOR AN ADDITIONAL FLIGHT MODEL (FM-2) B) OPTION 2 FOR AN ADDITIONAL FLIGHT MODEL (FM-3) C) OPTION 3FOR AN ADDITIONAL FLIGHT MODEL (FM-3) | $105,260,132 |
| NORTHROP GRUMMAN SYSTEMS CORPORATION | THIS EFFORT IS FOR WORK PERFORMED DURING PHASE B THROUGH F OF THE TRANSITING EXOPLANET SURVEY SATELLITE (TESS) MISSION. THE SPECIFIC REQUIREMENTS FOR EACH OF THESE PHASES ARE PRESENTED IN INDIVIDUAL SECTIONS BELOW. THE EFFORT ALSO INCLUDES TASKS TO: DESIGN, ANALYZE, VALIDATE, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, TEST, AND DELIVER THE TESS SPACECRAFT; INTEGRATE, TEST, AND OPERATE THE TESS OBSERVATORY; AND DEVELOP, TEST, OPERATE, AND SUSTAIN THE ASSOCIATED MISSION OPERATIONS CENTER (MOC). THE CONTRACTOR IS RESPONSIBLE FOR THE DEVELOPMENT OF THE SPACECRAFT AND CAMERA ACCOMMODATION STRUCTURE, INCLUDING THE SUNSHADE. THE TESS INSTRUMENT, CONSISTING OF THE CAMERA STRUCTURE ASSEMBLY, DATA HANDLING UNIT AND HARNESS, WILL BE PROVIDED AS GOVERNMENT FURNISHED EQUIPMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INTEGRATION ACTIVITIES BETWEEN THE INSTRUMENT AND THE SPACECRAFT WITH INSTRUMENT PERSONNEL SUPPORT. THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, MATERIALS, FACILITIES AND RESOURCES NECESSARY TO CONDUCT THESE ACTIVITIES. | $103,107,122 |
| SYNCOM SPACE SERVICES LLC | SYNERGY - ACHIEVING CONSILIDATED OPERATIONS AND MAINTENANCE (SACOM) | $99,521,873 |
| OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | PROGRAM MANAGEMENT OF THE NASA POSTDOCTORAL PROGRAM 2 | $99,158,263 |
| NORTHROP GRUMMAN SYSTEMS CORPORATION | PROVIDE AIRCRAFT AND GROUND CONTROL STATION (GCS) SPARE PARTS AND PROVIDE ENGINEERING, MAINTENANCE TECHNICIAN, LOGISTICS TECHNICIAN AND PILOT SUPPORT. | $98,128,411 |
| SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | NATIONAL CENTER FOR CRITICAL INFORMATION PROCESSING AND STORAGE (NCCIPS) | $91,139,299 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | VERITAS (VENUS EMISSIVITY, RADIO SCIENCE, INSAR, TOPOGRAPHY, AND SPECTROSCOPY) (41-108259) | $90,419,625 |
| VIRGINIA ELECTRIC AND POWER COMPANY | ELECTRICITY SERVICES | $77,639,320 |
| REGENTS OF THE UNIVERSITY OF CALIFORNIA, THE | ESCAPE AND PLASMA ACCELERATION AND DYNAMICS EXPLORERS (ESCAPADE) MISSION -.PHASE A CONCEPT STUDY. | $68,528,505 |
| MCCALLIE ASSOCIATES, INC. | MISSION SYSTEMS ENGINEERING AND PAYLOAD AND INSTRUMENT SYSTEMS ENGINEERING SERVICES AS WELL AS GUIDANCE, NAVIGATION, AND CONTROL SYSTEMS SERVICES, WHICH INCLUDES GUIDANCE, NAVIGATION AND CONTROL (GN&C) SYSTEMS ENGINEERING AND ATTITUDE CONTROL SYSTEMS | $67,088,581 |
| ADVANCED SPACE LLC | PHASE III - CAPSTONE EXTENDED MISSION | $66,457,610 |
| BAE SYSTEMS SPACE & MISSION SYSTEMS INC. | IGF::OT::IGF THE AFT OPTICS SYSTEM(AOS) SOURCE PLATE ASSEMBLY (ASPA); TINSLEY CLOSEOUT, OPTICAL INTEGRATION AND TESTING; AND SPECIAL STUDIES, FOR THE JAMES WEBB SPACE TELESCOPE. THE CONTRACTOR SHALL DESIGN, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, AND TEST THE HARDWARE DESCRIBED IN THE STATEMENT OF WORK (SOW). THE HARDWARE, IF USED INSIDE A VACUUM CHAMBER OR IS ATTACHED TO, OR CONTROLS FLIGHT HARDWARE, MUST COMPLY WITH THE REQUIREMENTS IN THE SOW. FOR NON-HARDWARE SUPPORT ASPECTS OF THIS EFFORT, THE CONTRACTOR S SHALL PROVIDE THE SYSTEMS ENGINEERING; EXPERT PERSONNEL; TRAVEL; REPORTS AND DOCUMENTATION; SOFTWARE OR SOFTWARE CHANGES; GROUND SUPPORT EQUIPMENT INTEGRATION, OPERATIONS AND MODIFICATION DEFINITION, NECESSARY TO ACCOMPLISH THE EFFORT. THE CONTRACTOR SHALL MANAGE ALL ASPECTS OF THIS CONTRACT EFFORT TO ENSURE THAT THE CONTRACT REQUIREMENTS ARE MET OR EXCEEDED. | $66,287,487 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | SURFACE BIOLOGY & GEOLOGY (SBG) - THERMAL INFRARED (TIR) - PHASE B (89-224991) | $66,076,764 |
| ASRC FEDERAL SYSTEM SOLUTIONS LLC | RESEARCH FACILITIES AND ENGINEERING SUPPORT SERVICES (RF&ESS) | $64,128,357 |
| KBR WYLE SERVICES, LLC | THIS CONTRACT SUPPORTS A WIDE ARRAY OF GEODYNAMIC, GEOMAGNETIC, GEOPHYSICAL, AND ATMOSPHERIC INVESTIGATIONS OF SOLAR SYSTEM BODIES SUCH AS THE EARTH, VENUS, MARS, AND MERCURY. AMONG THE REQUIREMENTS FOR THESE INVESTIGATIONS ARE INSTRUMENT DEVELOPMENT; SOFTWARE DEVELOPMENT AND MAINTENANCE; DATA COLLECTION, ARCHIVING AND DISSEMINATION; SCIENTIFIC DATA ANALYSIS, MODELING AND INTERPRETATION; REPORTS AND PRESENTATIONS OF SCIENTIFIC RESULTS; PUBLIC OUTREACH AND EDUCATION; AND ASSOCIATED TECHNICAL AND ADMINISTRATIVE WORK. THE CONTRACTOR SHALL PROVIDE SUPPORT TO INVESTIGATORS ASSOCIATED WITH CURRENT PROGRAMS AND PROJECTS SUCH AS GRACE, THE OCEAN SURFACE TOPOGRAPHY MISSION, THE INTERDISCIPLINARY STUDIES IN EARTH SCIENCE, ICESAT, AND FUTURE MISSIONS OUTLINED IN THE ROADMAP OF EARTH-SCIENCE MISSIONS DEFINED THE NATIONAL ACADEMY OF SCIENCE DECADAL SURVEY, SUCH AS SWOT, DESDYNI, ICESAT-2, GPSRO, AND GRACE FOLLOW-ON. THE CONTRACTOR SHALL PROVIDE SUPPORT TO INVESTIGATORS INVOLVED IN ANALYSIS OF SPACE GEODETIC DATA (SLR, DORIS, AND GNSS), USED FOR GEODETIC ANALYSIS, PRECISION ORBIT DETERMINATION, AND THE DETERMINATION AND MAINTENANCE OF THE TERRESTRIAL REFERENCE FRAME. THE CONTRACTOR SHALL PROVIDE SUPPORT TO INVESTIGATORS INVOLVED WITH LAGEOS-1, LAGEOS-2, STARLETTE, STELLA, LARETS, LARES, EARTH POSITIONING SATELLITES SUCH AS GPS, GALILEO, AND GLONASS; EARTH ALTIMETRY SATELLITES SUCH AS TOPEX/POSEIDON, JASON-1, JASON-2, GEOSAT, GEOSAT-FOLLOW-ON (GFO-1), GFO-2, CRYOSAT-2; PLANETARY SPACECRAFT SUCH AS MARS GLOBAL SURVEYOR, MARS ODYSSEY, LUNAR RECONNAISSANCE ORBITER, THE MARS RECONNAISSANCE ORBITER, MESSENGER, AND MAVEN. THE CONTRACTOR SHALL PROVIDE SUPPORT FOR DATA SYSTEMS SUCH AS THE CDDIS. THE CONTRACTOR SHALL PROVIDE ADMINISTRATIVE SUPPORT FOR MEETINGS. | $61,572,708 |
| THE REGENTS OF THE UNIVERSITY OF COLORADO | EXTREME ULTRAVIOLET VARIABILITY EXPERIMENT (EVE) FOR THE SOLAR DYNAMICS OBSERVATORY(SDO) | $59,422,222 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | UNINHABITED AERIAL VEHICLE SYNTHETIC APERTURE RADAR OPERATIONS (UAVSAR) 87-12820 | $57,272,417 |
| AGILE DECISION SCIENCES, LLC | NRESS-II MANAGEMENT AND IT SUPPORT | $57,041,491 |
| TRAX INTERNATIONAL CORPORATION | GODDARD LOGISTICS SERVICES CONTRACT - THE PRINCIPAL PURPOSE OF THIS REQUIREMENT IS TO SUPPORT NASA GSFC LOGISTICS MANAGEMENT NEEDS IN ORDER TO MEET EARTH SCIENCE, SPACE SCIENCE, AND EXPLORATION MISSION REQUIREMENTS. | $54,256,393 |
| THE AEROSPACE CORPORATION | NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS). | $53,880,797 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | JPL LUNAR DRONES (54-232663) | $51,700,000 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX) | $51,646,380 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | ATMOSPHERIC INFRARED SOUNDER (AIRS) ADVANCED MICROWAVE SOUNDING UNIT (AMSU) HUMIDITY SOUNDER FROM BRAZIL (HSB) PROJECT TEAM LEADER FACILITY 88-8223 | $48,959,788 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | RESEARCH AND ANALYSIS (R&A), EARTH SYSTEM MODELING AND ANALYSIS | $47,891,104 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | VOYAGER INTERSTELLAR MISSION (VIM) 70-5159 | $45,062,547 |
| AXIENT LLC | IGF::OT::IGF OPEN MANUFACTURING TASK ORDER THE CONTRACTOR SHALL FURNISH ALL LABOR, SUPPLIES, MATERIALS, TRAVEL, OTHER DIRECT COSTS, AND FEES NECESSARY TO ACCOMPLISH THE REQUIREMENTS CONTAINED IN THE ATTACHED STATEMENT OF WORK. SEE NEXT PAGE. | $43,524,072 |
| THUNDERCAT TECHNOLOGY, LLC | NASA CISCO SOFTWARE, HARDWARE AND CUSTOMER EXPERIENCE (CX) ENTERPRISE AGREEMENTS (EA). | $39,397,910 |
| AMENTUM TECHNOLOGY, INC. | IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 3 (ENGINEERING). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR); CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED AIR, ELECTRICAL POWER DISTRIBUTION, POTABLE WATER); TECHNOLOGY DEVELOPMENT/ADMINISTRATION (E.G., FACILITY AUTOMATION SYSTEMS [FAS], DATA ACQUISITION SYSTEMS [DAS]); RESEARCH AND INSTITUTIONAL FACILITY MAINTENANCE (E.G., PREVENTIVE MAINTENANCE, TROUBLE CALLS, RELIABILITY CENTERED MAINTENANCE [RCM], FACILITY CONDITION ASSESSMENT [FCA]); AND FACILITY ENGINEERING (E.G., DESIGN, CONSTRUCTION, CONFIGURATION MANAGEMENT, TACTICAL ENGINEERING, PRESSURE SYSTEM RECERTIFICATION, PROJECT MANAGEMENT/PLANNING SUPPORT). | $39,375,390 |
| ICON TECHNOLOGY INC | FY22 SBIR PHASE III - DESIGN, DEVELOPMENT, FABRICATION TESTING, AND DELIVERY OF LUNAR CONSTRUCTION SYSTEM FOR DEMONSTRATION | $33,373,727 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | NASA ENGINEERING AND SAFETY CENTER (NESC) SUPPORT 30-8743 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. | $32,535,220 |
| INFLEQTION QUANTUM, LLC | QGG APP TECHNOLOGY MATURATION AND DESIGN BASED ON AN ATOM CHIP | $32,034,904 |
| HITT CONTRACTING, INC. | PHASE IA -APPLIED SPACEFLIGHT FABRICATION FACILITY (ASFF) PROJECT | $30,259,198 |
| ALUTIIQ ESSENTIAL SERVICES LLC | THE CONTRACTOR SHALL PROVIDE SERVICES IN THE FOLLOWING AREAS: GENERAL LABORATORY, METROLOGY ASSURANCE, MEASUREMENT STANDARDS AND CALIBRATION, GAS AND MATERIAL ANALYSIS, ENVIRONMENTAL LABORATORY, AND GEOGRAPHIC INFORMATION SYSTEM. | $30,110,000 |
| THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC | WIDEBAND TERMINAL FLIGHT DEMONSTRATION TASK ORDER UNDER 80MSFC20D0004 AEROSPACE RESEARCH, DEVELOPMENT AND ENGINEERING SUPPORT (ARDES) II. | $29,867,929 |
| CIVIL WORKS CONTRACTING LLC | THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIAL AND RELATED ACTIVITIES NECESSARY TO REPAIR/UPGRADE INDUSTRIAL WATER PUMPING STATION, BLDG. J7-1388 AT KENNEDY SPACE CENTER, FLORIDA. | $29,379,125 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | JPL SUPPORT TO THE HUMAN LANDING SYSTEM (HLS) PROGRAM (40-108827) | $28,844,840 |
| MACLEAN ENGINEERING & APPLIED TECHNOLOGIES, L.L.C. | SIMULATION AND ADVANCED SOFTWARE SERVICES II (SASS II) TASK ORDER | $26,730,765 |
| UNITED LAUNCH SERVICES, LLC | CENTAUR UPPER STAGE FOR SPACE LAUNCH SYSTEM (SLS) TO BE PROVIDED IN SUPPORT OF THE ARTEMIS PROGRAM TO MEET NASA SLS PERFORMANCE SPECIFICATIONS AND TECHNICAL REQUIREMENTS. | $26,000,000 |
| MILLENNIUM SPACE SYSTEMS, INC. | MISSION OPERATIONS SUPPORT FOR AQUILLA II SPACECRAFT | $24,142,046 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | ASSURANCE TECHNOLOGY PROGRAM OFFICE (ATPO) 50-13143 | $23,494,139 |
| ALPHA SPACE TEST AND RESEARCH ALLIANCE, LLC | SPACE SCIENCE & TECHNOLOGY EVALUATION FACILITY FIRST FLIGHT. A GENERAL-PURPOSE LUNAR TESTBED PROVIDING POWER AND DATA SERVICES TO INDIVIDUAL EXPERIMENTS/PAYLOADS FOR TESTING AT LUNAR SURFACE | $22,099,122 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | JPL SUPPORT TO SPACEX FOR HUMAN LANDING SYSTEM BASE PERIOD (40-109107) | $21,522,948 |
| NOVA SPACE SOLUTIONS, LLC | THIS COSMIC TASK ORDER IS CREATED FOR FUNDING OF THE COSMIC CORE SERVICES FOR COST PRICE INCENTIVE FEE CLIN 1004 OF 80SSC025D0001. | $21,444,320 |
| AMENTUM SERVICES, INC. | KENNEDY PROPELLANT AND LIFE SUPPORT SERVICES (KPLSS) II FY26 CUSTOMER FUNDING. | $20,630,233 |
| ARIZONA STATE UNIVERSITY | IGF::OT::IGF NASA IS SOLICITING PROPOSALS FOR SCIENTIFIC INSTRUMENTS THAT MIGHT REVEAL ANSWERS ABOUT LUNAR RESOURCES THAT COULD SUPPORT THE AGENCY'S JOURNEY TO MARS. NASA WOULD SPONSOR THE INSTRUMENTS TO FLY ON A LUNAR ORBITER DESIGNED BY THE KOREA AEROSPACE RESEARCH INSTITUTE (KARI). THE SPACECRAFT, THE KOREA PATHFINDER LUNAR ORBITER (KPLO), IS SCHEDULED TO LAUNCH IN DECEMBER 2018, AND IS PART OF KARI'S KOREA LUNAR EXPLORATION PROGRAM, WHICH AIMS TO ROBOTICALLY EXPLORE THE MOON THROUGH A SERIES OF ORBITER AND LANDER MISSIONS, STARTING WITH THE KPLO. KARI, HEADQUARTERED IN DAEJEON, SOUTH KOREA, PROVIDED NASA WITH ABOUT 33 POUNDS (15 KILOGRAMS) OF PAYLOAD MASS ABOARD THE KPLO, WHICH IS SCHEDULED TO LAUNCH INTO LUNAR ORBIT IN DECEMBER 2018. IN SEPTEMBER 2016, NASA ISSUED A SOLICITATION SEEKING SCIENCE INSTRUMENTS THAT COULD INCREASE OUR UNDERSTANDING OF THE DISTRIBUTION OF VOLATILES, SUCH AS WATER, INCLUDING THE MOVEMENT OF SUCH RESOURCES TOWARD PERMANENTLY SHADOWED REGIONS AND HOW THEY BECOME TRAPPED THERE. SHADOWCAM WILL MAP THE REFLECTANCE WITHIN THE PERMANENTLY SHADOWED REGIONS TO SEARCH FOR EVIDENCE OF FROST OR ICE DEPOSITS. THE INSTRUMENT'S OPTICAL CAMERA IS BASED ON THE LUNAR RECONNAISSANCE ORBITER NARROW ANGLE CAMERA, BUT IS 800 TIMES MORE SENSITIVE, ALLOWING IT TO OBTAIN HIGH-RESOLUTION, HIGH SIGNAL-TO-NOISE IMAGING OF THE MOON'S PERMANENTLY SHADOWED REGIONS. SHADOWCAM WILL OBSERVE THE PSRS MONTHLY TO DETECT SEASONAL CHANGES AND MEASURE THE TERRAIN INSIDE THE CRATERS, INCLUDING THE DISTRIBUTION OF BOULDERS. NASA'S ADVANCED EXPLORATION SYSTEMS DIVISION (AES) LED THE PAYLOAD SOLICITATION AND SELECTION FOR THE NASA INSTRUMENT ON KPLO. A DIVISION OF THE HUMAN EXPLORATION AND OPERATIONS MISSION DIRECTORATE, AES USES INNOVATIVE APPROACHES AND PUBLIC-PRIVATE PARTNERSHIPS TO RAPIDLY DEVELOP PROTOTYPE SYSTEMS, ADVANCE KEY CAPABILITIES, AND VALIDATE OPERATIONAL CONCEPTS FOR FUTURE HUMAN MISSIONS BEYOND EARTH ORBIT. THROUGH THIS PARTNERSHIP OPPORTUNITY WITH KARI, AES IS ADDRESSING KEY LUNAR SKGS WHILE COMPLEMENTING KARI'S PRIMARY MISSION OBJECTIVES AND INSTRUMENTS. | $20,487,054 |
| HEALTHEON, INC | DESIGN BUILD TO MODIFY PUMPHOUSE (ORBITAL PROCESSING FACILITY) AND DISTRIBUTION CENTER. | $19,980,410 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | ELECTRIC PROPULSION SUPPORT TO THE ADVANCED ELECTRIC PROPULSION SYSTEM (AEPS) ACQUISITION AND DELIVERY THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASA S DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8) JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS (STEM) DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. | $19,395,919 |
| AEGIS AEROSPACE INC | DEEP SPACE LOGISTICS ENGINEERING SUPPORT (LENS) TASK ORDER ISSUED UNDER THE GENERAL SERVICES ADMINISTRATION (GSA) ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES (OASIS). | $19,353,920 |
| BLUE ORIGIN, LLC | COMMERCIAL LUNAR PAYLOAD SERVICES (CLPS) TASK ORDER CT-3 | $18,720,211 |
| HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC. | DELIVER THE UNIVERSAL WASTE MANAGEMENT SYSTEM (UWMS) FOR TECHNOLOGY DEMONSTRATION TO THE INTERNATIONAL SPACE STATION (ISS). PROVIDE SUSTAINING ENGINEERING SERVICES FOR THREE YEARS OF UWMS OPERATIONS. | $18,409,036 |
| INUTEQ, LLC | IDIQ PROCUREMENT SERVICES TASK ORDER UNDER NASA ADVANCED COMPUTING SERVICES (NACS) CONTRACT. | $18,251,288 |
| LOCKHEED MARTIN CORPORATION | IGF::OT::IGF ADVANCED TECHNOLOGY | $17,321,891 |
| UNIVERSITY OF WISCONSIN SYSTEM | VISIBLE INFRARED IMAGING RADIOMETER SUITE (VIIRS) ATMOSPHERE SCIENCE INVESTIGATOR-LED PROCESSING SYSTEM (SIPS) | $16,994,438 |
| CLEAR LAKE CITY WATER AUTHORITY | WATER AND SEWAGE TREATMENT UTILITY CONTRACT | $16,694,331 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | SCIENCE MISSION DIRECTORATE, RESEARCH AND ANALYSIS FOR SPACE SCIENCE, TERRESTRIAL PLANETS AND LUNAR SCIENCE | $16,525,452 |
| DIVERSIFIED CONSTRUCTION OF OKLAHOMA, INC. | BOOSTER FABRICATION FACILITY (BFF) INTERIORS RENOVATIONS, KENNEDY SPACE CENTER, FLORIDA | $16,513,867 |
| UNIVERSITY OF ALASKA FAIRBANKS | THE OBJECTIVE OF THIS EFFORT IS TO PROVIDE NASA AND OTHER U.S. GOVERNMENT AGENCIES (WORKING THROUGH NASA) WITH A DOMESTIC, NORTHERN LATITUDE, SOUNDING ROCKET LAUNCH SITE FOR CONDUCTING SCIENTIFIC INVESTIGATIONS. | $16,293,789 |
| GEXA ENERGY, LP | ELECTRICITY SUPPLY & ANCILLARY SERVICES FOR JSC (JSC, EF, SCTF) | $16,188,735 |
| CREATIVE MANAGEMENT TECHNOLOGY, INC. | JANITORIAL SERVICES | $15,561,642 |
| STARFISH SPACE INC. | FY24 SBIR PHASE III - SSPICY - STARFISH SPACE ORBITAL DEBRIS INSPECTION MISSION | $14,999,999 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | JPL SUPPORT TO THE LANDER TECHNOLOGY PROJECT 47-700008 | $14,832,941 |
| NEW HORIZONS AERONAUTICS, LLC | RESEARCH ENGINEERING AND FLIGHT OPERATIONS UNDER ENGINEERING TECHNICAL SUPPORT SERVICES (ETSS) | $13,541,358 |
| METIS FLIGHT RESEARCH ASSOCIATES, LLC | SIMLABS III TECHNICAL SERVICES IDIQ, OPTION PERIOD TWO | $13,132,389 |
| YULISTA SOLUTIONS, LLC | SUPPORT THE MAINTENANCE OPERATIONS OF ALL AIRCRAFT AS ASSIGNED BY NASA. SUPPORT THE FLIGHT CREW OPERATIONS OF ALL AIRCRAFT ASSIGNED TO NASA CENTERS. PROJECT AND AIRCRAFT PARTS SUSTAINMENT SERVICES AND AEROSPACE GROUND EQUIPMENT SUPPORT SERVICES. | $12,106,277 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | SOUTH POLE SEISMIC STATION (SPSS) (40-232473) | $11,846,000 |
| MASSACHUSETTS INSTITUTE OF TECHNOLOGY | IGF::OT::IGF NASA GODDARD SPACE FLIGHT CENTER (GSFC) HAS A NEED TO OBTAIN SUPPORT IN ACHIEVING THE GOALS OF THE SPACE GEODESY PROJECT (SGP). THE GOALS OF THIS ACTIVITY ARE RELATED TO THE STUDY OF THE SHAPE OF THE EARTH AND HOW IT ROTATES. THIS EFFORT WILL BE A FOLLOW-ON TO NASA GSFC CONTRACT NNG10HP00C WITH MASSACHUSETTS INSTITUTE OF TECHNOLOGY (MIT)/HAYSTACK OBSERVATORY (HO) FOR RESEARCH AND DEVELOPMENT FOR THE STATE-OF-THE-ART NEXT GENERATION VERY LONG BASELINE INTERFEROMETRY (VLBI) SYSTEMS IN SUPPORT OF THE NASA SGP. UNDER THIS CONTRACT EFFORT MIT HAYSTACK OBSERVATORY SHALL PROVIDE CONSTRUCTION AND INSTALLATION OF THE SIGNAL CHAINS FOR THREE NEXT GENERATION GEODETIC VLBI ANTENNAS AND VALIDATION OF THE COMPLETED SYSTEMS; OPERATIONS SUPPORT IN THE FORM OF CORRELATION OF GEODETIC VLBI DATA, OPERATION OF THE WESTFORD ANTENNA, AND ENGINEERING SUPPORT FOR THE NASA GEODETIC NETWORK; AND CONTINUED DEVELOPMENT OF THE NEXT GENERATION GEODETIC VLBI SYSTEMS. THE HO SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND EQUIPMENT NECESSARY TO PROVIDE SUPPORT TO NASA GSFC IN ACHIEVING THE GOALS OF THE SGP. THE SCOPE OF THIS EFFORT IS LIMITED TO FIVE SPECIFIC AREAS (CALLED TASKS): 1. BUILDING VLBI GLOBAL OBSERVING SYSTEMS (VGOS) 2. VGOS SYSTEM VALIDATION 3. OPERATIONS AND SUSTAINING ENGINEERING 4. FORWARD LOOKING DEVELOPMENT 5. PROJECT MANAGEMENT | $11,625,740 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | JPL SUPPORT TO BLUE FED FOR HUMAN LANDING SYSTEM BASE PERIOD (40-109108) | $11,496,584 |
| AKIMA GLOBAL LOGISTICS, LLC | MSFC LOGISTICS SUPPORT SERVICES II BASE YEAR FLIGHT HARDWARE SUPPORT OPERATIONS TASK ORDER. | $11,027,898 |
| SOUTHWEST RESEARCH INSTITUTE | DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, VERIFY, EVALUATE, SUPPORT LAUNCH, SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT MISSION OPERATIONS AT NOSF. | $10,563,683 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | RESEARCH OPPORTUNITIES FOR SPACE AND EARTH SCIENCES (ROSES) | $10,318,804 |
| GENEX SYSTEMS, LLC | GEOSPATIAL SUPPORT SERVICES 2 (GSS 2) | $10,174,698 |
| KBR WYLE SERVICES, LLC | THIS TASK ORDER (TO) IS IN DIRECT SUPPORT OF THE SAFETY & MISSION ASSURANCE, AUDITS, ASSESSMENTS, AND ANALYSIS (SA3) CONTRACT, 80GRC024DA008. IT PROVIDES SAFETY AND QUALITY ASSURANCE SUPPORT. | $9,982,431 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | R*A FY25 - PLANETARY SCIENCE | $9,832,422 |
| AIR PRODUCTS AND CHEMICALS, INC | SSC DELIVERY ORDER (DO) FOR LIQUID HYDROGEN (LH) | $9,737,197 |
| REGENTS OF THE UNIVERSITY OF MICHIGAN | DRAGONFLY MASS SPECTROMETER (DRAMS), ELECTRONICS MODULES (EM) | $9,673,796 |
| 4M RESEARCH, INC | INDEPENDENT VALIDATION AND VERIFICATION (IV&V) ENGINEERING SERVICES | $9,636,656 |
| METIS FLIGHT RESEARCH ASSOCIATES, LLC | SIMLABS III - TECHNICAL SERVICES (IDIQ)- OPTION PERIOD ONE SYSTEM ENGINEERING SERVICES TO SUPPORT SIMULATION EXPERIMENTS, TO ENSURE CONTINUING OPERATION AND EVOLUTIONARY IMPROVEMENT OF SIMULATION FACILITIES AND PROVIDE SW DEVELOPMENT CAPABILITIES. | $9,562,645 |
| CHENEGA GLOBAL PROTECTION, LLC | NASA PROTECTIVE SERVICES - EAST REGION - GSFC BASELINE SERVICES - CONTRACT YEAR 4 | $9,464,309 |
| BARRIOS TECHNOLOGY, LLC | PROJECT COORDINATION SUPPORT TO LANGLEY RESEARCH CENTER ORGANIZATIONS IN SUPPORT OF PROGRAMS AND PROJECTS. | $9,367,035 |
| ANALYTICAL MECHANICS ASSOCIATES, INC. | THIS TASK ORDER PROVIDES SUPPORT FOR VARIOUS PROJECTS IN THE ENTRY SYSTEMS AND TECHNOLOGY DIVISION. THESE TASKS INCLUDE REQUIREMENTS TO SUPPORT THERMAL PROTECTION SYSTEMS. | $9,049,842 |
| AGILE DECISION SCIENCES, LLC | NRESS-II STMD SUPPORT | $8,966,044 |
| THE TRUSTEES OF COLUMBIA UNIVERSITY IN THE CITY OF NEW YORK | SEDAC FACILITATES THE ANALYSIS AND PORTRAYAL OF THE HUMAN DIMENSIONS OF GLOBAL CHANGE NEEDED FOR EARTH SCIENCE RESEARCH. | $8,821,160 |
| DRACE CONSTRUCTION CORP | DESIGN-BUILD (D-B) SITEWIDE ELECTRICAL UPGRADES AT STENNIS SPACE CENTER (SSC), MS | $8,816,304 |
| GENESIS ENGINEERING SOLUTIONS, INC. | GEOSPACE DYNAMICS CONSTELLATION (GDC) MODULAR SPECTROMETER FOR ATMOSPHERE AND IONOSPHERE CHARACTERIZATION (MOSAIC) INSTRUMENT INVESTIGATION | $8,708,690 |
| AXIOM SPACE INC | EXPLORATION EXTRAVEHICULAR ACTIVITY SERVICES (XEVAS) | $8,697,277 |
| THE AEROSPACE CORPORATION | NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION, AND TEST SERVICES SUPPORT FOR COMMERCIAL CREW PROGRAM SAFETY AND MISSION ASSURANCE. | $8,658,700 |
| ANALYTICAL MECHANICS ASSOCIATES, INC. | THIS TASK ORDER PROVIDES SUPPORT FOR VARIOUS PROJECTS IN THE ENTRY SYSTEMS AND TECHNOLOGY DIVISION. THIS TASK INCLUDES REQUIREMENTS TO SUPPORT THERMAL PROTECTION SYSTEMS. | $8,541,617 |
| THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC | DAVINCI+ PHASE A CONCEPT STUDY UNDER BASIC 80MSFC20D0004. | $8,281,400 |
| ANALYTICAL MECHANICS ASSOCIATES, INC. | DEVELOP NATIONAL PROGRAM SUPPORT SERVICES. MANAGE DEVELOP PROGRAM-WIDE PROJECT PORTFOLIO FROM PROPOSAL THROUGH EXECUTION AND HAND OFF OF DELIVERABLES, PUBLICATIONS, AND VIRTUAL ACTIVITIES. | $8,159,735 |
| TETRA TECH, INC. | WFF PFAS INVESTIGATION | $7,939,665 |
| CHENEGA GLOBAL PROTECTION, LLC | NASA FIRE SERVICES CONTRACT (NFSC) AMES TASK ORDER (FIRE SERVICES - STRUCTURAL). | $7,674,144 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | NASA RESEARCH ANNOUNCEMENT (NRA) NNH24ZDA001N‐AIAH FOR RESEARCH OPPORTUNITIES IN SPACE AND EARTH SCIENCE - 2026 (ROSES): ASTROPHYSICS | $7,500,277 |
| VICTORY SOLUTIONS, LLC | CONFIGURATION AND DATA MANAGEMENT (CDM) - CALL ORDER 02: MSFC SLS REQUIREMENTS FOR CDM | $7,320,461 |
| AIR PRODUCTS AND CHEMICALS, INC | THE PURPOSE OF THIS PROCUREMENT IS FOR LIQUID NITROGEN AND LIQUID OXYGEN. | $7,266,015 |
| V2X AEROSPACE LLC | THE CONTRACTOR SHALL SUPPORT ALL NASA ASSIGNED AIRCRAFT OPERATIONS, INCLUDING AIRCRAFT MAINTENANCE, AIRCRAFT MODIFICATION, AND FLIGHT-LINE OPERATIONS. | $7,209,789 |
| NORTHROP GRUMMAN SYSTEMS CORPORATION | IGF::OT::IGF ADVANCED TECHNOLOGY | $7,102,692 |
| CENTRA TECHNOLOGY, INC | IGF::OT::IGF RESEARCH AND DEVELOPMENT ADVANCED AIRCRAFT STUDIES ANALYSES, AND TEST SUPPORT (CPFF), TRAVEL (COST NO FEE | $7,018,536 |
| ASTRO DIGITAL US INC | MINIMUM GUARANTEED | $6,950,873 |
| AGILE DECISION SCIENCES, LLC | NASA RESEARCH AND EDUCATION SUPPORT SERVICES (NRESS)-II OFFICE OF STEM ENGAGEMENT (OSTEM) SUPPORT | $6,851,265 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | MISSION SYSTEMS AND TECHNOLOGY ANALYSIS SUPPORT 15-15962 | $6,625,660 |
| REI SYSTEMS, INC. | SBIR PHASE III - MVP PROSAMS DEVELOPMENT | $6,478,946 |
| TOM & JERRY, INC. | PROVIDE LOGISTICAL, COORDINATION, & MANAGEMENT SUPPORT CONDUCT EVENTS YEARLY WHICH MAY BE AT VARIOUS LOCATIONS LOCAL, NATIONAL, AND INTERNATIONAL SITES, IN ORDER TO DISSEMINATE ADMINISTRATIVE, SCIENTIFIC, AND TECHNICAL INFORMATION AGENCY-WIDE.. | $6,390,695 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | SMD PEER REVIEW PANELS 12-19273 | $6,348,622 |
| HEALTHEON, INC | TAINTER VALVE REHABILITATION | $6,258,715 |
| MASSACHUSETTS INSTITUTE OF TECHNOLOGY | THE PURPOSE OF THIS CONTRACT IS TO CONTINUE THE DEVELOPMENT AND MAINTENANCE OF NASA'S VERY LONG BASELINE INTERFEROMETRY (VLBI) STATIONS. | $6,233,621 |
| HONEYWELL INTERNATIONAL INC. | DEVELOPMENT OF FLIGHT-LIKE ADVANCED MATERIAL REACTOR (FLAMR) UNIT FOR THE HYDROGEN RECOVERY BY CARBON VAPOR INFILTRATION TECHNOLOGY | $6,204,606 |
| 1 - 8A ISO9001 FEDSYNC-BFS, LLC | JSC-WSTF ADMINISTRATIVE SUPPORT SERVICES | $6,102,237 |
| CHENEGA GLOBAL PROTECTION, LLC | STENNIS SPACE CENTER (SSC) PROTECTIVE SERVICES | $6,065,346 |
| APACHE ELECTRICAL CONTRACTORS INC | MINOR CONSTRUCTION TASK ORDER | $6,000,000 |
| JOHNSON VENTURE MANAGEMENT SOLUTIONS, INC. | OCCUPATIONAL HEALTH SUPPORT SERVICES | $5,875,514 |
| MESSER LLC | SSC DELIVERY ORDER (DO) FOR GASEOUS HELIUM (GHE) | $5,677,729 |
| ICAHN SCHOOL OF MEDICINE AT MOUNT SINAI | IDENTIFICATION OF BIOMARKERS AND PATHOLOGICAL MECHANISMS VIA LONGITUDINAL ANALYSIS OF NEUROLOGICAL AND CEREBROVASCULAR RESPONSES TO NEUROTOXIC STRESS USING A MULTI-CELLULAR INTEGRATED MODEL OF THE HUMAN BRAIN | $5,503,829 |
| INUTEQ, LLC | CORE TECHNICAL SERVICES TASK ORDER UNDER NASA ADVANCED COMPUTING SERVICES (NACS) CONTRACT. | $5,400,000 |
| GENERAL DYNAMICS INFORMATION TECHNOLOGY, INC. | TO PROVIDE EXPORT-IMPORT COMPLIANCE PROGRAM AND INTERNATIONAL TRAVEL DOCUMENT PROCESSING SUPPORT | $5,255,884 |
| ENCAPSULATE INC. | FY25 SBIR PHASE III - NVASIVE: UNRAVELING THE ENIGMA OF METASTASIS | $5,217,527 |
| AGILE DECISION SCIENCES, LLC | NRESS-II HRP SUPPORT | $5,186,978 |
| CEPEDA SYSTEMS & SOFTWARE ANALYSIS, INC. | SEE SECTION J, ATTACHMENT A, STATEMENT OF WORK (SOW) | $5,055,880 |
| LOCKHEED MARTIN CORP | THIS IS A FFP CONTRACT FOR NEXTSTEP2 APPENDIX R: LUNAR LOGISTICS AND MOBILITY STUDIES. | $4,990,832 |
| CHENEGA GLOBAL PROTECTION, LLC | NASA PROTECTIVE SERVICES CONTRACT - SOUTH REGION - TASK ORDER PROVIDES PROTECTIVE SERVICES SUPPORT AT MSFC. | $4,988,803 |
| OPTICAL SCIENCES, LLC | SPECIALIZED REAL-TIME DATA ANALYSIS AND SYSTEM DEVELOPMENT FOR ADVANCED PROPULSION SYSTEMS | $4,830,087 |
| ALLIUM US HOLDING LLC | NASA TECHNICAL STANDARD SYSTEMS | $4,818,818 |
| AVENGER AEROSPACE SOLUTIONS INC | GULFSTREAM-IV NEXT GENERATION AIRBORNE SYNTHETIC APERTURE RADAR MODIFICATION | $4,772,521 |
| WRIGHT BROS LLC | REPLACE SWITCHGEAR 1113A/B BOOSTER FABRICATION FACILITY CHILLER BUILDING L6-0147 | $4,677,856 |
| ANALYTICAL MECHANICS ASSOCIATES, INC. | SAFETY AND MISSION ASSURANCE UNDER ENGINEERING TECHNICAL SUPPORT SERVICES | $4,621,296 |
| LINDE INC. | KENNEDY SPACE CENTER LIQUID NITROGEN AND LIQUID OXYGEN DELIVERY | $4,595,751 |
| TWO INDEPENDENCE HANA OW, LLC | THIS CALL PROVIDES FOR REPAIRS, MAINTENANCE, ALTERATIONS, AND ELECTRICAL CONSUMPTION TO NASA HQ. | $4,588,520 |
| THE BOEING COMPANY | REIMBURSABLE SERVICES AT SANTA SUSANA FIELD LABORATORY (SSFL) | $4,504,404 |
| BLUE ORIGIN, LLC | THE OBJECTIVE OF THIS STUDY IS TO DEVELOP AND ASSESS A VARIETY OF END-TO-END LOGISTICS AND MOBILITY ARCHITECTURES. THE ASSESSMENTS WILL INCLUDE FIGURES OF MERIT THAT NASA CAN USE FOR SHAPING BUDGETS AND PROCUREMENT STRATEGIES. | $4,387,006 |
| CORNELL TECHNICAL SERVICES LLC | SCIENCE OFFICE FOR MISSION ASSESSMENTS PLANNING TASK | $4,351,729 |
| AIR PRODUCTS AND CHEMICALS, INC | THIS DELIVERY ORDER IS ISSUED PURSUANT TO THE SCHEDULE OF SUPPLIES, CONTRACT PERIOD PRICING, OTHER PRICING OPTIONS, AND TERMS AND CONDITIONS OF CONTRACT 80KSC026D0002. | $4,327,187 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | RISK ASSESSMENT FOR MOON TO MARS (54-232562) | $4,179,000 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | BIODIVERSITY AND ECOLOGICAL CONSERVATION VIRTUAL CENTER STUDY (53-233073) | $4,150,538 |
| AMENTUM TECHNOLOGY, INC. | AEROSPACE TESTING AND FACILITIES OPERATIONS AND MAINTENANCE (ATOM-5) THE PRINCIPAL PURPOSE OF THIS CONTRACT IS TO ACQUIRE SUPPORT SERVICES FOR THE ARC GROUNDS-BASED AEROSPACE TEST FACILITIES. | $4,130,833 |
| LITESPAR INC | LASER TRANSMITTERS FOR SMALLSATS IN SUPPORT OF AOS MISSION | $4,031,389 |
| 1 - 8A ISO9001 FEDSYNC-BFS, LLC | MULTI-CENTER ADMINISTRATIVE SUPPORT SERVICES (MCASS) FY 26 | $4,012,215 |
| WASHINGTON SUBURBAN SANITARY COMMISSION | TO PROVIDE WATER AND SEWAGE SERVICES FOR GODDARD SPACE FLIGHT CENTER(GSFC) GREENBELT, MD | $3,979,848 |
| VICTORY SOLUTIONS, LLC | CALL ORDER 01 - MSFC MULTI-MISSION REQUIREMENTS FOR CDM | $3,913,885 |
| EMPIRICAL SYSTEMS AEROSPACE INC | THIS TASK ORDER IS ISSUED IN SUPPORT OF MOD III WING&SYSTEM INTEGRATION. WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH ATTACHED PERFORMANCE WORK STATEMENT ENTITLED: "MOD III WING&SYSTEM INTEGRATION FOLLOW-ON" DATED 30 MAY 2019. | $3,825,503 |
| HONEYWELL INTERNATIONAL, INC | ENERGY AND WATER MANAGEMENT SERVICES (EWMS) - CALL 1 | $3,790,523 |
| BARRIOS TECHNOLOGY, LLC | THE CONTRACTOR SHALL PROVIDE THE PLANNING, COORDINATING, TECHNICAL MANAGEMENT, EXECUTION, AND SURVEILLANCE OF THE ACTIVITIES NECESSARY TO ASSURE DISCIPLINED PERFORMANCE OF WORK AND TIMELY APPLICATION OF RESOURCES FOR THIS CONTRACT. | $3,787,180 |
| UNITED SEMICONDUCTORS, LLC | UNITED SEMICONDUCTOR INSPA PHASE 2 | $3,760,000 |
| REGENTS OF THE UNIVERSITY OF MICHIGAN | DAVINCI (DV) VENUS MASS SPECTROMETER (VMS) ELECTRONICS MODULE | $3,604,601 |
| ANNA LISA LUNA CONSTRUCTION, INC. | REPAIR OF CENTER WIDE ELECTRICAL SYSTEMS | $3,560,431 |
| ANALYTICAL MECHANICS ASSOCIATES, INC. | THIS TASK ORDER WILL BE PROVIDING SUPPORT IN DEVELOPMENT AND ENGINEERING IN COMPUTATIONAL FLUID DYNAMICS TO THE NASA ADVANCED SUPERCOMPUTING COMPUTATIONAL AEROSCIENCES BRANCH, AND COMPUTATIONAL PHYSICS BRANCH. | $3,539,436 |
| THE AEROSPACE CORPORATION | HUMAN LANDING SYSTEM (HLS) PROGRAM OFFICE SUPPORT | $3,500,622 |
| METIS FLIGHT RESEARCH ASSOCIATES, LLC | SIMLABS III - SUBJECT MATTER EXPERT RECRUITMENT - OPTION ONE PROVIDE SMES E.G. PILOTS AND AIR TRAFFIC CONTROLLERS, TO HELP DEVELOP AND TEST EXPERIMENT SCENARIOS, CONDUCT FLIGHT SYSTEM OPERATIONS TRAINING, AND PROVIDE SPECIALIZED EXPERIMENT SUPPORT. | $3,413,151 |
| BRIMROSE TECHNOLOGY CORP | NASA AMES RESEARCH CENTER HAS BEEN COLLABORATING WITH BRIMROSE TO DEVELOP A SMALL, LOW-POWER POINT SPECTROMETER TO BE INCLUDED INTO THE NEAR INFRARED VOLATILES SPECTROMETER (NIRVSS) INSTRUMENT. THROUGH AN STTR CONTRACT, BRIMROSE SUCCESSFULLY DEVELOPED A DUAL-CHANNEL ACOUSTO-OPTIC TUNABLE FILTERS (AOTF) SPECTROMETER THAT OPERATES ACROSS 1300 AND 4000NM. AN AOTF IS AN ALL SOLID-STATE, TUNABLE FILTER WITH NO MOVING PARTS. THE AOTF IS A HIGH THROUGHPUT AND HIGH-SPEED, PROGRAMMABLE DEVICE CAPABLE OF ACCESSING WAVELENGTHS AT RATES OF 100 KHZ. INITIAL WORK HAS BEEN CONDUCTED VIA A SBIR PHASE III TO DEMONSTRATE THE AOTF SPECTROMETER WOULD HAVE SUFFICIENT PERFORMANCE TO MEET INSTRUMENT MEASUREMENT REQUIREMENTS. FOLLOWING THIS DEMONSTRATION, PRELIMINARY DESIGN WORK WAS BEGUN WITH BRIMROSE AS PART OF THE CURRENT PHASE II-X STTR CONTRACT. THIS WORK LEAD TO THE DELIVERY OF A FULLY FUNCTIONAL SPECTROMETER ENGINEERING TEST UNIT (ETU) THAT IS VERY FLIGHT-FORWARD IN DESIGN. THIS ETU HAS BECOME THE BASELINE SPECTROMETER FOR THE NIRVSS INSTRUMENT. ALSO PART OF THIS PHASE III EFFORT WAS THE DEVELOPMENT OF A BIFURCATED MULTI-FIBER OPTICAL FIBER CABLE WHICH INTEGRATES THE SPECTROMETER TO THE NIRVSS OBSERVATION BRACKET ASSEMBLY. BRIMROSE IS RESPONSIBLE FOR BOTH THE SPECTROMETER AND THE BIFURCATED OPTICAL FIBER CABLE. THE NIRVSS INSTRUMENT WAS SELECTED AS A SCIENCE AND TECHNOLOGY DEMONSTRATION PAYLOAD VIA THE NASA PROVIDED LUNAR PAYLOAD (NPLP) DEVELOPMENT PROGRAM TO FLY TO THE MOON USING U.S. COMMERCIAL LANDING DELIVERY SERVICES (CLPS). THE CLPS FLIGHT UNIT FOR THIS PROGRAM IS TO BE DELIVERED IN LATE SPRING, 2020. ACCOMMODATION OF THE NIRVSS INSTRUMENT ONTO CLPS LUNAR LANDED SERVICE PROVIDERS WILL OCCUR ONCE THE LANDER PROVIDERS ARE SELECTED (EXPECTED MAY, 2019). THIS SOW DESCRIBES THE NECESSARY TASKS AND DELIVERABLES IN SUPPORT OF THE CLPS FLIGHT UNIT. AS PART OF THIS ACCOMMODATION THE EXACT DIMENSIONS OF THE BIFURCATED MULTI-FIBER OPTICAL FIBER CABLE WILL BE DEFINED. THEREFORE, A LATER SOW MODIFICATION IS ANTICIPATED ONCE THESE DIMENSIONS ARE DEFINED. | $3,317,448 |
| MISSISSIPPI POWER CO | STENNIS SPACE CENTER (SSC) CONSTRUCTION OF FACILITIES (COF)ENERGY CONSERVATION PROJECT IN ACCORDANCE WITH THE INVESTMENT GRADE AUDIT (IGA) DATE 8/27/2021 OF THE MISSISSIPPI POWER COMPANY (MPC) UTILITY ENERGY SERVICES CONTRACT (UESC). | $3,305,186 |
| CONCURRENT REAL-TIME, INC. | THE CONCURRENT REAL-TIME ANNUAL IT MAINTENANCE/WARRANTY RENEWAL COVERS 635 EXISTING CONCURRENT IT UNITS OWNED BY NASA FOR 12 MONTHS. | $3,241,134 |
| PLANETARY SCIENCE INSTITUTE | THE CONTRACTOR SHALL CAPTURE INSTRUMENT REQUIREMENTS IN A PRELIMINARY INSTRUMENT FUNCTIONAL REQUIREMENTS DOCUMENT, INITIATE LONG-LEAD MATERIALS PROCUREMENT AND HOLD A HERITAGE REQUIREMENTS REVIEW. | $3,226,580 |
| SUNPOWER, INC | SUNPOWER ROBUST STIRLING CONVERTER (SRSC) SUPPORT AND PROTOTYPES - CONTACT CO FOR FURTHER INFORMATION. | $3,224,405 |
| CHENEGA GLOBAL PROTECTION, LLC | NASA PROTECTIVE SERVICES - EAST REGION - GSFC NON-BASELINE SERVICES - CONTRACT YEAR 4 | $3,209,828 |
| HX5 LLC | HUMAN LANDING SYSTEM SITE AVAILABILITY ANALYSIS SUPPORT AND GLENN RESEARCH CENTER COMMUNCATION ANALYSIS SUITE SOFTWARE SUPPORT | $3,069,608 |
| CARAHSOFT TECHNOLOGY CORP | CALL ORDER #1 - SALESFORCE NASA ENTERPRISE | $3,067,410 |
| CAYUSE FEDERAL SERVICES LLC | STENNIS SPACE CENTER - LABORATORY SERVICE CONTRACT | $3,055,385 |
| KEYSIGHT TECHNOLOGIES INC | KEYSIGHT RADIO FREQUENCY HARDWARE AND SOFTWARE | $3,044,302 |
| INSTITUTO PRESBITERIANO MACKENZIE | THIS ACQUISITION IS A FOLLOW-ON FOR THE OPERATION AND MAINTENANCE OF THE RADIO ASTRONOMY FACILITY AT THE SPACE RADIO OBSERVATORY(FORTALEZA) LOCATED IN THE CITY OF EUSEBIO, CEARA IN BRAZIL. | $3,009,584 |
| STANDARDAERO BUSINESS AVIATION SERVICES, LLC | THE OBJECTIVES ARE TO PROVIDE SERVICES FOR TWO ROLLS ROYCE MK511-8 AIRCRAFT ENGINES: ENGINE SERIAL NUMBER 11176 FROM NASA LARC IS TO UNDERGO A 1C INSPECTION AND THE CONTRACTOR SHALL PERFORM A 5Y2K SERVICE FOR ENGINE SERIAL NUMBER 8801 | $2,870,064 |
| AKIMA GLOBAL LOGISTICS, LLC | MSFC LOGISTICS SUPPORT SERVICES II OPTION PERIOD 1 NON-OPERATIONAL SUPPORT SERVICES | $2,868,830 |
| MINBURN TECHNOLOGY GROUP, LLC | THIS BPA CALL IS TO PURCHASE MICROSOFT POWER APPS PREMIUM PER QUOTE # MTG-NASA-MIC-05722 DATED 04/28/2026. | $2,827,440 |
| CGI FEDERAL INC. | THE PURPOSE OF THIS PERFORMANCE WORK STATEMENT (PWS) IS TO SET FORTH THE CONSOLIDATED PROGRAM SUPPORT SERVICES (CPSS) PROGRAM, PLANNING, & CONTROL (PP&C) AND PROGRAMMATIC SUBJECT | $2,770,270 |
| ANASPHERE, INC | INFLATABLE AERODYNAMIC DECELERATOR (IAD) TRACK C - SOLID STATE GAS GENERATOR DEVELOPMENT | $2,753,099 |
| CHENEGA GLOBAL PROTECTION, LLC | AFRC PROTECTIVE SERVICES CY3 | $2,704,410 |
| TECHPIPELINE INC. | THE CONTRACTOR WILL ADVISE NASAS TECHNOLOGY STRATEGY, PROVIDE INSIGHT INTO NASAS OVERALL TECHNOLOGY DEVELOPMENT PORTFOLIO, ADVOCATE AND COMMUNICATE THE VALUE OF NASA TECHNOLOGY TO INTERNAL AND EXTERNAL STAKEHOLDERS. | $2,695,284 |
| DIVERSIFIED CONSTRUCTION OF OKLAHOMA, INC. | JOHNSON SPACE CENTER EXTRAVEHICULAR ACTIVITY AND HUMAN SURFACE MOBILITY PROGRAM ROCK YARD (JERY) - CONSTRUCTION PROJECT TASK ORDER | $2,649,355 |
| HX5 LLC | THE EXISTING GRC ORPR HAS BEEN SELECTED AS THE DRIVE SYSTEM FOR THIS USF WIND TUNNEL TEST IN THE 9X15 WT. THE ORPR RIG REQUIRES UPGRADES TO SUPPORT THE USF TEST REQUIREMENTS. | $2,631,592 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | PROBE FAR-INFRARED MISSION FOR ASTROPHYSICS (PRIMA) 71-225526 | $2,616,961 |
| AIR PRODUCTS AND CHEMICALS, INC | DELIVERY ORDER FOR THE BULK PURCHASE OF LIQUID HYDROGEN FOR MARSHALL SPACE FLIGHT CENTER. | $2,612,638 |
| MESSER LLC | DELIVERY ORDER FOR LIQUID OXYGEN FOR STENNIS SPACE CENTER (SSC) AS DESCRIBED ON KENNEDY SPACE CENTER'S (KSC'S) BASE CONTRACT. | $2,579,334 |
| MESSER LLC | DELIVERY ORDER FOR THE BULK PURCHASE OF HELIUM FOR MARSHALL SPACE FLIGHT CENTER. | $2,546,283 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | NASA ARIEL SCIENCE CENTER (NASC) (77-217494) | $2,472,707 |
| RELIABLE ROBOTICS CORPORATION | PHASE III 80NSSC26C0071 AIR-TO-AIR RADAR (ATAR) FLIGHT TESTING AND DATA COLLECTION | $2,449,766 |
| BRYCE SPACE AND TECHNOLOGY, LLC | BPA CALL ORDER 2 UNDER CMSS SUPPORT SERVICES MULTIPLE AWARD BPAS FOR CMSS CYBERSECURITY POLICY. | $2,375,176 |
| TETRA TECH, INC. | ENVIRONMENTAL SERVICES AT STENNIS SPACE CENTER TO INCLUDE NASA SHARED SERVICES CENTER (NSSC) AND NATIONAL CENTER FOR CRITICAL INFORMATION PROCESSING AND STORAGE (NCCIPS). | $2,348,211 |
| ERIE AFFILIATES INC | PROJECT 25707 B301 LIQUID NITROGEN DISTRIBUTION SYSTEM | $2,345,911 |
| COLSA CORP | THIS IS A SPECIAL PROJECTS TASK ORDER WHICH PROVIDES SUPPORT TO 3.8.1.4.1.1 IT DEVELOPMENT | $2,255,588 |
| SIKICH CPA LLC | THE CONTRACTOR SHALL PROVIDE AN ANNUAL INDEPENDENT AUDIT OF THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) FINANCIAL STATEMENTS FOR FISCAL YEAR (FY) 2026 SUBJECT TO THE OVERSIGHT OF NASA OFFICE OF INSPECTOR GENERAL (OIG). | $2,221,851 |
| ERIE AFFILIATES INC | ISP DIFFUSER BACKSIDE COOLING | $2,198,650 |
| GENERAL ELECTRIC COMPANY | FUEL SYSTEMS II - IF MORE INFORMATION IS NEEDED, PLEASE CONTACT THE CO DIRECTLY. | $2,116,024 |
| FIRELAKE-ARROWHEAD NASA SERVICES 2 | CONSTRUCTION INSPECTION AND ADMINISTRATION SUPPORT FOR LANGLEY RESEARCH CENTER (LARC). | $2,032,548 |
| HX5 LLC | GEARS INTERN PROGRAM MSFC TO 0578 | $1,926,880 |
| VIRGINIA NATURAL GAS, INC. | NASA LANGLEY RESEARCH CENTER NATURAL GAS UTILITY CONTRACT WITH VIRGINIA NATURAL GAS THROUGH GSA'S AREA-WIDE-CONTRACT. | $1,917,561 |
| BRPH ARCHITECTS ENGINEERS INC | ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF INSTALL VEHICLE ASSEMBLY BUILDING (VAB) EXPLORATION MISSION 2 (EM-2) ENVIRONMENTAL CONTROL SYSTEMS (ECS) | $1,896,656 |
| FEDWRITERS, INC. | COMMUNICATION AND WRITER SERVICES SUPPORT TO THE AERONAUTICAL RESEARCH MISSION DIRECTORATE (ARMD) | $1,865,360 |
| PARAGON SPACE DEVELOPMENT CORPORATION | THE BUILD, TEST, AND DELIVERY OF 60 BPA BLADDERS. | $1,834,655 |
| INUTEQ, LLC | TECHNICAL SERVICES TASK ORDER UNDER NASA ADVANCED COMPUTING SERVICES (NACS) CONTRACT | $1,800,000 |
| STI LEGACY, INC. | FOUR FULL SERVICE PAYLOAD INTERGRATION USES | $1,760,000 |
| NATIONAL STEM CELL FOUNDATION INC. | DESIGN, DEVELOPMENT, AND TESTING OF GROUND AND FLIGHT UNIT(S) AS WELL AS COMPLETION OF FLIGHT DEMONSTRATION(S) ON THE ISS NATIONAL LAB (NL) OR A CLD OR OTHER LEO ORBITAL PLATFORM. | $1,675,000 |
| CORNELL TECHNICAL SERVICES LLC | THE SUBJECT TASK ORDER IS TO SUPPORT THE ASTROPHYSICS STRATEGIC MISSIONS PROGRAM OFFICE (ASMPO) | $1,576,421 |
| INUTEQ, LLC | CPFF IDIQ TECHNICAL SERVICES TASK ORDER UNDER NASA ADVANCED COMPUTING SERVICES (NACS) CONTRACT. | $1,529,127 |
| UNIVERSITY OF WASHINGTON | THE EARTH SYSTEM EXPLORERS PROGRAM (ESEP) STRATOSPHERE TROPOSPHERE RESPONSE USING INFRARED VERTICALLY-RESOLVED LIGHT EXPLORER (STRIVE) MISSION PHASE A CONCEPT STUDY. | $1,512,855 |
| HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC. | UNIVERSAL WASTE MANAGEMENT SYSTEM (UWMS) YEAR 4 QUARTER 1 MILESTONE | $1,512,670 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | LANDSLIDE CLIMATE CHANGE EXPERIMENT (LACCE) (87-223777) | $1,509,519 |
| MISSISSIPPI POWER CO | UTILITY ENERGY SERVICE CONTRACT B1111 IMPLEMENTATION AT STENNIS SPACE CENTER, MS | $1,481,415 |
| THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC | LUNANET INTEROPERABILITY SPECIFICATION DEVELOPMENT SUPPORT TASK ORDER UNDER THE ARDES II CONTRACT (80MSFC20D0004) | $1,454,499 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | JPL TECHNICAL SUPPORT TO THE MAVEN PROJECT 40-15537 | $1,438,371 |
| LOCKHEED MARTIN CORPORATION | PISCES II | $1,437,707 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | THE CONTRACTOR SHALL, FOR GODDARD SPACE FLIGHT CENTER (GSFC), SUPPORT THE JWST CYCLE4 EARLY RELEASE SCIENCE (ERS), GUEST OBSERVER (GO) AND ARCHIVAL (AR) PROGRAM | $1,428,221 |
| ACCURA ENGINEERING AND CONSULTING SERVICES, INC. | PROVIDE ARCHITECTURAL AND ENGINEERING TIME FOR PRODUCING MULTIPLE DESIGNS FOR THE REPLACEMENT OF METAL ROOFS IN SUPPORT OF FACILITIES WORK REQUEST (FWR) R001149681. | $1,421,461 |
| ENSEMBLE GOVERNMENT SERVICES, LLC | OPEN INNOVATION SERVICES 2 (NOIS2) CROWDSOURCING NOIS2-159 CAS DISCOVERY TEAM FREELANCE SUPPORT - NASA | $1,415,653 |
| BOOZ ALLEN HAMILTON INC | STRATEGIC PROFESSIONAL ENGINEERING ASSESSMENT CONTRACT II (SPEACII) - TASK ORDER 133 ARTEMIS EXPLORATION SYSTEMS DEVELOPMENT MISSION DIRECTORATE (ESDMD) STRATEGIC ASSESSMENT II | $1,369,331 |
| NATIONAL INSTITUTE OF AEROSPACE ASSOCIATES | CONTINUATION OF FAR TERM TECHNOLOGY DASHBOARD TO SUPPORT THE AATT PROJECT. THE ADVANCED AIR TRANSPORT TECHNOLOGY (AATT) PROJECT S OVERARCHING GOAL IS TO EXPLORE AND DEVELOP TECHNOLOGIES AND CONCEPTS TO REVOLUTIONIZE THE ENERGY EFFICIENCY, ENVIRONMENTAL COMPATIBILITY, AND ECONOMIC IMPACT OF FIXED WING TRANSPORT AIRCRAFT. TO IDENTIFY TECHNOLOGY AND VEHICLE SOLUTIONS THAT MEET THE PROJECT S GOALS REQUIRES THE USE OF SYSTEM-LEVEL ANALYSIS WITH THE APPROPRIATE LEVEL OF FIDELITY TO QUANTIFY FEASIBILITY, INTERDEPENDENCIES BETWEEN TECHNOLOGIES, BENEFITS, AND DEGRADATIONS. PRIOR WORK HAS RESULTED IN A DASHBOARD CAPABILITY THAT ESTIMATES THE BENEFITS OF AATT TECHNOLOGIES ON CONVENTIONAL TUBE AND WING CONFIGURATIONS. THIS PROVIDES THE AATT PROJECT AN ABILITY TO EXAMINE DIFFERENT SCENARIOS AND TRADEOFFS USING AN INTERACTIVE ENVIRONMENT THAT ENABLES USER DEFINED TECHNOLOGY SCENARIOS TO BE SELECTED WITH RAPID ESTIMATES OF BENEFITS AGAINST METRICS OF INTEREST SUCH AS FUEL CONSUMPTION, NOISE, AND EMISSIONS. HOWEVER, THERE IS A NEED TO EXTEND THIS CAPABILITY TO UNDERSTAND THE IMPACT OF UNCONVENTIONAL CONFIGURATIONS AND TECHNOLOGIES, SUCH AS HYBRID-ELECTRIC PROPULSION. THERE IS ALSO A NEED TO UPDATE THE BASELINES USED TO DETERMINE TECHNOLOGY BENEFITS TO BE MORE REPRESENTATIVE OF NEW IN-SERVICE AIRCRAFT. THE MAJOR OBJECTIVE FOR THE PROPOSED RESEARCH IS TO ENHANCE THE AATT TECHNOLOGY DASHBOARD BY UPDATING BASELINE REFERENCE VEHICLES AND INCORPORATING THE EVALUATION OF TECHNOLOGIES ON UNCONVENTIONAL CONFIGURATIONS. IN ADDITION, PREVIOUSLY COMPILED INFORMATION ON AATT TECHNOLOGIES WILL BE UPDATED AS NEEDED TO ENSURE THE COMPLETE TECHNOLOGY DATABASE IS CURRENT. STUDIES AND DATA RESULTING FROM NASA CONTRACT NNL13AA08B TASK ORDER NNL17AA71T SHALL BE THE INITIAL STARTING POINT FOR THIS TASK. | $1,358,610 |
| LOCKHEED MARTIN CORPORATION | THE CONTRACTOR SHALL PROVIDE THE ITEM OR SERVICES SPECIFIED IN SECTION B IN ACCORDANCE WITH THE FOLLOWING: SOW ENTITLED "SAFER III" WHICH WILL BE PROVIDED UNDER SEPARATE COVER. (END OF CLAUSE) | $1,333,537 |
| FIBERTEK, INC. | SPACE-BASED LASER TRANSMITTER FOR WATER AND METHANE DIAL | $1,309,409 |
| CITY OF NEWPORT NEWS | NASA LANGLEY RESEARCH CENTER POTABLE WATER SERVICE WITH NEWPORT NEWS WATERWORKS. | $1,300,576 |
| KONGSBERG SATELLITE SERVICES AS | NEAR SPACE NETWORK (NSN) SERVICES (SUBCATEGORIES 1.1 (EARTH PROXIMITY DIRECT TO EARTH (DTE)) AND 1.2 (GEO TO CIS-LUNAR DTE)) | $1,300,000 |
| AIR PRODUCTS AND CHEMICALS, INC | BULK LIQUID NITROGEN KENNEDY SPACE CENTER BASE CONTRACT 80KSC024DA013 CLIN 002 NASA GRC AND ATF TASK ORDER | $1,274,196 |
| PIVOTAL UTILITY HOLDINGS INC | NATURAL GAS DISTRIBUTION UTILITY SERVICE AT KENNEDY SPACE CENTER (KSC). | $1,242,452 |
| CORNELL TECHNICAL SERVICES LLC | COST MODEL PERFORMANCE ANALYSIS FOR USE ON 2025 EVALUATIONS INCLUDING EARTH SYSTEM EXPLORER (ESE) STEP 2, DYNAMIC STEP 2, 2025 ASTROPHYSICS SMALL EXPLORER (SMEX), AND ASTROPHYSICS PROBE EXPLORER (APEX) STEP 2. | $1,220,626 |
| CHENEGA GLOBAL PROTECTION, LLC | PROVIDE SAP SECURITY SUPPORT SERVICES FOR NASA HQ AND MULTIPLE CENTERS, INCLUDING PHYSICAL, PERSONNEL, CLASSIFIED INFORMATION, COMSEC, AND INDUSTRIAL SECURITY OPERATIONS, INSPECTIONS, ACCESS CONTROL, TRAINING, AND FACILITY ACCREDITATION SUPPORT. | $1,193,076 |
| 1 - 8A ISO9001 FEDSYNC-BFS, LLC | ADMINISTRATIVE SUPPORT SERVICES MCASS - SSC TASK ORDER FOR FY26 (CY1 PER ATTACHMENT 4.15 FBR IDIQ PRICING TABLE) | $1,186,408 |
| RECON RF, INC. | E014042 SBIR PHASE II HIGH-EFFICIENCY S-BAND SSPA FOR NEXT GENERATION NASA REMOTE SENSING SAR/INSAR PLATFORMS | $1,184,840 |
| AEROSTAR INTERNATIONAL, LLC | FLIGHT AND PAYLOAD INTEGRATION SERVICES FOR THE T0373 STRATOSPHERIC PROJECTILE EXPERIMENT OF ENTRY DYNAMICS (SPEED-2) PAYLOAD | $1,181,963 |
| ERIE AFFILIATES INC | PROJECT 33254 B301 HIGH POWER LAB | $1,180,848 |
| INTERCONN RESOURCES LLC | NATURAL GAS CONTRACT | $1,156,594 |
| MESSER LLC | LIQUID OXYGEN | $1,111,964 |
| KALSI ENGINEERING, INC | E014042 SBIR PHASE II MINIATURE PASSIVE THERMAL CONTROL VALVE FOR MIXING OR SPLITTING SINGLE-PHASE FLUID | $1,093,241 |
| THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC | DAVINCI+ SCIENCE SUPPORT | $1,069,393 |
| HDR ARCHITECTURE INC | POST DESIGN SWITCHGEAR RING BUS SERVICES | $1,064,493 |
| LANTERIS SPACE LLC | EDGE SPACECRAFT CONCEPT STUDY PHASE A | $1,049,927 |
| CONVERGENT MANUFACTURING TECHNOLOGIES US INC | E014042 STTR PHASE II PROCESS SIMULATION & OPTIMIZATION FOR THIN-PLY COMPOSITES | $1,026,839 |
| DH TECHNOLOGIES, INC. | FY26 CONSOLIDATED ATLASSIAN AND ATLASSIAN MARKETPLACE PLUGINS RENEWAL CALL ORDER #1 | $1,021,526 |
| CALIFORNIA INSTITUTE OF TECHNOLOGY | ASTRONAUT SPACESUIT MATERAIL JOINT CYCLE TESTING (40-226690) | $1,012,917 |
| BARRIOS TECHNOLOGY, LLC | CONSOLIDATED PROGRAM SUPPORT SERVICE PROJECT COORDINATION - TRAVEL AND TRAINING (ODC) | $1,012,895 |
| SPECIAL AEROSPACE SERVICES, LLC | LAUNCH VEHICLE EXPERTISE AND INSIGHT TO SUPPORT NASA INSIGHT INTO THE INTERNATIONAL LAUNCH INDUSTRY, FOCUSING ON RUSSIAN, UKRAINE, INDIA, CHINA, JAPAN, BUT OTHER RELEVANT SYSTEMS AS REQUIRED. | $1,005,519 |