STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

Total received in grants · trailing 12 months
$322M
vs. GOVERNOR'S AUTHORIZED REPRESENTATIVE ($39.0B), largest tracked grant recipient
$2for every U.S. household÷ 131M U.S. households
In perspective
0.2%of all $162.9B in tracked grants
60separate grants, trailing 12 months

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION has received $322M across 60 federal grants of $1M or more on record.

Data as of July 24, 2026. Source: USAspending.gov, prime contract awards $1M+. Federal spending data lags and has known gaps. This is not a real-time or complete record.

Grants by agency

Where this recipient’s grant dollars come from.

All grant awards

Swipe to see description and amount →

AgencyDescriptionAmount
PROJECT TITLE: I-4 AT SR 557 ;INTERCHANGE IMPROVEMENT;ENVIRONMENTAL;DB :::: PROJECT DESCRIPTION: I-4 AT SR 557 ;INTERCHANGE IMPROVEMENT;ENVIRONMENTAL;DB
$52,678,973
PROJECT TITLE: I-75 (SR 93) AT US 301 INTERCHANGE ;INTERCHANGE - ADD LANES;CONSTRUCTION;DB :::: PROJECT DESCRIPTION: I-75 (SR 93) AT US 301 INTERCHANGE ;INTERCHANGE - ADD LANES;CONSTRUCTION;DB
$36,112,598
PROJECT TITLE: I-4 AT SR 557 ;INTERCHANGE IMPROVEMENT;ENVIRONMENTAL;DB :::: PROJECT DESCRIPTION: I-4 AT SR 557 ;INTERCHANGE IMPROVEMENT;ENVIRONMENTAL;DB
$23,623,501
PROJECT TITLE: SFRTA OPERATING ASSISTANCE DURING I-95 CONSTRUCTION - FHWA;RAIL REVENUE/OPERATIONS - IMPROVEMENTS :::: PROJECT DESCRIPTION: SFRTA OPERATING ASSISTANCE DURING I-95 CONSTRUCTION - FHWA;RAIL REVENUE/OPERATIONS - IMPROVEMENTS
$16,000,000
PROJECT TITLE: ST JOHNS HERITAGE PKWY/ELLIS RD FROM JOHN RHODES BLVD TO W OF WICKHAM; PRELIMINARY ENGINEERING; RIGHT OF WAY :::: PROJECT DESCRIPTION: ST JOHNS HERITAGE PKWY/ELLIS RD FROM JOHN RHODES BLVD TO W OF WICKHAM; PRELIMINARY ENGINEERING; RIGHT OF WAY
$14,787,661
PROJECT TITLE: SR 683 (US 301) FROM S OF 25TH CT E TO S OF 13TH AVE E;RESURFACING;CONSTRUCTION :::: PROJECT DESCRIPTION: SR 683 (US 301) FROM S OF 25TH CT E TO S OF 13TH AVE E;RESURFACING;CONSTRUCTION
$10,937,942
PROJECT TITLE: I-75(SR93) FROM COLUMBIA COUNTY LINE TO HAMILTON COUNTY LINE;RESURFACING;CONSTRUCTION :::: PROJECT DESCRIPTION: I-75(SR93) FROM COLUMBIA COUNTY LINE TO HAMILTON COUNTY LINE;RESURFACING;CONSTRUCTION
$8,819,384
PROJECT TITLE: SR 70 FROM MANATEE COUNTY LINE TO CR 661 ;RESURFACING;CONSTRUCTION :::: PROJECT DESCRIPTION: SR 70 FROM MANATEE COUNTY LINE TO CR 661 ;RESURFACING;CONSTRUCTION
$8,604,372
PROJECT TITLE: SR-817/UNIVERSITY DRIVE FROM NOVA DRIVE TO SR-84;TRAFFIC OPS IMPROVEMENT;CONSTRUCTION :::: PROJECT DESCRIPTION: SR-817/UNIVERSITY DRIVE FROM NOVA DRIVE TO SR-84;TRAFFIC OPS IMPROVEMENT;CONSTRUCTION
$8,136,336
PROJECT TITLE: SR 700 FROM E OF FLORAL DR TO E OF CR 621 EAST;RESURFACING;CONSTRUCTION :::: PROJECT DESCRIPTION: SR 700 FROM E OF FLORAL DR TO E OF CR 621 EAST;RESURFACING;CONSTRUCTION
$8,069,498
PROJECT TITLE: SR 10 (US 90) FROM SR 277 VERNON HWY TO END OF 4L E OF CHIPLEY;RESURFACING;CONSTRUCTION :::: PROJECT DESCRIPTION: SR 10 (US 90) FROM SR 277 VERNON HWY TO END OF 4L E OF CHIPLEY;RESURFACING;CONSTRUCTION
$7,584,750
I-4 AT SR 557 ;INTERCHANGE IMPROVEMENT;ENVIRONMENTAL;DB
$7,060,512
PROJECT TITLE: W COLONIAL DR/MARTIN LUTHER KING BLVD FROM PINE HILLS RD TO TAMPA AVE;SAFETY PROJECT;CONSTRUCTION :::: PROJECT DESCRIPTION: W COLONIAL DR/MARTIN LUTHER KING BLVD FROM PINE HILLS RD TO TAMPA AVE;SAFETY PROJECT;CONSTRUCTION
$6,703,943
PROJECT TITLE: SR 33/CR 33 FROM POLK CO. LINE TO SR 50; SAFETY PROJECT; CONSTRUCTION :::: PROJECT DESCRIPTION: SR 33/CR 33 FROM POLK CO. LINE TO SR 50; SAFETY PROJECT; CONSTRUCTION
$6,283,025
PROJECT TITLE: SR 285 FROM S OF SR 293 MIDBAY CONNECTOR TO WALTON COUNTY LINE;RESURFACING;CONSTRUCTION :::: PROJECT DESCRIPTION: SR 285 FROM S OF SR 293 MIDBAY CONNECTOR TO WALTON COUNTY LINE;RESURFACING;CONSTRUCTION
$5,969,065
PROJECT TITLE: SR 80 FROM VERONICA SHOEMAKER TO KINGSTON DR ;SAFETY PROJECT;CONSTRUCTION :::: PROJECT DESCRIPTION: SR 80 FROM VERONICA SHOEMAKER TO KINGSTON DR ;SAFETY PROJECT;CONSTRUCTION
$5,789,525
PROJECT TITLE: SR 934/NW 79 STREET FROM NW 27 AVENUE TO NW 1 PLACE;SAFETY PROJECT;CONSTRUCTION :::: PROJECT DESCRIPTION: SR 934/NW 79 STREET FROM NW 27 AVENUE TO NW 1 PLACE;SAFETY PROJECT;CONSTRUCTION
$5,669,010
PROJECT TITLE: SR-9/I-95 NORTHBOUND OFF-RAMP TO EASTBOUND I-595;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION :::: PROJECT DESCRIPTION: SR-9/I-95 NORTHBOUND OFF-RAMP TO EASTBOUND I-595;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION
$5,667,583
PROJECT TITLE: US 19 (SR 55) FROM N OF CR 95 TO S OF PINE RIDGE WAY S;INTERCHANGE (NEW);PRELIMINARY ENGINEER :::: PROJECT DESCRIPTION: US 19 (SR 55) FROM N OF CR 95 TO S OF PINE RIDGE WAY S;INTERCHANGE (NEW);PRELIMINARY ENGINEER
$4,359,707
PROJECT TITLE: SAFETY STUDIES DISTRICT WIDE- CONTINUING ;PRELIMINARY ENGINEERING;PRELIMINARY ENGINEER :::: PROJECT DESCRIPTION: SAFETY STUDIES DISTRICT WIDE- CONTINUING ;PRELIMINARY ENGINEERING;PRELIMINARY ENGINEER
$3,651,443
PROJECT TITLE: ON-SYSTEM RUMBLE STRIPS ;SAFETY PROJECT;CONSTRUCTION :::: PROJECT DESCRIPTION: ON-SYSTEM RUMBLE STRIPS ;SAFETY PROJECT;CONSTRUCTION
$3,506,213
PROJECT TITLE: US 301/SR 43 FROM MANATEE CO LINE TO S OF SR 674/SUN CITY CENTER BLVD;RESURFACING;CONSTRUCTION :::: PROJECT DESCRIPTION: US 301/SR 43 FROM MANATEE CO LINE TO S OF SR 674/SUN CITY CENTER BLVD;RESURFACING;CONSTRUCTION
$3,443,384
PROJECT TITLE: SR-806/ATLANTIC AVE AT HOMEWOOD BLVD,SR-704 @ HAVERHILL RD;TRAFFIC SIGNAL UPDATE;CONSTRUCTION :::: PROJECT DESCRIPTION: SR-806/ATLANTIC AVE AT HOMEWOOD BLVD,SR-704 @ HAVERHILL RD;TRAFFIC SIGNAL UPDATE;CONSTRUCTION
$3,422,280
PROJECT TITLE: SR 500 @ CLARCONA OCOEE RD; TRAFFIC SIGNALS; CONSTRUCTION :::: PROJECT DESCRIPTION: SR 500 @ CLARCONA OCOEE RD; TRAFFIC SIGNALS; CONSTRUCTION
$3,143,147
PROJECT TITLE: SR 438 FROM HOMESTEAD RD TO PRINCETON ST; SAFETY PROJECT; CONSTRUCTION :::: PROJECT DESCRIPTION: SR 438 FROM HOMESTEAD RD TO PRINCETON ST; SAFETY PROJECT; CONSTRUCTION
$2,794,728
PROJECT TITLE: CTST CONSULTANT STUDY/DESIGN FOR SAFETY DESIGN PROJECTS;SAFETY PROJECT;PRELIMINARY ENGINEER :::: PROJECT DESCRIPTION: CTST CONSULTANT STUDY/DESIGN FOR SAFETY DESIGN PROJECTS;SAFETY PROJECT;PRELIMINARY ENGINEER
$2,757,103
PROJECT TITLE: SAFETY STUDIES DISTRICT WIDE- CONTINUING ;PRELIMINARY ENGINEERING;PRELIMINARY ENGINEER :::: PROJECT DESCRIPTION: SAFETY STUDIES DISTRICT WIDE- CONTINUING ;PRELIMINARY ENGINEERING;PRELIMINARY ENGINEER
$2,697,934
PROJECT TITLE: SR 45 (US 41) FROM 63RD AVE TO 53RD AVE ;SAFETY PROJECT;CONSTRUCTION :::: PROJECT DESCRIPTION: SR 45 (US 41) FROM 63RD AVE TO 53RD AVE ;SAFETY PROJECT;CONSTRUCTION
$2,534,386
PROJECT TITLE: SR 600 / US 17-92 AND ENTERPRISE RD INTERSECTION;INTERSECTION IMPROVEMENT;CONSTRUCTION :::: PROJECT DESCRIPTION: SR 600 / US 17-92 AND ENTERPRISE RD INTERSECTION;INTERSECTION IMPROVEMENT;CONSTRUCTION
$2,372,943
PROJECT TITLE: SRA1A(US90A)3RD ST AT 7TH AVE N AND 3RD AVE S;PEDESTRIAN SAFETY IMPROVEMENT;CONSTRUCTION :::: PROJECT DESCRIPTION: SRA1A(US90A)3RD ST AT 7TH AVE N AND 3RD AVE S;PEDESTRIAN SAFETY IMPROVEMENT;CONSTRUCTION
$2,364,349
PROJECT TITLE: SR-50/COLONIAL DR AT MAGUIRE BLVD SIGNAL REBUILD;TRAFFIC SIGNALS;RIGHT OF WAY :::: PROJECT DESCRIPTION: SR-50/COLONIAL DR AT MAGUIRE BLVD SIGNAL REBUILD;TRAFFIC SIGNALS;RIGHT OF WAY
$2,297,002
PROJECT TITLE: US 301/SR 43 FROM MANATEE CO LINE TO S OF SR 674/SUN CITY CENTER BLVD;RESURFACING;CONSTRUCTION :::: PROJECT DESCRIPTION: US 301/SR 43 FROM MANATEE CO LINE TO S OF SR 674/SUN CITY CENTER BLVD;RESURFACING;CONSTRUCTION
$2,286,981
PROJECT TITLE: I-295(SR9A) ARTERIAL TRAFFIC MGMT (BUCKMAN BRG)SR13 TO US17(SR15);ATMS - ARTERIAL TRAFFIC MGMT;CONSTRUCTION :::: PROJECT DESCRIPTION: I-295(SR9A) ARTERIAL TRAFFIC MGMT (BUCKMAN BRG)SR13 TO US17(SR15);ATMS - ARTERIAL TRAFFIC MGMT;CONSTRUCTION
$2,108,177
PROJECT TITLE: SR 78 FROM EVALENA LN TO NEW POST RD ;MEDIAN MODIFICATION;CONSTRUCTION :::: PROJECT DESCRIPTION: SR 78 FROM EVALENA LN TO NEW POST RD ;MEDIAN MODIFICATION;CONSTRUCTION
$2,058,390
PROJECT TITLE: HURRICANE IAN PERIWINKLE WAY BRIDGE - EMERGENCY BRIDGE REPAIRS;EMERGENCY OPERATIONS;STRUCTURAL DAMAGE - IN12024E :::: PROJECT DESCRIPTION: HURRICANE IAN PERIWINKLE WAY BRIDGE - EMERGENCY BRIDGE REPAIRS;EMERGENCY OPERATIONS;STRUCTURAL DAMAGE - IN12024E
$1,970,408
PROJECT TITLE: SR-5/US-1 FROM MIDWAY ROAD TO SOUTH OF EDWARDS ROAD;LIGHTING;CONSTRUCTION :::: PROJECT DESCRIPTION: SR-5/US-1 FROM MIDWAY ROAD TO SOUTH OF EDWARDS ROAD;LIGHTING;CONSTRUCTION
$1,914,464
PROJECT TITLE: US 301/SR 43 FROM MANATEE CO LINE TO S OF SR 674/SUN CITY CENTER BLVD;RESURFACING;CONSTRUCTION :::: PROJECT DESCRIPTION: US 301/SR 43 FROM MANATEE CO LINE TO S OF SR 674/SUN CITY CENTER BLVD;RESURFACING;CONSTRUCTION
$1,901,168
PROJECT TITLE: NASA BOULEVARD FROM WICKHAM ROAD TO US-1; ITS COMMUNICATION SYSTEM; CONSTRUCTION :::: PROJECT DESCRIPTION: NASA BOULEVARD FROM WICKHAM ROAD TO US-1; ITS COMMUNICATION SYSTEM; CONSTRUCTION
$1,830,094
PROJECT TITLE: CR 466 AT CR 475 ROUNDABOUT; ROUNDABOUT; CONSTRUCTION; LAP :::: PROJECT DESCRIPTION: CR 466 AT CR 475 ROUNDABOUT; ROUNDABOUT; CONSTRUCTION; LAP
$1,772,190
PROJECT TITLE: MILTON EMERGENCY REPAIR SR A1A DUNE REPAIR EXISTING SECANT WA; EMERGENCY OPERATION; EMERGENCY ROAD; SR A1A MP 5.523 TO 6.293 - MT73003E :::: PROJECT DESCRIPTION: MILTON EMERGENCY REPAIR SR A1A DUNE REPAIR EXISTING SECANT WA; EMERGENCY OPERATION; EMERGENCY ROAD; SR A1A MP 5.523 TO 6.293 - MT73003E
$1,771,037
PROJECT TITLE: SR70 FROM 15TH ST TO 87TH ST ;SAFETY PROJECT;PRELIMINARY ENGINEER :::: PROJECT DESCRIPTION: SR70 FROM 15TH ST TO 87TH ST ;SAFETY PROJECT;PRELIMINARY ENGINEER
$1,668,989
PROJECT TITLE: SR105 FROM: I-95 TO: BUSCH DRIVE;RESURFACING;CONSTRUCTION :::: PROJECT DESCRIPTION: SR105 FROM: I-95 TO: BUSCH DRIVE;RESURFACING;CONSTRUCTION
$1,632,105
PROJECT TITLE: SR A1A/COLLINS AVENUE FROM SOUTH OF SR 826 TO NORTH OF 178 STREET;PEDESTRIAN SAFETY IMPROVEMENT;CONSTRUCTION :::: PROJECT DESCRIPTION: SR A1A/COLLINS AVENUE FROM SOUTH OF SR 826 TO NORTH OF 178 STREET;PEDESTRIAN SAFETY IMPROVEMENT;CONSTRUCTION
$1,586,858
PROJECT TITLE: SR 683 (US 301) FROM S OF 25TH CT E TO S OF 13TH AVE E;RESURFACING;CONSTRUCTION :::: PROJECT DESCRIPTION: SR 683 (US 301) FROM S OF 25TH CT E TO S OF 13TH AVE E;RESURFACING;CONSTRUCTION
$1,561,990
PROJECT TITLE: SR 20 BLOUNTSTOWN HWY/SR 366 PENSACOLA ST FEASIBILITY STUDY;PD&E/EMO STUDY;PD & E :::: PROJECT DESCRIPTION: SR 20 BLOUNTSTOWN HWY/SR 366 PENSACOLA ST FEASIBILITY STUDY;PD&E/EMO STUDY;PD & E
$1,548,832
PROJECT TITLE: VICTORIA AVENUE OVER TIDAL BRANCH BRIDGE NO. 514060;BRIDGE REPLACEMENT;CONSTRUCTION :::: PROJECT DESCRIPTION: VICTORIA AVENUE OVER TIDAL BRANCH BRIDGE NO. 514060;BRIDGE REPLACEMENT;CONSTRUCTION
$1,495,835
PROJECT TITLE: HURRICANE IAN PERMANENT LIGHTING REPAIR;EMERGENCY OPERATIONS;PRELIMINARY ENGINEER;CHARLOTTE COUNTY - IN01005P :::: PROJECT DESCRIPTION: HURRICANE IAN PERMANENT LIGHTING REPAIR;EMERGENCY OPERATIONS;PRELIMINARY ENGINEER;CHARLOTTE COUNTY - IN01005P
$1,449,508
PROJECT TITLE: SR 580/E BUSCH BLVD AT N 18TH ST AND EAST OF N 22ND ST;PEDESTRIAN SAFETY IMPROVEMENT;CONSTRUCTION :::: PROJECT DESCRIPTION: SR 580/E BUSCH BLVD AT N 18TH ST AND EAST OF N 22ND ST;PEDESTRIAN SAFETY IMPROVEMENT;CONSTRUCTION
$1,419,378
PROJECT TITLE: HURRICANE IAN BIG CARLOS PASS TEMORARY REPAIR;EMERGENCY ROAD REPAIR;CR865 ESTERO BLVD APPROACH EROSION - IN12013E :::: PROJECT DESCRIPTION: HURRICANE IAN BIG CARLOS PASS TEMORARY REPAIR;EMERGENCY ROAD REPAIR;CR865 ESTERO BLVD APPROACH EROSION - IN12013E
$1,387,646
PROJECT TITLE: SR 600 AT THE INTERSECTION OF LOCKHART ST; TRAFFIC CONTROL DEVICES/SYSTEM; CONSTRUCTION :::: PROJECT DESCRIPTION: SR 600 AT THE INTERSECTION OF LOCKHART ST; TRAFFIC CONTROL DEVICES/SYSTEM; CONSTRUCTION
$1,309,080
PROJECT TITLE: SR 519/FISKE BLVD AT LEVITT PARKWAY/LAKEMOUR BLVD SIGNALIZATION; TRAFFIC CONTROL DEVICES/SYSTEM; CONSTRUCTION :::: PROJECT DESCRIPTION: SR 519/FISKE BLVD AT LEVITT PARKWAY/LAKEMOUR BLVD SIGNALIZATION; TRAFFIC CONTROL DEVICES/SYSTEM; CONSTRUCTION
$1,281,538
PROJECT TITLE: MARSHALL MIDDLE SCHOOL SIDEWALKS-VARIOUS LOCATIONS;SIDEWALK;CONSTRUCTION :::: PROJECT DESCRIPTION: MARSHALL MIDDLE SCHOOL SIDEWALKS-VARIOUS LOCATIONS;SIDEWALK;CONSTRUCTION
$1,228,465
PROJECT TITLE: HURRICANE DEBBY US19 AT WINN DIXIE IN CHND-EMERGENCY REPAIR;EMERGENCY OPERATION;EMERGENCY ROAD;US19/98 CAVE-IN/SINKHOLE - DY34005E :::: PROJECT DESCRIPTION: HURRICANE DEBBY US19 AT WINN DIXIE IN CHND-EMERGENCY REPAIR;EMERGENCY OPERATION;EMERGENCY ROAD;US19/98 CAVE-IN/SINKHOLE - DY34005E
$1,220,654
PROJECT TITLE: I-75/SR 93 AT FOWLER AVE;EMERGENCY OPERATIONS;EMERGENCY ROAD REPAI;175/SR93A S E FOWLER TO N E F - MT10009E :::: PROJECT DESCRIPTION: I-75/SR 93 AT FOWLER AVE;EMERGENCY OPERATIONS;EMERGENCY ROAD REPAI;175/SR93A S E FOWLER TO N E F - MT10009E
$1,177,829
PROJECT TITLE: HURRICANE DEBBY SR26 AT HATCHETT CREEK B #260033 - EMERGENCY;EMERGENCY OPERATION;EMERGENCY BRID;SR26 @ HATCHETT CREEK #260033 - DY26001E :::: PROJECT DESCRIPTION: HURRICANE DEBBY SR26 AT HATCHETT CREEK B #260033 - EMERGENCY;EMERGENCY OPERATION;EMERGENCY BRID;SR26 @ HATCHETT CREEK #260033 - DY26001E
$1,129,365
PROJECT TITLE: US41/SR45/S.FLORIDA AVE FR CR 480 TO E TOWER TRAIL;SIDEWALK;CONSTRUCTION :::: PROJECT DESCRIPTION: US41/SR45/S.FLORIDA AVE FR CR 480 TO E TOWER TRAIL;SIDEWALK;CONSTRUCTION
$1,122,468
PROJECT TITLE: SR 285 FROM S OF SR 293 MIDBAY CONNECTOR TO WALTON COUNTY LINE;RESURFACING;CONSTRUCTION :::: PROJECT DESCRIPTION: SR 285 FROM S OF SR 293 MIDBAY CONNECTOR TO WALTON COUNTY LINE;RESURFACING;CONSTRUCTION
$1,114,309
PROJECT TITLE: SR 60 FROM E BUCKINGHAM PL TO E OF LITHIA PINECREST RD;RESURFACING;CONSTRUCTION :::: PROJECT DESCRIPTION: SR 60 FROM E BUCKINGHAM PL TO E OF LITHIA PINECREST RD;RESURFACING;CONSTRUCTION
$1,098,343
PROJECT TITLE: SR 30 (US 98) FROM SANTA ROSA COUNTY LINE TO W OF JOSIE RD;RESURFACING;CONSTRUCTION :::: PROJECT DESCRIPTION: SR 30 (US 98) FROM SANTA ROSA COUNTY LINE TO W OF JOSIE RD;RESURFACING;CONSTRUCTION
$1,074,409
PROJECT TITLE: SR 50 AT THE INTERSECTION OF HIGHLAND AVE;TRAFFIC SIGNALS;CONSTRUCTION :::: PROJECT DESCRIPTION: SR 50 AT THE INTERSECTION OF HIGHLAND AVE;TRAFFIC SIGNALS;CONSTRUCTION
$1,051,322