OREGON DEPARTMENT OF TRANSPORTATION
Total received in grants · trailing 12 months
$95M
$1for every U.S. household÷ 131M U.S. households
In perspective
0.1%of all $162.9B in tracked grants
16separate grants, trailing 12 months
OREGON DEPARTMENT OF TRANSPORTATION has received $95M across 16 federal grants of $1M or more on record.
Data as of July 24, 2026. Source: USAspending.gov, prime contract awards $1M+. Federal spending data lags and has known gaps. This is not a real-time or complete record.
Grants by agency
Where this recipient’s grant dollars come from.
All grant awards
Swipe to see description and amount →
| Agency | Description | Amount |
|---|---|---|
| Department of Transportation | PROJECT TITLE: MORRISON STREET: WILLAMETTE RIVER (MORRISON) BR :::: PROJECT DESCRIPTION: LEAD-BASED PAINT REMOVAL & NEW PROTECTIVE PAINT, BEARING CLEAN UP, ADD A MAINTENCE ACCESS CATWALK FOR THE FIXED RIVER SPANS | $20,134,691 |
| Department of Transportation | PROJECT TITLE: DISTRICT 7 ER - DEC 2022 EVENT :::: PROJECT DESCRIPTION: WORKED PERFORMED BY DIST 7 DURING AND AFTER THE DECEMBER 2022 EVENT. | $18,941,113 |
| Department of Transportation | PROJECT TITLE: US30BY CURB RAMPS, PHASE 2 :::: PROJECT DESCRIPTION: CONSTRUCT CURB RAMPS TO MEET COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT (ADA) STANDARDS. | $9,482,155 |
| Department of Transportation | PROJECT TITLE: I-84 (WESTBOUND): UNION PACIFIC RAILROAD BRIDGE (HOOD RIVER) :::: PROJECT DESCRIPTION: STUDY TO DETERMINE IF THE BRIDGE DRIVING SURFACE NEEDS REPAIR OR IF THE ENTIRE STRUCTURE SHOULD BE REPLACED DUE TO THE NEED FOR CONTINUOUS REPAIR TO THIS STRUCTURE AND DRIVING SURFACE. THIS STUDY WILL INVESTIGATE THE MOST APPROPRIATE AND COST EFFECTIVE METHOD TO EITHER RESTORE OR REPLACE THIS BRIDGE. | $9,310,120 |
| Department of Transportation | PROJECT TITLE: DOUGLAS AVENUE: DEER CREEK BRIDGE (ROSEBURG) :::: PROJECT DESCRIPTION: REPLACE THE BRIDGE DUE TO DETERIORATION. PART OF THE BRIDGE WORK ALSO INCLUDES PAVEMENT WIDENING, PAVING, AND SIDEWALKS ON THE NE AND SW CORNERS OF DOUGLAS AVENUE. | $8,375,877 |
| Department of Transportation | PROJECT TITLE: OR82/OR351/OR350 CURB RAMPS (JOSEPH) :::: PROJECT DESCRIPTION: CONSTRUCT CURB RAMPS TO MEET COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT (ADA) STANDARDS. CONSTRUCT SIDEWALK TO FILL THE GAP IN PEDESTRIAN FACILITIES BETWEEN DOWNTOWN JOSEPH AND THE EXISTING MULTI-USE PATH THAT LEADS TO WALLOWA LAKE. | $5,900,619 |
| Department of Transportation | PROJECT TITLE: OR551 @ EHLEN ROAD :::: PROJECT DESCRIPTION: CONSTRUCT LEFT TURN LANES IN EACH DIRECTION ON EHLEN ROAD APPROACHING OR 551; RESTRICTION OF MOVEMENTS AT BOONES FERRY ROAD TO AND FROM EHLEN ROAD TO RIGHT TURN ONLY WITH THE INSTALLATION OF CONCRETE TRAFFIC SEPARATOR; AND CONSTRUCT A NEW LOCAL COUNTY ROAD CONNECTION BETWEEN OR 551 AND BOONES FERRY ROAD SOUTH OF THE WESTERN WAGON VILLAGE MOBILE HOME PARK. | $4,393,273 |
| Department of Transportation | PROJECT TITLE: I-5/OR99/OR238/US199/OR62/OR140 CURB RAMPS :::: PROJECT DESCRIPTION: CONSTRUCT CURB RAMPS TO MEET COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT (ADA) STANDARDS. | $4,281,318 |
| Department of Transportation | PROJECT TITLE: US101: PACIFIC AVE (GEARHART) :::: PROJECT DESCRIPTION: DESIGN TO REPLACE FAILING SIGNAL FOR DRIVER SAFETY. | $2,715,970 |
| Department of Transportation | PROJECT TITLE: STATEWIDE PROTECT PROGRAM ADVANCED INVESTIGATION 2024 :::: PROJECT DESCRIPTION: FUNDING FOR COLLECTING DETAILED DATA AND CONDUCTING INVESTIGATIONS, STUDIES, TESTING, AND DETAILED WORK ANALYSIS ABOVE AND BEYOND THE OREGON DEPARTMENT OF TRANSPORTATION'S STANDARD PROCESSES, TO BE CONDUCTED IN THE EARLY STAGES OF PROJECT DEVELOPMENT. | $2,541,851 |
| Department of Transportation | PROJECT TITLE: US101: CULVERTS (MP 73.46 - 136.29) :::: PROJECT DESCRIPTION: REHABILITATE AND REPLACE CULVERTS THAT WERE DEEMED TO BE IN POOR OR CRITICAL CONDITION BETWEEN MP 73.46 AND 136.29 TO ENSURE THEY ARE FUNCTIONING PROPERLY. | $1,942,120 |
| Department of Transportation | PROJECT TITLE: DISTRICT 3 ER - SEPT 2020 FIRES :::: PROJECT DESCRIPTION: FOR WORK PERFORMED BY DIST 3 DURING THE SEPT FIRES | $1,648,643 |
| Department of Transportation | PROJECT TITLE: OR99E @ AIRPORT RD (ALBANY) :::: PROJECT DESCRIPTION: INSTALL A LEFT TURN LANE ON THE NB AIRPORT ROAD APPROACH AT THE SIGNALIZED INTERSECTION; INSTALL THE DILEMMA ZONE PROTECTION SIGNAL TIMING FEATURE; MODIFY LEFT TURN SIGNAL HEADS TO 'FLASHING YELLOW ARROW' ON AIRPORT RD APPROACHES. | $1,444,258 |
| Department of Transportation | PROJECT TITLE: TUALATIN RIVER/SOUTH RD BRIDGE (WASHINGTON CO) :::: PROJECT DESCRIPTION: REPLACE THE BRIDGE WITH ONE THAT MEETS CURRENT STANDARDS. | $1,349,164 |
| Department of Transportation | PROJECT TITLE: CURVE WARNING UPGRADES (NW OREGON) :::: PROJECT DESCRIPTION: INSTALL CHEVRONS AND UPDATED CURVE WARNING SIGNS AT VARIOUS LOCATIONS THROUGHOUT NORTHWEST OREGON (SOUTHERN PORTION) TO IMPROVE DRIVER AWARENESS AND SAFETY. | $1,281,633 |
| Department of Transportation | PROJECT TITLE: ALL ROADS TRANSPORTATION SAFETY (WASCO COUNTY) :::: PROJECT DESCRIPTION: CURVE SIGNS, PAVEMENT MARKERS, AND STRIPING TO INCREASE SAFETY AND REDUCE COLLISIONS IN THE AREA. | $1,214,307 |