DEPARTMENT OF TRANSPORTATION CALIFORNIA

Total received in grants · trailing 12 months
$1.24B
vs. GOVERNOR'S AUTHORIZED REPRESENTATIVE ($39.0B), largest tracked grant recipient
$9for every U.S. household÷ 131M U.S. households
In perspective
0.8%of all $162.9B in tracked grants
51separate grants, trailing 12 months

DEPARTMENT OF TRANSPORTATION CALIFORNIA has received $1.24B across 51 federal grants of $1M or more on record.

Data as of July 24, 2026. Source: USAspending.gov, prime contract awards $1M+. Federal spending data lags and has known gaps. This is not a real-time or complete record.

Grants by agency

Where this recipient’s grant dollars come from.

All grant awards

Swipe to see description and amount →

AgencyDescriptionAmount
PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25
$301,514,679
PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26
$292,923,548
PROJECT TITLE: RIVERSIDE COUNTY ON ROUTE 10 NEAR COACHELLA FROM 1.8 MILES EAST OF DILLON ROAD UNDERCROSSING TO 0.53 MILES WEST OF EAST CACTUS CITY UNDERCROSSING. RE :::: PROJECT DESCRIPTION: RIVERSIDE COUNTY ON ROUTE 10 NEAR COACHELLA FROM 1.8 MILES EAST OF DILLON ROAD UNDERCROSSING TO 0.53 MILES WEST OF EAST CACTUS CITY UNDERCROSSING. REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS (DESIGN BUILD)
$194,916,923
PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26
$85,165,861
PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26
$73,974,572
PROJECT TITLE: HUMBOLDT COUNTY NEAR BLUE LAKE FROM 0.9 MILE TO 2.1 MILES EAST OF BLUE LAKEBOULEVARD WALL CONSTRUCTION, EARTHWORK, AND DRAINAGE :::: PROJECT DESCRIPTION: ON STATE ROUTE: 299. HUMBOLDT COUNTY NEAR BLUE LAKE FROM 0.9 MILE TO 2.1 MILES EAST OF BLUE LAKEBOULEVARD WALL CONSTRUCTION, EARTHWORK, AND DRAINAGE
$52,526,532
PROJECT TITLE: CITY AND COUNTY OF SAN FRANCISCO FROM THE SAN MATEO COUNTY LINE TO THE BAYSHORE VIADUCT COLD PLANE AND OVERLAY WITH RHMA. REPLACE EXISTING PCC SLAB. :::: PROJECT DESCRIPTION: ON STATE ROUTE: 101. CITY AND COUNTY OF SAN FRANCISCO FROM THE SAN MATEO COUNTY LINE TO THE BAYSHORE VIADUCT COLD PLANE AND OVERLAY WITH RHMA. REPLACE EXISTING PCC SLAB.
$21,330,542
PROJECT TITLE: IN THE CITY OF LOS ANGELES, IN THE COMMUNITY OF EL SERENO, ON VALLEY BLVD BETWEEN SOTO STREET AND THE 710 FREEWAY THIS PROJECT IS TO IMPLEMENT A MULT :::: PROJECT DESCRIPTION: IN THE CITY OF LOS ANGELES, IN THE COMMUNITY OF EL SERENO, ON VALLEY BLVD BETWEEN SOTO STREET AND THE 710 FREEWAY THIS PROJECT IS TO IMPLEMENT A MULTI-MODAL MOBILITY AND ACCESS IMPROVEMENTS, PEDESTRIAN ACCESS ENHANCEMENTS, BICYCLE FACILITIES AND TRANSIT INFRASTRUCTURE IMPROVEMENTS, INCLUDING A DEDICATED BUS RAPID TRANSIT (BRT) ROUTE TO IMPROVE MOBILITY AND SAFETY ALONG THE VALLEY BLVD CORRIDOR. THE MAIN COMPONENT INCLUDES IMPLEMENTING A BRT ROUTE AS WELL AS REMOVE 3 NOS. OF AT-GRADE UNION PACIFIC RAILROAD (UPRR) CROSSINGS ALONG VALLEY BLVD.(TC)
$20,000,000
PROJECT TITLE: IN DEL NORTE COUNTY ABOUT 8 MILES SOUTH OF CRESCENT CITY FROM 0.2 ML SOUTH OF LAGOON CR CO PK TO BEG PASSING LN LT. SLIDE REPAIR. :::: PROJECT DESCRIPTION: ON STATE ROUTE: 101. IN DEL NORTE COUNTY ABOUT 8 MILES SOUTH OF CRESCENT CITY FROM 0.2 ML SOUTH OF LAGOON CR CO PK TO BEG PASSING LN LT. SLIDE REPAIR.
$18,298,100
PROJECT TITLE: ROCK SPRINGS ROAD OVER THE MOJAVE RIVER, BR. NO. 54C-0670 BRIDGE REPLACEMENT :::: PROJECT DESCRIPTION: ROCK SPRINGS ROAD OVER THE MOJAVE RIVER, BR. NO. 54C-0670 BRIDGE REPLACEMENT
$18,279,674
PROJECT TITLE: PLACER AND NEVADA COUNTIES FROM 0.3 MILE EAST OF DRUM FOREBAY OVERCROSSING TO 0.2MILE EAST OF TROY UNDERCROSSING RCP, WSP, AND ELECTRICAL SYSTEMS. :::: PROJECT DESCRIPTION: ON STATE ROUTE: 80. PLACER AND NEVADA COUNTIES FROM 0.3 MILE EAST OF DRUM FOREBAY OVERCROSSING TO 0.2MILE EAST OF TROY UNDERCROSSING RCP, WSP, AND ELECTRICAL SYSTEMS.
$16,668,500
PROJECT TITLE: IN THE CITY OF LOS ANGELES, THIS IS A TRAFFIC MANAGEMENT SYSTEM (TMS) PROJECT, LOCATED MAINLY ON LA-405 BETWEEN JEFFERSON BLVD (PM R25.9) & ROSCOE BL :::: PROJECT DESCRIPTION: ON STATE ROUTE: 405. IN THE CITY OF LOS ANGELES, THIS IS A TRAFFIC MANAGEMENT SYSTEM (TMS) PROJECT, LOCATED MAINLY ON LA-405 BETWEEN JEFFERSON BLVD (PM R25.9) & ROSCOE BLVD (PM 43.75). TRAFFIC W/IN THE PROJECT LIMITS EXPERIENCE BOTH RECURRENT & NON-RECURRENT CONGESTION, HOWEVER, THE FACILITY DOES NOT HAVE ADEQUATE TMS INFRASTRUCTURE TO ALLOW THE DISTRICT'S TRAFFIC MANAGEMENT CENTER (TMC) TO MONITOR & MANAGE THE TRAFFIC FLOW. THERE IS CURRENTLY LITTLE OR NO CLOSED-CIRCUIT TELEVISION (CCTV) COVERAGE W/IN THE PROJECT LIMITS. MOST OF THE EXISTING EQUIPMENT HAS EITHER COMMUNICATION OR WIRELESS COMMUNICATION THAT HAS INTERMITTENT ISSUES. UPGRADING EXISTING TMS FIELD ELEMENTS & INSTALLATION OF ADDITIONAL TMS INFRASTRUCTURE & FIBER OPTIC CABLES WILL PROVIDE MORE ACCURATE REAL-TIME TRAVELER INFORMATION, TRAVEL RELIABILITY CAN BE IMPROVED, IMPACTS OF THE CONGESTION CAN BE REDUCED, THE DURATION & EFFECTS OF NON-RECURRENT CONGESTION CAN BE MINIMIZED, & THE OVERALL EFFICIENCY & OPERATIONS OF THE ROUTE CAN BE MAXIMIZED. THE SCOPE OF WORK INCLUDED TWO BUILD ALTERNATIVES (A1 & A2). ALTERNATIVE A1 WILL REHABILITATE EXISTING TRANSPORTATION MANAGEMENT SYSTEM (TMS) & IT PROPOSES TO UPGRADE: TRAFFIC CENSUS STATIONS, TMS, RAMP METERING SYSTEMS (RMS), AND FIBER OPTIC COMMUNICATION SYSTEM. THERE WILL ALSO BE COMMUNICATION SYSTEM UPGRADE AT LOS ANGELES REGIONAL TRANSPORTATION MANAGEMENT CENTER (LARTMC) ON ROUTE 2 (PM R18.7), LOS ANGELES AIRPORT (LAX) HUB ON ROUTE 105 (PM R2.0), AND N. HOLLYWOOD HUB (NHD) ON ROUTE 101 (PM 11.8R). ALTERNATIVE A2 WAS TO DEPLOY ACTIVE TMS THAT WILL REDUCE CONGESTION DURING 2028 LOS ANGELES OLYMPIC GAMES. IN ADDITION TO WORK THAT ARE INCLUDED IN A1, ALTERNATIVE A2 ALSO PROPOSED TO INSTALL NEW EQUIPMENT SUCH AS CLOSED-CIRCUIT TELEVISION (CCTV) CAMERAS, OVERHEAD SIGN STRUCTURES (GANTRY), MAINTENANCE VEHICLE PULLOUTS (MVPS), CHANGEABLE MESSAGE SIGNS (CMS), TRAFFIC CENSUS STATIONS, AND DYNAMIC MESSAGE SIGNS (DMS). THE ALT 1 WAS THE PREFERRED ALTERNATIVE DUE TO FINAN
$13,956,000
PROJECT TITLE: CRABTREE ROAD OVER DRY CREEK (BRIDGE 38C0009) BRIDGE REPLACEMENT (TC) :::: PROJECT DESCRIPTION: CRABTREE ROAD OVER DRY CREEK (BRIDGE 38C0009) BRIDGE REPLACEMENT (TC)
$12,160,000
PROJECT TITLE: MOUNT VERNON AVENUE OVER THE UNION PACIFIC RAILROAD TRACKS, BR. NO. 54C-0101 REHABILITATE AND WIDEN BRIDGE :::: PROJECT DESCRIPTION: MOUNT VERNON AVENUE OVER THE UNION PACIFIC RAILROAD TRACKS, BR. NO. 54C-0101 REHABILITATE AND WIDEN BRIDGE
$10,508,308
PROJECT TITLE: BAKER BLVD. BRIDGE - OVER MOJAVE RIVER, 0.2 MI SW OF DEATH VALLEY RD REPLACE 2 LANE BRIDGE W 4 LANE BRIDGE (54C0127) :::: PROJECT DESCRIPTION: BAKER BLVD. BRIDGE - OVER MOJAVE RIVER, 0.2 MI SW OF DEATH VALLEY RD REPLACE 2 LANE BRIDGE W 4 LANE BRIDGE (54C0127)
$9,561,000
PROJECT TITLE: IN KERN CO NEAR WASCO, FROM 'E' STREET TO JUNCTION 46/99 FAMOSA PAVEMENT REHAB :::: PROJECT DESCRIPTION: ON STATE ROUTE: 46. IN KERN CO NEAR WASCO, FROM 'E' STREET TO JUNCTION 46/99 FAMOSA PAVEMENT REHAB
$8,130,600
PROJECT TITLE: UNION PACIFIC RAILROAD PROPERTY BETWEEN BERRY STREET AND BREA CANYON FLOOD CHANNEL (CURRENT TRACKS AT BREA TERMINUS). CONSTRUCTION OF CLASS I PEDESTR :::: PROJECT DESCRIPTION: UNION PACIFIC RAILROAD PROPERTY BETWEEN BERRY STREET AND BREA CANYON FLOOD CHANNEL (CURRENT TRACKS AT BREA TERMINUS). CONSTRUCTION OF CLASS I PEDESTRIAN AND BIKE PATH
$5,811,000
PROJECT TITLE: THE 21-SCHOOL PROJECT IN THE CITY'S CORE IS BOUNDED BY OXFORD AVENUE (WEST), BEVERLY BOULEVARD (NORTH), LAFAYETTE PARK PLACE (EAST), AND 4TH AND 7TH :::: PROJECT DESCRIPTION: THE 21-SCHOOL PROJECT IN THE CITY'S CORE IS BOUNDED BY OXFORD AVENUE (WEST), BEVERLY BOULEVARD (NORTH), LAFAYETTE PARK PLACE (EAST), AND 4TH AND 7TH STREET (SOUTH). CREATES 5.9 MILES OF LOW-STRESS STREETS WITH PEDESTRIAN/BICYCLE IMPROVEMENTS IN THE CITY'S 'HEART' CONNECTING DAC STUDENTS/RESIDENTS WITH SCHOOLS, TRANSIT AND LOCAL DESTINATIONS THROUGH THE IMPLEMENTATION OF SAFETY IMPROVEMENTS. BICYCLE INFRASTRUCTURE, AND SPEED REDUCTION MEASURES.
$5,494,000
PROJECT TITLE: IN THE CITY OF LOS ANGELES, THIS IS A TRAFFIC MANAGEMENT SYSTEM (TMS) PROJECT, LOCATED MAINLY ON LA-405 BETWEEN JEFFERSON BLVD (PM R25.9) & ROSCOE BL :::: PROJECT DESCRIPTION: ON STATE ROUTE: 405. IN THE CITY OF LOS ANGELES, THIS IS A TRAFFIC MANAGEMENT SYSTEM (TMS) PROJECT, LOCATED MAINLY ON LA-405 BETWEEN JEFFERSON BLVD (PM R25.9) & ROSCOE BLVD (PM 43.75). TRAFFIC W/IN THE PROJECT LIMITS EXPERIENCE BOTH RECURRENT & NON-RECURRENT CONGESTION, HOWEVER, THE FACILITY DOES NOT HAVE ADEQUATE TMS INFRASTRUCTURE TO ALLOW THE DISTRICT'S TRAFFIC MANAGEMENT CENTER (TMC) TO MONITOR & MANAGE THE TRAFFIC FLOW. THERE IS CURRENTLY LITTLE OR NO CLOSED-CIRCUIT TELEVISION (CCTV) COVERAGE W/IN THE PROJECT LIMITS. MOST OF THE EXISTING EQUIPMENT HAS EITHER COMMUNICATION OR WIRELESS COMMUNICATION THAT HAS INTERMITTENT ISSUES. UPGRADING EXISTING TMS FIELD ELEMENTS & INSTALLATION OF ADDITIONAL TMS INFRASTRUCTURE & FIBER OPTIC CABLES WILL PROVIDE MORE ACCURATE REAL-TIME TRAVELER INFORMATION, TRAVEL RELIABILITY CAN BE IMPROVED, IMPACTS OF THE CONGESTION CAN BE REDUCED, THE DURATION & EFFECTS OF NON-RECURRENT CONGESTION CAN BE MINIMIZED, & THE OVERALL EFFICIENCY & OPERATIONS OF THE ROUTE CAN BE MAXIMIZED. THE SCOPE OF WORK INCLUDED TWO BUILD ALTERNATIVES (A1 & A2). ALTERNATIVE A1 WILL REHABILITATE EXISTING TRANSPORTATION MANAGEMENT SYSTEM (TMS) & IT PROPOSES TO UPGRADE: TRAFFIC CENSUS STATIONS, TMS, RAMP METERING SYSTEMS (RMS), AND FIBER OPTIC COMMUNICATION SYSTEM. THERE WILL ALSO BE COMMUNICATION SYSTEM UPGRADE AT LOS ANGELES REGIONAL TRANSPORTATION MANAGEMENT CENTER (LARTMC) ON ROUTE 2 (PM R18.7), LOS ANGELES AIRPORT (LAX) HUB ON ROUTE 105 (PM R2.0), AND N. HOLLYWOOD HUB (NHD) ON ROUTE 101 (PM 11.8R). ALTERNATIVE A2 WAS TO DEPLOY ACTIVE TMS THAT WILL REDUCE CONGESTION DURING 2028 LOS ANGELES OLYMPIC GAMES. IN ADDITION TO WORK THAT ARE INCLUDED IN A1, ALTERNATIVE A2 ALSO PROPOSED TO INSTALL NEW EQUIPMENT SUCH AS CLOSED-CIRCUIT TELEVISION (CCTV) CAMERAS, OVERHEAD SIGN STRUCTURES (GANTRY), MAINTENANCE VEHICLE PULLOUTS (MVPS), CHANGEABLE MESSAGE SIGNS (CMS), TRAFFIC CENSUS STATIONS, AND DYNAMIC MESSAGE SIGNS (DMS). THE ALT 1 WAS THE PREFERRED ALTERNATIVE DUE TO FINAN
$5,013,400
PROJECT TITLE: SR99/SERVICE RD/MITCHELL RD INTERCHANGE, ON SR99 IN CITY OF CERES, 0.7 MILES SOUTH OF MITCHELL ROAD PROJECT WILL CONSTRUCT A FULL INTERCHANGE IN A DI :::: PROJECT DESCRIPTION: SR99/SERVICE RD/MITCHELL RD INTERCHANGE, ON SR99 IN CITY OF CERES, 0.7 MILES SOUTH OF MITCHELL ROAD PROJECT WILL CONSTRUCT A FULL INTERCHANGE IN A DIVERGING DIAMOND CONFIGURATION AT SERVICE ROAD AND A PARTIAL INTECHANGE WITH RAMPS CONNECTING MITCHELL ROAD AND SR99 TO THE SOUTH. LOCAL STREET IMPROVEMENT INCLUDE REALIGNMENT, REMOVAL AND CONSTRUCTION OF NEW ACCESS ROADS
$5,000,000
PROJECT TITLE: EAST OTAY MESA PORT OF ENTRY FROM THE BORDER WITH MEXICO TO THE FUTURE EXTENSION OF STATE ROUTE 11, SEGMENT 3 CONSTRUCT PORT OF ENTRY (TC) :::: PROJECT DESCRIPTION: EAST OTAY MESA PORT OF ENTRY FROM THE BORDER WITH MEXICO TO THE FUTURE EXTENSION OF STATE ROUTE 11, SEGMENT 3 CONSTRUCT PORT OF ENTRY (TC)
$5,000,000
PROJECT TITLE: CALDWELL AVE (SANTA FE ST TO LOVERS LANE), AKERS ST (WALNUT AVE TO GOSHEN AVE), PLAZA DRIVE (CROWLEY AVE TO RIGGIN AVE), DEMAREE ST (MILLCREEK DR TO :::: PROJECT DESCRIPTION: CALDWELL AVE (SANTA FE ST TO LOVERS LANE), AKERS ST (WALNUT AVE TO GOSHEN AVE), PLAZA DRIVE (CROWLEY AVE TO RIGGIN AVE), DEMAREE ST (MILLCREEK DR TO RIGGIN AVE), AND RIGGIN AVE (AKERS ST TO GIDDINGS ST) IN THE CITY OF VISALIA, AT VARIOUS LOCATIONS; INSTALLATION OF FIBER OPTIC CABLE AND COMMUNICATION EQUIPMENT TO ENHANCE INTERCONNECTIVITY BETWEEN SIGNALIZED INTERSECTIONS ACROSS MULTIPLE CORRIDORS IN THE CITY OF VISALIA. WORK INCLUDES UTILIZING EXISTING CONDUITS AND INSTALLING NEW CONDUIT WHERE NECESSARY ALONG THESE CORRIDORS.
$4,430,000
PROJECT TITLE: IN SAN LUIS OBISPO COUNTY, 0.8 MILE SOUTH OF RAGGED POINT EMERGENCY OPENING - REPAIR AND CLEAR LANDSLIDE AND RESTORE ROADWAY FACILITY :::: PROJECT DESCRIPTION: ON STATE ROUTE: 1. IN SAN LUIS OBISPO COUNTY, 0.8 MILE SOUTH OF RAGGED POINT EMERGENCY OPENING - REPAIR AND CLEAR LANDSLIDE AND RESTORE ROADWAY FACILITY
$4,253,900
PROJECT TITLE: LOS ANGELES COUNTY NEAR CARSON AND LONG BEACH AT VARIOUS LOCATIONS FROM 0.1 MILE NORTH OF ROUTE 710 TO ROUTE 110/405 SEPARATION. THE PROJECT SCOPE IS :::: PROJECT DESCRIPTION: ON STATE ROUTE: 405. LOS ANGELES COUNTY NEAR CARSON AND LONG BEACH AT VARIOUS LOCATIONS FROM 0.1 MILE NORTH OF ROUTE 710 TO ROUTE 110/405 SEPARATION. THE PROJECT SCOPE IS FOR ROADSIDE SAFETY IMPROVEMENTS THE PROPOSED IMPROVEMENT CONSISTS OF (I) MAINTENANCE VEHICLE PULLOUT AT 6 LOCATIONS, (II) PAVING AREAS BEYOND GORE 1AT 16 LOCATIONS, (III) PATTERNED CONCRETE SLOPE PAVEMENT AT 2 LOCATIONS, (IV) MAINTENANCE ACCESS ROAD AT 1 LOCATION, (V) SMART CRASH CUSHION ATTENUATOR AT 1 LOCATION, (VI) SIGN POST SLEEVES AT 7 LOCATIONS, (VII) MINOR CONCRETE AT 1 LOCATION, AND (VIII) VEGETATION CONTROL AT 1 LOCATION.
$3,483,918
PROJECT TITLE: SANTA BARBARA COUNTY, NEAR SANTA MARIA, FROM 0.2 MILE NORTH OF ROUTE 135 JUNCTION TO ROUTE 166 JUNCTION. WIDEN SHOULDERS, CONSTRUCT RUMBLE STRIPE, UP :::: PROJECT DESCRIPTION: SANTA BARBARA COUNTY, NEAR SANTA MARIA, FROM 0.2 MILE NORTH OF ROUTE 135 JUNCTION TO ROUTE 166 JUNCTION. WIDEN SHOULDERS, CONSTRUCT RUMBLE STRIPE, UPGRADE GUARDRAIL AND RELOCATE OBJECTS OUTSIDE OF CLEAR RECOVERY ZONE.
$3,373,170
PROJECT TITLE: IN MADERA COUNTY IN AND NEAR MADERA FROM 0.1 MILE SOUTH OF AVENUE 13 TO 0.1 MILE SOUTH OF EAST MADERA UNDERPASS REHABILITATE PAVEMENT, INSTALL TRANSP :::: PROJECT DESCRIPTION: ON STATE ROUTE: 145. IN MADERA COUNTY IN AND NEAR MADERA FROM 0.1 MILE SOUTH OF AVENUE 13 TO 0.1 MILE SOUTH OF EAST MADERA UNDERPASS REHABILITATE PAVEMENT, INSTALL TRANSPORTATION MANAGEMENT SYSTEM (TMS) ELEMENTS, CONSTRUCT RUMBLE STRIPS, REPLACE SIGNS, REHABILITATE DRAINAGE SYSTEMS, INSTALL STREET LIGHTING, CONSTRUCT CURB.
$3,271,237
PROJECT TITLE: CITY OF STOCKTON, SWAIN ROAD AND MORGAN PLACE ROUNDABOUT CONSTRUCT A ROUNDABOUT AT THE INTERSECTION OF SWAIN ROAD AND MORGAN PLACE. PROJECT ALSO INCL :::: PROJECT DESCRIPTION: CITY OF STOCKTON, SWAIN ROAD AND MORGAN PLACE ROUNDABOUT CONSTRUCT A ROUNDABOUT AT THE INTERSECTION OF SWAIN ROAD AND MORGAN PLACE. PROJECT ALSO INCLUDES UPGRADING MIDBLOCK RAMPS TO AMERICAN DISABILITIES ACT STANDARDS, INSTALLING INTERCONNECTED POINT-TILT-ZOOM CAMERA, RECTANGULAR RAPID BEACONS, SIGNING, STRIPING, AND RELOCATING STREET LIGHTS.
$3,092,000
PROJECT TITLE: ALONG THE UNION PACIFIC RAILROAD RIGHT OF WAY THROUGH THE CITY OF LA HABRA CLASS I BIKEWAY :::: PROJECT DESCRIPTION: ALONG THE UNION PACIFIC RAILROAD RIGHT OF WAY THROUGH THE CITY OF LA HABRA CLASS I BIKEWAY
$3,000,000
PROJECT TITLE: ON CALIFORNIA CITY BLVD. FROM BARON BLVD. TO MAVERICK ST., IN THE CITY OF CALIFORNIA CITY. SHOULDER PAVING :::: PROJECT DESCRIPTION: ON CALIFORNIA CITY BLVD. FROM BARON BLVD. TO MAVERICK ST., IN THE CITY OF CALIFORNIA CITY. SHOULDER PAVING
$2,741,242
PROJECT TITLE: I-215 UNDERCROSSING AT KELLER ROAD, BR. NOS. 56 0652 L&R NEW INTERCHANGE AND REALIGNMENT OF FRONTAGE ROADS :::: PROJECT DESCRIPTION: I-215 UNDERCROSSING AT KELLER ROAD, BR. NOS. 56 0652 L&R NEW INTERCHANGE AND REALIGNMENT OF FRONTAGE ROADS
$2,600,000
PROJECT TITLE: IN THE CITY OF VENTURA, FROM SOUTH OF SEAWARD AVENUE TO VENTURA RIVER. STABALIZE SOIL AND EROSION CONTROL SLOPES AND BARE AREAS WILL BE PLANTED WITH :::: PROJECT DESCRIPTION: ON STATE ROUTE: 101. IN THE CITY OF VENTURA, FROM SOUTH OF SEAWARD AVENUE TO VENTURA RIVER. STABALIZE SOIL AND EROSION CONTROL SLOPES AND BARE AREAS WILL BE PLANTED WITH TREES, SHRUBS, AND GROUNDCOVERS. TREES AND SHRUBS IMPROVE SOIL WATER HOLDING CAPACITY AND PROMOTE STORMWATER INFILTRATION, THUS REDUCING POLLUTANTS AT THE SOURCE. GROUNDCOVERS AID IN SOIL STABILIZATION WHERE FIBROUS ROOTS HOLD THE SOIL SURFACE IN PLACE. THE IMPROVEMENTS WOULD PROVIDE SOURCE CONTROL SOLUTIONS MINIMIZING SEDIMENTS FROM CALTRANS RIGHT-OF-WAY ULTIMATELY DISCHARGING TO THE RECEIVING WATER BODIES.
$2,585,514
PROJECT TITLE: MARKET STREET OVER THE SANTA ANA RIVER IN JURUPA VALLEY, BR. NO. 56C-0024 BRIDGE REPLACEMENT TO FOUR LANES :::: PROJECT DESCRIPTION: MARKET STREET OVER THE SANTA ANA RIVER IN JURUPA VALLEY, BR. NO. 56C-0024 BRIDGE REPLACEMENT TO FOUR LANES
$2,585,076
PROJECT TITLE: IN LOS ANGELES, WILDLIFE CROSSING AT LIBERTY CANYON AT OR IN THE VICINITY OF LIBERTY (07-LA-101-32.8/33.8) THE INSTALLATION OF 12-FOOT AND 14-FOOT HI :::: PROJECT DESCRIPTION: IN LOS ANGELES, WILDLIFE CROSSING AT LIBERTY CANYON AT OR IN THE VICINITY OF LIBERTY (07-LA-101-32.8/33.8) THE INSTALLATION OF 12-FOOT AND 14-FOOT HIGH WILDLIFE HABITAT FENCING ALONG ROUTE 101 IN THE STATE'S RIGHT OF WAY
$2,500,000
PROJECT TITLE: IN DEL NORTE COUNTY ABOUT 10.0 MILES SOUTH OF CRESCENT CITY FROM 3.0 MILES NORTH TO 3.6MILES NORTH OF WILSON CREEK BRIDGE IMPROVE CROSS SLOPE, WIDEN :::: PROJECT DESCRIPTION: ON STATE ROUTE: 101. IN DEL NORTE COUNTY ABOUT 10.0 MILES SOUTH OF CRESCENT CITY FROM 3.0 MILES NORTH TO 3.6MILES NORTH OF WILSON CREEK BRIDGE IMPROVE CROSS SLOPE, WIDEN TRAVELED LANE AND SHOULDERS, INSTALL GUARDRAIL, AND IMPROVE DRAINAGE.
$2,399,326
PROJECT TITLE: ASHLAN AVENUE FROM CORNELIA TO BLACKSTONE AVENUES INSTALLATION OF WIRELESS COMMUNICATIONS, 2070L INTELLIGENT TRAFFIC SIGNAL CONTROLLERS, VEHICLE DETE :::: PROJECT DESCRIPTION: ASHLAN AVENUE FROM CORNELIA TO BLACKSTONE AVENUES INSTALLATION OF WIRELESS COMMUNICATIONS, 2070L INTELLIGENT TRAFFIC SIGNAL CONTROLLERS, VEHICLE DETECTION, ACCESSIBLE PEDESTRIAN PUSH BUTTONS, CAMERAS, VAULTS AND CABINETS. (TC)
$2,373,470
PROJECT TITLE: PEBBLY BEACH ROAD BETWEEN CRESCENT AVE. AND PEBBLY BEACH VILLAGE RD THIS PROJECT INVOLVES THE SHORELINE STABILIZATION OF A 0.75 MILE STRETCH OF PEBBL :::: PROJECT DESCRIPTION: PEBBLY BEACH ROAD BETWEEN CRESCENT AVE. AND PEBBLY BEACH VILLAGE RD THIS PROJECT INVOLVES THE SHORELINE STABILIZATION OF A 0.75 MILE STRETCH OF PEBBLY BEACH ROAD (A MAJOR COLLECTOR) BY REPAIRING 43 VOIDS CAUSED BY STORM SURGE AND WAVE EROSION LOCATED ALONG THE ROADWAY REVETMENT. THE SCOPE OF THIS WORK IS LIMITED TO REPAIRING THE ROAD SUBGRADE AND RESTORING THE SURFACE, INCLUDING REHABILITATION OF THE PEDESTRIAN RIGHT OF WAY. DEMO ID# CA980.
$2,000,000
PROJECT TITLE: AUTO CENTER DRIVE IN LAKE ELSINORE, CA - 0.2 MI N/W RAILROAD CANYON ROAD SEISMIC RETROFIT OF THE AUTO CENTER DRIVE BRIDGE STRUCTURE, WIDENING OF THE :::: PROJECT DESCRIPTION: AUTO CENTER DRIVE IN LAKE ELSINORE, CA - 0.2 MI N/W RAILROAD CANYON ROAD SEISMIC RETROFIT OF THE AUTO CENTER DRIVE BRIDGE STRUCTURE, WIDENING OF THE NORTH SIDE OF THE BRIDGE TO ADD A SIDEWALK, BARRIER UPGRADES, STREETLIGHTS, AND FOUNDATION RETROFIT FOR SCOUT PROTECTION.
$2,000,000
PROJECT TITLE: ONTARIO AVENUE BETWEEN COMPTON STREET AND STATE STREET WIDEN ONTARIO AVENUE AT THE UNDERPASS OF I-15 TO INCLUDE ADDITIONAL THROUGH LANES AND TURN LAN :::: PROJECT DESCRIPTION: ONTARIO AVENUE BETWEEN COMPTON STREET AND STATE STREET WIDEN ONTARIO AVENUE AT THE UNDERPASS OF I-15 TO INCLUDE ADDITIONAL THROUGH LANES AND TURN LANES BETWEEN COMPTON AVENUE AND STATE STREET. IMPROVEMENTS INCLUDE, CONSTRUCTION OF TIE BACK WALLS, INSTALLATION OF SIDEWALKS, CURB RAMPS, BIKE LANES, AND A NEW TRAFFIC SIGNAL ON STATE STREET.
$2,000,000
PROJECT TITLE: VARIOUS LOCATIONS THROUGHOUT RIVERSIDE COUNTY, PM00076 BRIDGE PREVENTIVE MAINTENANCE PROGRAM :::: PROJECT DESCRIPTION: VARIOUS LOCATIONS THROUGHOUT RIVERSIDE COUNTY, PM00076 BRIDGE PREVENTIVE MAINTENANCE PROGRAM
$1,972,690
PROJECT TITLE: MCKINLEY AND BLYTHE AVENUES INTERSECTION; AND MCKINELY AVENUE (NORTHSIDE) FROM CECELIA AVE TO 400 FT EAST OF BLYTHE AVENUE INSTALL TRAFFIC SIGNALS, B :::: PROJECT DESCRIPTION: MCKINLEY AND BLYTHE AVENUES INTERSECTION; AND MCKINELY AVENUE (NORTHSIDE) FROM CECELIA AVE TO 400 FT EAST OF BLYTHE AVENUE INSTALL TRAFFIC SIGNALS, BIKE LANE, STREETLIGHTS, STORM DRAIN, SIGNING AND STRIPING, LEFT TURN POCKET, CONCRETE SIDEWALKS, CURB, GUTTER AND CURB RAMPS.
$1,909,345
IN THE CITY OF PLACERVILLE ALONG PLACERVILLE DR FROM WEST OF THE US 50 UNDERCROSSING TO GREEN VALLEY ROAD: PLACERVILLE DR TO MALLARD LANE. PEDESTRIAN
$1,510,000
PROJECT TITLE: DEL NORTE COUNTY NEAR SMITH RIVER FROM EAST DENNEY STREET TO ROWDY CREEKBRIDGE CONSTRUCT LEFT TURN LANE AT TIMBERS BOULEVARD, INSTALL LIGHTING AND WI :::: PROJECT DESCRIPTION: ON STATE ROUTE: 101. DEL NORTE COUNTY NEAR SMITH RIVER FROM EAST DENNEY STREET TO ROWDY CREEKBRIDGE CONSTRUCT LEFT TURN LANE AT TIMBERS BOULEVARD, INSTALL LIGHTING AND WIDEN SHOULDERS.
$1,493,191
PROJECT TITLE: CITY OF BANNING, IN RIVERSIDE COUNTY, AT SAN GORGONIO AVE AND THE UNION PACIFIC RAILROAD GRADE CROSSING. GRADE CROSSING HAZARDS ELIMINATION AND SAFET :::: PROJECT DESCRIPTION: CITY OF BANNING, IN RIVERSIDE COUNTY, AT SAN GORGONIO AVE AND THE UNION PACIFIC RAILROAD GRADE CROSSING. GRADE CROSSING HAZARDS ELIMINATION AND SAFETY IMPROVEMENTS TO BE FUNDED UNDER THE RAILROAD-HIGHWAY GRADE CROSSING SECTION 130 PROGRAM (RHGCP), WITH FEDERAL MATCH PROVIDED THROUGH CA TOLL CREDITS TC
$1,421,757
PROJECT TITLE: IN HUMBOLDT COUNTY NEAR FERNDALE FROM NORTH WADDINGTON EXIT TO FERNBRIDGE DRIVE. BRIDGE SCOUR REPAIR :::: PROJECT DESCRIPTION: ON STATE ROUTE: 211. IN HUMBOLDT COUNTY NEAR FERNDALE FROM NORTH WADDINGTON EXIT TO FERNBRIDGE DRIVE. BRIDGE SCOUR REPAIR
$1,361,631
PROJECT TITLE: IN HUMBOLDT COUNTY, NEAR BRIDGEVILLE, FROM 1.1 MILES TO 1.4 MILES EAST OF BRIDGEVILLE MAINTENANCE STATION ALSO AT 0.2 MILE EAST OF DEERFIELD RANCH RO :::: PROJECT DESCRIPTION: IN HUMBOLDT COUNTY, NEAR BRIDGEVILLE, FROM 1.1 MILES TO 1.4 MILES EAST OF BRIDGEVILLE MAINTENANCE STATION ALSO AT 0.2 MILE EAST OF DEERFIELD RANCH ROAD (PM 29.42). REALIGN ROADWAY, INSTALL ROCK SLOPE PROTECTION (RSP) TO STABILIZE EMBANKMENT, AND REPAIR PAVEMENT.
$1,260,600
PROJECT TITLE: BAKERSFIELD: ON ASHE ROAD BETWEEN MING AVENUE AND STOCKDALE HIGHWAY, AND ON WIBLE ROAD BETWEEN MCKEE ROAD AND HOSKING AVENUE. INSTALL RAISED MEDIAN I :::: PROJECT DESCRIPTION: BAKERSFIELD: ON ASHE ROAD BETWEEN MING AVENUE AND STOCKDALE HIGHWAY, AND ON WIBLE ROAD BETWEEN MCKEE ROAD AND HOSKING AVENUE. INSTALL RAISED MEDIAN ISLANDS ON ASHE ROAD BETWEEN MING AVENUE AND STOCKDALE HIGHWAY, AND ON WIBLE ROAD BETWEEN MCKEE ROAD AND HOSKING AVENUE. THE WORK CONSISTS OF, IN GENERAL, CONSTRUCTING TYPE 'M' MEDIAN CURB, INSTALLATION OF TRAFFIC STRIPING, PAVEMENT MARKINGS AND ROAD SIGNS.
$1,257,480
PROJECT TITLE: NORTH BOUND STATE ROUTE FROM THE SR58/SR99 INTERCHANGE TO CALIFORNIA AVE CONSTRUCT NORTHBOUND AUXILIARY LANE :::: PROJECT DESCRIPTION: NORTH BOUND STATE ROUTE FROM THE SR58/SR99 INTERCHANGE TO CALIFORNIA AVE CONSTRUCT NORTHBOUND AUXILIARY LANE
$1,195,141
PROJECT TITLE: IN HUMBOLDT COUNTY FROM 6.0 MILES EAST OF WILLOW CREEK TO 0/9 MILES WEST OF TISH TANG CAMPGROUND TRAFFIC CONTROL, GEOTECH INVESTIGATION, SLOPE REPAIR :::: PROJECT DESCRIPTION: ON STATE ROUTE: 96. IN HUMBOLDT COUNTY FROM 6.0 MILES EAST OF WILLOW CREEK TO 0/9 MILES WEST OF TISH TANG CAMPGROUND TRAFFIC CONTROL, GEOTECH INVESTIGATION, SLOPE REPAIR AND STABILIZATION, DRAINAGE REPAIR AND IMPROVEMENTS, EROSION CONTROL AS NECESSARY
$1,165,861
PROJECT TITLE: AIRPORT BOULEVARD OVER WHITEWATER RIVER, BR. NO. 56C-0020 REPLACE EXISTING 2-LANE BRIDGE :::: PROJECT DESCRIPTION: AIRPORT BOULEVARD OVER WHITEWATER RIVER, BR. NO. 56C-0020 REPLACE EXISTING 2-LANE BRIDGE
$1,150,890
PROJECT TITLE: IN KERN COUNTY NEAR PUMPKIN CENTER FROM ASHE ROAD TO MIDPOINT ROUTE 119/99 SEPARATION BRIDGE. ROADWAY REHABILITATION (3R) :::: PROJECT DESCRIPTION: IN KERN COUNTY NEAR PUMPKIN CENTER FROM ASHE ROAD TO MIDPOINT ROUTE 119/99 SEPARATION BRIDGE. ROADWAY REHABILITATION (3R)
$1,082,765
PROJECT TITLE: VARIOUS LOCATIONS THROUGHOUT THE CITY OF PALMDALE CONDUCT A CITY-WIDE SIGNAL MODERNIZATION AND PEDESTRIAN INFRASTRUCTURE REPLACEMENT. REPLACE SIGNAL :::: PROJECT DESCRIPTION: VARIOUS LOCATIONS THROUGHOUT THE CITY OF PALMDALE CONDUCT A CITY-WIDE SIGNAL MODERNIZATION AND PEDESTRIAN INFRASTRUCTURE REPLACEMENT. REPLACE SIGNAL HEAD DISPLAYS WITH CURRENT STANDARDS AND REPLACE PEDESTRIAN CROSSWALKS AND PEDESTRIAN BUTTONS AT CROSSWALKS.
$1,047,773