TEXAS DEPARTMENT OF TRANSPORTATION

Total received in grants · trailing 12 months
$1.32B
vs. GOVERNOR'S AUTHORIZED REPRESENTATIVE ($39.0B), largest tracked grant recipient
$10for every U.S. household÷ 131M U.S. households
In perspective
0.8%of all $162.9B in tracked grants
159separate grants, trailing 12 months

TEXAS DEPARTMENT OF TRANSPORTATION has received $1.32B across 159 federal grants of $1M or more on record.

Data as of July 24, 2026. Source: USAspending.gov, prime contract awards $1M+. Federal spending data lags and has known gaps. This is not a real-time or complete record.

Grants by agency

Where this recipient’s grant dollars come from.

All grant awards

Swipe to see description and amount →

AgencyDescriptionAmount
PROJECT TITLE: WIDEN ROAD-ADD LANES ON IH 45. :::: PROJECT DESCRIPTION: IH 45 FROM 0.3 MILES NORTH OF SH 19 TO SH 30; FROM SH 30 TO 0.9 MILES NORTH OF SH 30. WIDEN ROAD - ADD LANES.
$122,213,962
PROJECT TITLE: FY 2026 STATE PLANNING AND RESEARCH WORK PROGRAM :::: PROJECT DESCRIPTION: FY 2026 STATE PLANNING AND RESEARCH WORK PROGRAM
$94,376,313
PROJECT TITLE: WIDEN ROAD - ADD LANES ON US 77 :::: PROJECT DESCRIPTION: US 77 FROM LEE COUNTY LINE TO SH 71. ADD 2 LANES TO CONVERT TO A 2 LANE TO A 4 LANE DIVIDED FACILITY INCLUDING WIDEN PAVEMENT, MEDIAN CONSTRUCTION, REALIGN OF ROADWAY, PLACEMENT OF ASPHALTIC CONCRETE PAVEMENT, UPGRADE STANDARD, AND PROPOSED DRAINAGE MODIFICATIONS.
$58,447,610
PROJECT TITLE: CONVERT NON-FREEWAY ON US 59 :::: PROJECT DESCRIPTION: US 59 FROM SH 60 TO 1 MILES SOUTH OF FM 961. UPGRADE TO RURAL FREEWAY (FUTURE I-69 CORRIDOR) INCLUDING WIDEN PAVEMENT, MEDIAN CONSTRUCTION, REALIGN OF ROADWAY, INTERCHANGE IMPROVEMENTS, UPGRADE STANDARD, CONSTRUCT INTERCHANGE AND PROPOSED DRAINAGE MODIFACATIONS.
$56,725,251
PROJECT TITLE: WIDEN ROAD-ADD LANES ON SL 1604 FROM IH 10 TO US 281. :::: PROJECT DESCRIPTION: SL 1604 FROM IH 10 TO US 281. WIDEN ROAD - ADD LANES.
$56,393,892
PROJECT TITLE: WIDEN ROAD AND ADD LANES ON UA 90. :::: PROJECT DESCRIPTION: UA 90 FROM FM 359 TO WEST OF SH 99; RECONSTRUCT AND WIDEN FROM 4 TO 6 LANE DIVIDED; PHASE 2 OF 3.
$48,384,455
PROJECT TITLE: WIDEN ROAD AND ADD LANES ON US 377. :::: PROJECT DESCRIPTION: US 377 FROM SOUTH OF FM 1171 TO CRAWFORD ROAD; RECONSTRUCT AND WIDEN ROADWAY FROM 2 LANE TO 4 LANE; SIDEWALKS, TURN LANES, TEXAS U TURN, NEW SIGNAL INSTALLATION WITH RETIMING, AND A GRADE SEPARATION.
$47,727,338
PROJECT TITLE: WIDEN ROAD ADD LANES ON SH 36. :::: PROJECT DESCRIPTION: SH 36 FROM SH 35 TO FM 522; SH 36 FROM SH 35 TO SOUTH OF SH 35; SH 36 FROM NORTH OF CR 467 HOGG RANCH ROAD TO SH 35. WIDEN ROAD ADD LANES.
$33,529,430
PROJECT TITLE: WIDEN ROAD AND ADD LANES ON SH 123. :::: PROJECT DESCRIPTION: SH 123 FROM CORDOVA LANE TO IH 10; EXPAND FROM 2 LANES TO 4 LANES WITH RAISED MEDIAN AND TURN LANES.
$33,447,854
PROJECT TITLE: RIGHT OF WAY ACQUISITION, RELOCATION, AND UTILITY ADJUSTMENTS ON IH 35. :::: PROJECT DESCRIPTION: IH 35 FROM US 77 (NORTH OF DENTON) TO COOKE COUNTY LINE. RIGHT OF WAY ACQUISITION, RELOCATION, AND UTILITY ADJUSTMENTS.
$30,919,203
PROJECT TITLE: WIDEN ROAD - ADD LANES ON SL 121 :::: PROJECT DESCRIPTION: SL 121 FROM LAKE ROAD (FM 439) TO SOUTH OF WEST AVENUE O. WIDEN ROAD - ADD LANES.
$28,392,011
PROJECT TITLE: WIDEN ROAD AND ADD LANES ON US 190. :::: PROJECT DESCRIPTION: ON US 190 FROM BRAZOS COUNTY LINE TO 1 MILE EAST OF FM 39 AND FROM 1 MILE EAST OF FM 39 TO MARTIN L KING BOULEVARD. WIDEN FROM 3 LANE TO 4 LANE DIVIDED HIGHWAY.
$25,863,172
PROJECT TITLE: WIDEN ROAD AND ADD LANES ON FM 2275. :::: PROJECT DESCRIPTION: FM 2275 FROM FM 1845, PINE TREE ROAD EAST TO SH 300 IN LONGVIEW; WIDEN 2 LANES TO 4 LANE DIVIDED ROADWAY WITH FLUSH MEDIAN.
$22,872,267
PROJECT TITLE: SURFACING AND ROADWAY RESTORATION ON US 87. :::: PROJECT DESCRIPTION: US 87 FROM AMARILLO CREEK TO 11TH STREET; HOT IN PLACE RECYCLE, ASPHALT CONCRETE PAVEMENT OVERLAY, SAFETY TREAT FIXED OBJECTS.
$22,308,052
PROJECT TITLE: CONSTRUCT NEW ROAD ON US 81. :::: PROJECT DESCRIPTION: US 81 AT FM 3479, HARMON ROAD, AND NORTH TARRANT PARKWAY; CONSTRUCT NORTH TARRANT PARKWAY OVER US 81/287 WITH TURNAROUND ON EASTSIDE; CONSTRUCT HARMON RD OVER US 81/287.
$20,245,736
PROJECT TITLE: WIDEN ROAD - ADD LANES ON IH 69 :::: PROJECT DESCRIPTION: IH 69 FROM SH 288 TO IH 45; RECONSTRUCT AND WIDEN FROM 8 TO 10 MAIN LANES AND RECONSTRUCT IH 69/SH 288 INTERCHANGE.
$19,952,402
PROJECT TITLE: RECONSTRUCT EXISTING ROADWAY ON US 81. :::: PROJECT DESCRIPTION: US 81 FROM NORTH OF HARMON ROAD TO NORTH OF IH 35W. RECONSTRUCT 2 LANE ONE WAY TO 2 LANE ONE WAY SOUTHBOUND FRONTAGE ROAD.
$16,706,370
PROJECT TITLE: REHABILITATE EXISTING ROADWAY ON SL 12. :::: PROJECT DESCRIPTION: SL 12 FROM SS 408 TO WEST FORK TRINITY RIVER; FULL DEPTH CONCRETE REPAIR, MILL AND INLAY, BRIDGE REPAIR.
$16,552,117
PROJECT TITLE: WIDEN ROAD AND ADD LANES ON SH 174. :::: PROJECT DESCRIPTION: SH 174 FROM WICKER HILL ROAD TO NORTH OF ELK DRIVE; RECONSTRUCT AND WIDEN FROM 4 TO 6 LANES RURAL DIVIDED WITH SIDEWALKS.
$16,427,214
PROJECT TITLE: BRIDGE REPLACEMENT ON US 83. :::: PROJECT DESCRIPTION: US 83 FROM 1.80 MILES SOUTH OF UVALDE COUNTY LINE AT NUECES RIVER; REPLACEMENT OF ON SYSTEM BRIDGE.
$15,975,435
PROJECT TITLE: CONSTRUCT BRIDGE, HIGHWAY IMPROVEMENT ON SH 71 :::: PROJECT DESCRIPTION: SH 71 FROM 0.85 MI. WEST OF TUCKER HILL LANE TO TRAVIS AND BASTROP COUNTY LINE - CONSTRUCT OVERPASS APPROACH AND ADD 2-LANE ONE-WAY EAST BOUND & WEST BOUND FRONTAGE ROADS; SH 71 FROM TRAVIS AND BASTROP COUNTY LINE TO 0.65 MILES EAST OF TUCKER HILL LANE - CONSTRUCT OVERPASS AND ADD 2-LANE ONE-WAY EAST BOUND & WEST BOUND FRONTAGE ROADS
$15,367,909
PROJECT TITLE: CONSTRUCT RAMPS ON IH 20. :::: PROJECT DESCRIPTION: IH 20 FROM FM 1884 TO SH 171; CONSTRUCT NEW RAMPS AND AUXILIARY LANES AT BETHEL ROAD.
$14,701,149
PROJECT TITLE: WIDEN ROAD AND ADD LANES AND SHOULDERS ON FM 2185. :::: PROJECT DESCRIPTION: FM 2185 FROM 750 FEET SOUTH OF LOONEY SPUR ROAD TO JUNCTION WITH FM 3541; ROADWAY FOR ENERGY SECTOR WHICH WILL EXTEND FM 2185 AND CREATE A CONNECTION TO RM 652 VIA FM 3541; EXTENSION OF A 2-LANE ROADWAY.
$13,124,618
RECONSTRUCT AND WIDEN TO 4 LANE DIVIDED URBAN SECTION ON SL 494
$12,533,190
PROJECT TITLE: RECONSTRUCT EXISTING ROADWAY ON WYCLIFF AVENUE. :::: PROJECT DESCRIPTION: WYCLIFF AVENUE FROM OAKLAWN AVENUE TO WEST OF GLENWOOD AVENUE. RECONSTRUCTION OF A 2/3 LANE ROADWAY THAT WILL INCLUDE A NEW BRIDGE STRUCTURE TO RAISE ROADWAY OUT THE 100 YEAR FLOODPLAIN AS WELL AS DRAINAGE IMPROVEMENTS AT TRIBUTARY 1 IN ORDER TO REDUCE AND ELIMINATE FLOOD FREQUENCY.
$12,480,000
PROJECT TITLE: WIDEN ROAD AND ADD LANES ON SH 80. :::: PROJECT DESCRIPTION: SH 80 FROM GUADALUPE COUNTY LINE TO US 90A. CONSTRUCT SUPER 2 LANES.
$10,427,852
PROJECT TITLE: REPLACE BRIDGE AND APPROACHES AT SABINE STREET. :::: PROJECT DESCRIPTION: SABINE STREET AT UNION PACIFIC RAILROAD AND SABINE STREET TO STR #001, IN LONGVIEW. REPLACE BRIDGE AND APPROACHES.
$10,333,167
PROJECT TITLE: REHABILITATE EXISTING ROADWAY ON IH 10. :::: PROJECT DESCRIPTION: IH 10 FROM 1.8 MILES WEST OF FM 11 TO FM 2886. REHAB IH 10 FROM WEST OF FM 11 TO FM 2886.
$10,213,895
PROJECT TITLE: RESURFACE ROADWAY ON BS 21-P, BS 7N, BU 59F, AND FM 2259 :::: PROJECT DESCRIPTION: BS7 NORTH FROM BS 21 P TO CRESTWOOD STREET; BS 21P FROM US 59 TO .338 MILES WEST OF FM 225, BS 21P FROM .338 MILES WEST OF FM 225 TO BU 59F, BS 7N FROM MOUND STREET TO BS 21P, BS 21 P FROM SH 21 AND BS 7N TO SL 224, BU 59F FROM NORTH SL 224 TO BS 21P AND BS 7N, BU 59F FROM SH 21 AND BS 21P TO .2 MILES NORTH OF SL 224, FM 2259 FROM BS 7N TO SL 224; ROADWAY RESURFACE MILL AND INLAY
$9,769,796
PROJECT TITLE: SEAL COAT ON US 96, US 59, US 190, SH 12, SH 327 :::: PROJECT DESCRIPTION: US 96 FROM RE 255, SOUTH TO FM 2799; FROM 150' SOUTH OF US 190, SOUTH TO 0.39 MILES SOUTH OF US 190; FROM FM 2799, SOUTH TO US 190; US 59 FROM TURNAROUND TO RIVER STREET AND FROM TURNAROUND TO BU 105; US 190 FROM 0.299 MILES WEST OF FM 256, EAST TO 1.023 MILES WEST OF US 69;US 190, 0.299 MILES WEST OF FM 256, EAST TO 1.023 MILES WEST OF US 69; FROM BNSF RAIL ROAD OVERPASS TO US 190; SH 12 FROM ORANGE COUNTY LINE, EAST TO SH 87;SH 12; SH 327 FROM US 69, EAST TO SOUTH 19TH STREET - 2026 SEAL COAT.
$9,727,173
PROJECT TITLE: INTERSECTION IMPROVEMENT ON SH 349 :::: PROJECT DESCRIPTION: SH 349 AT SH 191. INTERSECTION IMPROVEMENT
$9,570,744
PROJECT TITLE: WIDEN ROAD AND ADD LANES ON SH 72 :::: PROJECT DESCRIPTION: SH 72 FROM US 87 TO US 87 AND US 183. ADD 2 LANES FOR 4 LANE UNDIVIDED AND REHABILITATE ROADWAY.
$9,499,988
PROJECT TITLE: WIDEN ROAD - ADD LANES ON FM 2275 :::: PROJECT DESCRIPTION: FM 2275 FROM FM 3272 IN WHITE OAK, EAST TO FM 1845 (PINE TREE ROAD) IN LONGVIEW; WIDEN 2 LANES TO 4 LANE DIVIDED ROADWAY WITH FLUSH MEDIAN
$8,959,944
PROJECT TITLE: BRIDGE REPLACEMENT ON FM 1454 AND ON FM 1920. :::: PROJECT DESCRIPTION: FM 1454 AT WOLF CREEK BRIDGE AND FM 1920 AT LITTLE SAND CREEK BRIDGE. REPLACE EXISTING BRIDGE.
$8,817,032
PROJECT TITLE: CONSTRUCT NEW ROAD ON SH 84 :::: PROJECT DESCRIPTION: SH 84 FROM FM 1472 TO IH 35 WEST FRONTAGE ROAD; CONSTRUCTION OF NEW ROADWAY 4-LANE DIVIDED HIGHWAY HACHAR-REUTHINGER
$8,653,740
PROJECT TITLE: WIDEN ROAD ADD LANES ON US 190. :::: PROJECT DESCRIPTION: US 190 FROM CORYELL COUNTY LINE TO US 190 WEST OF CLARK ROAD; WIDEN FROM TWO TO FOUR LANE DIVIDED HIGHWAY AND CONSTRUCT INTERCHANGE.
$8,548,488
PROJECT TITLE: INTERCHANGE IMPROVEMENT ON IH 35 EAST. :::: PROJECT DESCRIPTION: IH 35 FROM SOUTH OF MAYHILL ROAD TO SOUTH OF SL 288; RECONSTRUCT GRADE SEPARATION AND EXISTING 4 CONTINUOUS TO 4 LANE CONTINUOUS FRONTAGE ROADS.
$8,520,623
PROJECT TITLE: SH 146 FROM RED BLUFF TO THE GALVESTON COUNTY LINE. RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS :::: PROJECT DESCRIPTION: SH 146 FROM RED BLUFF TO THE GALVESTON COUNTY LINE 400HT OF WAY ACQUISITION AND ROWLITY ADJUSTMENTS
$8,473,425
PROJECT TITLE: INFRASTRUCTURE IMPROVEMENTS AT VARIOUS LOCATIONS IN THE AUSTIN DISTRICT. :::: PROJECT DESCRIPTION: VARIOUS LOCATIONS; SD-WAN WILL PROVIDE THE NETWORK BANDWIDTH AND THE NETWORK REDUNDANCY FOR INNOVATIVE CORRIDORS AND THE SIGNIFICANT AMOUNT OF DATA TO BE TRANSFERRED. SD-WAN WILL ALLOW FOR THE SEGMENTATION OF BUSINESS AND TRAFFIC NETWORKS.
$7,732,226
PROJECT TITLE: INTERSECTION IMPROVEMENTS WITH RIGHT AND LEFT TURN LANES ON FM 920. :::: PROJECT DESCRIPTION: FM 920 FROM COLLEGE STREET TO RIC WILLIAMSON MEMORIAL HIGHWAY; WIDEN STRUCTURES AND ROADWAY TO ACCOMMODATE THE FOLLOWING LEFT, RIGHT, AND CENTER TURN LANES AT BLUE RIDGE DRIVE, JOHNSON BEND ROAD, GREEN ACRES ROAD, STAR POINT LANE, AND SUNRISE TRAIL.
$7,690,451
PROJECT TITLE: TRAFFIC SIGNAL IMPROVEMENTS IN MONTGOMERY COUNTY. :::: PROJECT DESCRIPTION: VARIOUS LOCATIONS IN MONTGOMERY COUNTY. REPLACE/UPGRADE 129 SIGNAL CABINETS, CONTROLLERS, AND RADAR DETECTION. INSTALL NEW ADVANCED TRANSPORTATION MONITORING SYSTEM AND PURCHASE/INSTALL 364 NEW ADVANCED PEDESTRIAN BUTTONS WHERE NONE EXIST CURRENTLY, AND PAVEMENT MARKINGS AND CROSSWALKS.
$7,305,000
PROJECT TITLE: INTERSTATE DESIGNATION ON US 281 :::: PROJECT DESCRIPTION: US 281 FROM 0.273 MILES SOUTH OF SH 186 TO 0.023 MILES NORTH OF FM 490. RURAL EXPRESSWAY FACILITY (FUTURE I-69 CORRIDOR)
$7,206,149
PROJECT TITLE: INTERCHANGE IMPROVEMENT ON IH 30. CONSTRUCT NEW ROAD ON IH30. BRIDGE REPLACEMENT ON IH30 :::: PROJECT DESCRIPTION: IH 30 FROM 1.2 MILES EAST OF FM 1903 TO 1.0 MILES EAST OF FM 1570 RECONSTRUCT OVERPASS AND APPROACHES. IH30 FROM 1.0 MILES EAST OF FM 1570 TO 0.1 MILES EAST OF MONTY STRATTON WIDEN OVERPASS FROM 4-LANES TO 6-LANES AND APPROACHES. IH30 1.0 MILES WEST OF FM 1903 TO 1.0 MILES EAST OF FM 1903 RECONSTRUCT OVERPASS.
$7,113,729
PROJECT TITLE: CONSTRUCT BRIDGE ON IH 20 :::: PROJECT DESCRIPTION: IH 20 FROM SL 250 TO 0.5 MILES EAST OF MIDKIFF ROAD. CONSTRUCT BRIDGE.
$6,041,533
PROJECT TITLE: REHABILITATE EXISTING ROADWAY ON FM 907. :::: PROJECT DESCRIPTION: FM 907 FROM RANCHO BLANCO ROAD TO FM 3072; REHABILITATE ROADWAY.
$5,904,991
PROJECT TITLE: INTERSECTION IMPROVEMENT ON FM 1281. :::: PROJECT DESCRIPTION: FM 1281 FROM HORIZON BOULEVARD AT DARRINGTON INTERSECTION. INTERSECTION AND OPERATIONAL IMPROVEMENT.
$5,874,187
PROJECT TITLE: RESURFACE ROADWAYS US 281, SH 97, SH 173, FM 1518, FM 3432, FM 1343, FM 1346, FM 1516, FM 3175, AND FM 3445. :::: PROJECT DESCRIPTION: US 281 FROM BEXAR ATASCOSA COUNTY LINE TO SP 242; SH 97 FROM WILSON ATASCOSA COUNTY LINE TO PARSONS ROAD; SH 97 FROM SH 16 TO FM 1333; SH 173 FROM CR 5710 TO US 90; SH 173 FROM IH 35 TO MEDINA FRIO COUNTY LINE; SH 173 FROM MEDINA FRIO COUNTY LINE TO FRIO ATASCOSA COUNTY LINE; FM 1518 FROM IH 10 TO LP 1604; FM 3432 FROM FM 1628 TO WILSON COUNTY LINE; FM 1343 FROM US 90 TO SH 173; FM 1346 FROM LP 1604 TO WILSON COUNTY LINE; FM 1346 FROM FOSTER ROAD TO LP 1604; FM 1516 FROM IH 10 TO US 87; FM 3175 FROM 0.3 MILES WEST OF IH 35 TO FM 476; FM 3445 FROM SH 16 TO END OF MAINTENANCE. SEAL COAT AND PAVEMENT MARKINGS.
$5,296,988
PROJECT TITLE: REHABILITATE EXISTING ROADWAY ON FM 1884. :::: PROJECT DESCRIPTION: FM 1884 FROM SOUTH OF FLEET STREET TO END OF THE STATE MAINTENANCE. MILL, FULL DEPTH RECLAMATION AND OVERLAY.
$5,287,537
PROJECT TITLE: BRIDGE MAINTENANCE ON IH 30 AND SL 151 :::: PROJECT DESCRIPTION: IH 30 AT TANKERSLEY CREEK (WEST BOUND); AT TANKERSLEY CREEK; AT US 271; AT US 259; AT CR 4008; AT US 82; AT SH 98 (WESTBOUND); AT SH 98 (EAST BOUND); SL 151 FROM FM 558; SL 151 FROM SH 93. PERFORM BRIDGE MAINTENANCE.
$5,171,197
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY ON US 287. :::: PROJECT DESCRIPTION: US 287 FROM 2.0 MILES WEST OF FM 2889 TO FM 294; US 287 FROM FM 294 TO DONLEY CO LINE; INSTALL CABLE BARRIER; US 287 FROM FM 294 TO 3.6 MILES EAST OF FM 294; INSTALL SAFETY LIGHTING AT PARKING AREAS EAST OF GOODNIGHT,
$5,122,121
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY ON IH 610. :::: PROJECT DESCRIPTION: IH 610 FROM IH 10 (WEST) TO IH 10 (EAST); IH 610 FROM IH 10 (EAST) TO SH 225; IH 610 FROM IH 45 (SOUTH) TO SH 288; IH 610 FROM SOUTH POST OAK ROAD TO IH 10 (WEST); IH 610 FROM SH 225 TO IH 45 (SOUTH). INSTALL, UPGRADE AND REPAIR HIGH-MATY SAFETY LIGHTING.
$5,050,564
PROJECT TITLE: WIDEN ROAD AND ADD LANES ON US 377. :::: PROJECT DESCRIPTION: US 377 FROM SOUTH OF FM 1171 TO CRAWFORD ROAD; RECONSTRUCT AND WIDEN ROADWAY FROM 2 LANE TO 4 LANE; SIDEWALKS, TURN LANES, TEXAS U TURN, NEW SIGNAL INSTALLATION WITH RETIMING, AND A GRADE SEPARATION.
$4,886,819
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY ON IH 20 :::: PROJECT DESCRIPTION: IH 20 FROM CALLAHAN COUNTY LINE TO .3 MILES EAST OF FM 570 AND FROM 0.41 MILES WEST OF FM 2461 TO LP 254 (EAST INTERSECTION). HAZARD ELIMINATION AND SAFETY.
$4,852,427
PROJECT TITLE: RECONSTRUCT EXISTING ROADWAY ON US 81. :::: PROJECT DESCRIPTION: US 81 FROM NORTH OF HARMON ROAD TO NORTH OF IH 35W; RECONSTRUCT 2 TO 2 LANE NORTHBOUND FRONTAGE ROAD.
$4,813,065
PROJECT TITLE: CONSTRUCT PEDESTRIAN INFRASTRUCTURE ON FM 3470. :::: PROJECT DESCRIPTION: FM 3470 FROM SH 201 TO IH 14; INSTALL SIDEWALK.
$4,562,787
PROJECT TITLE: REHABILITATE EXISTING ROADWAY ON US 67. :::: PROJECT DESCRIPTION: US 67 FROM DALLAS COUNTY LINE TO BUS 287Q. FLEXIBLE PAVEMENT REPAIR, MILL, OVERLAY AND SLOPE REPAIR.
$4,557,579
PROJECT TITLE: SEAL COAT ON BI 20H, BI 20J, SH 351, SH 70, US 380, US 283, SH 208, RM 33, FM 846, FM 1584,FM 1606, FM 1610, FM 419, FM 461, FM 1661, FM 2228, FM 2279 :::: PROJECT DESCRIPTION: ON BI 20H FROM FM 670 TO IH 20; BI 20J FROM I-20 WEST TO BI-20 EAST, SH 351 FROM 4.5 MILES EAST OF FM 604 TO US 180; SH 70 FROM US 380 TO FISHER COUNTY LINE; US 380 FROM STONEWALL COUNTY LINE TO SH 6; US 380 FROM SH 6 TO US 277 EAST FRONTAGE ROAD; US 283 FROM SHACKELFORD COUNTY LINE TO 0.25 MILES NORTH OF BI 20-T; SH 208 FROM IH 20 TO COKE COUNTY LINE; RM 33 FROM US 87 TO GLASSCOCK COUNTY LINE; FM 846 FROM MARTIN COUNTY TO US 87; FM 1584 FROM BORDEN COUNTY TO US 87; FM 1606 FROM SH 350 TO SH 208; FM 1610 FROM BORDEN COUNTY TO FM 1606; FM 419 FROM US 180 TO FM 611; FM 461 FROM GLASSCOCK COUNTY LINE TO US 87;FM 1661 FROM SH 283 TO JONES COUNTY LINE; FM 1661 FROM SH 6 TO SH 283; FM 2228 FROM I-20 SOUTH FRONTAGE ROAD TO FM 880; FM 2279 FROM KNOX COUNTY LINE TO FM 617; FM 2746 FROM FM 126 TO US 83. SEAL COAT.
$4,535,039
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY ON BU 90U, BU 290H, FM 149, FM 1942, FM 3083, AND SH 242. :::: PROJECT DESCRIPTION: BU 90U FROM SHELDON ROAD TO CHAMPION PAPER DRIVE, BU 290H FROM SH 159, 10TH STREET, HARRIS COUNTY LINE, AND WALLER COUNTY LINE TO WARREN RANCH DRIVE, FM 149 FROM FM 1097 TO SH 105, FM 1942 FROM CROSBY LYNCHBURG ROAD TO NORTH MAIN STREET, FM 3083 FROM FM 2090 TO FM 1485, SH 242 FROM IH 45 TO GREAT OAKS DRIVE AND FROM LEXINGTON DRIVE TO HARPER'S TRACE. FIBER INSTALLATION TO CONNECT TRAFFIC SIGNALS.
$4,393,144
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY ON FM 227. :::: PROJECT DESCRIPTION: FM 227 FROM FM 2544 TO 3.3 MILES EAST OF FM 2544; RECONSTRUCT EXISTING PAVEMENT, SAFETY TREAT FIXED OBJECTS, MILLED EDGELINE RUMBLE STRIPS, PROVIDE ADDITIONAL PAVED SURFACE WIDTH 28 INCH, MILLED CENTERLINE RUMBLE STRIPS.
$4,381,613
PROJECT TITLE: SEAL COAT ON US 67,SH 8,FM 1186,SH 11,US 259,US 80,FM 2208,SH 77,FM 250,FM 959,FM 999,SH 155,FM 71,FM 125,FM 124,FM 251,FM 1968,FM 1993,FM 1404,FM 114 :::: PROJECT DESCRIPTION: SEAL COAT ON US 67,SH 8,FM 1186,SH 11,US 259,US 80,FM 2208,SH 77,FM 250,FM 959,FM 999,SH 155,FM 71,FM 125,FM 124,FM 251,FM 1968,FM 1993,FM 1404,FM 114, FM 1793, FM 1969, FM 24545, FM 1841
$4,276,634
PROJECT TITLE: WIDEN ROAD - ADD LANES ON US 77 :::: PROJECT DESCRIPTION: US 77 FROM LEE COUNTY LINE TO SH 71. ADD 2 LANES TO CONVERT TO A 2 LANE TO A 4 LANE DIVIDED FACILITY INCLUDING WIDEN PAVEMENT, MEDIAN CONSTRUCTION, REALIGN OF ROADWAY, PLACEMENT OF ASPHALTIC CONCRETE PAVEMENT, UPGRADE STANDARD, AND PROPOSED DRAINAGE MODIFICATIONS.
$4,274,622
PROJECT TITLE: RIGHT OF WAY ACTIVITIES INCLUDING ACQUISITION, AND UTILITY ADJUSTMENTS ON IH 20. :::: PROJECT DESCRIPTION: IH 20 FROM EAST OF JONH BEN SHEPPERD PARKWAY TO MIDLAND COUNTY LINE. RIGHT OF WAY ACTIVITIES INCLUDING ACQUISITION, AND UTILITY ADJUSTMENTS ON IH 20.
$4,261,921
PROJECT TITLE: REHABILITATE EXISTING ROADWAY ON SS 380. :::: PROJECT DESCRIPTION: SS 380 FROM THREADNEEDLE ROAD, SOUTH TO JIM GILLIGAN WAY; FULL DEPTH CONCRETE REPAIR, SPALL REPAIR, CLEAN AND SEAL JOINTS, SMAR-F, CEMENT TREATED BASE.
$4,070,555
PROJECT TITLE: RIGHT OF WAY ON US 83 :::: PROJECT DESCRIPTION: US 83 FROM 0.22 MILES SOUTH OF LASSO LANE TO 0.28 MILES NORTH OF FM 2687. RIGHT OF WAY
$3,968,295
PROJECT TITLE: BRIDGE REPLACEMENT ON FM 324 :::: PROJECT DESCRIPTION: FM 324 AT HURRICANE CREEK; REPLACE BRIDGE AND APPROACHES.
$3,852,176
PROJECT TITLE: HIGHWAY IMPROVEMENT ON SH 70. :::: PROJECT DESCRIPTION: SH 70 FROM US 82 TO 8 MILES NORTH OF US 82; ASPHALT CONCRETE PAVEMENT OVERLAY.
$3,685,656
PROJECT TITLE: BRIDGE REMOVAL ON SH 332. :::: PROJECT DESCRIPTION: SH 332 AT BRAZOS RIVER AND FM 521. BRIDGE REMOVAL AND REPLACEMENT.
$3,624,170
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY ON FM 2311. :::: PROJECT DESCRIPTION: FM 2311 FROM FM 308 TO SH 31. WIDEN LANES, WIDEN PAVED SHOULDER.
$3,618,090
PROJECT TITLE: RECONSTRUCT AND WIDEN TO 4 LANE DIVIDED URBAN SECTION ON SL 494 :::: PROJECT DESCRIPTION: SL 494 FROM NORTH OF KINGWOOD DRIVE TO NORTH OF SORTERS-MCCLELLAN ROAD. RECONSTRUCT AND WIDEN TO 4 LANE DIVIDED URBAN SECTION.
$3,600,000
PROJECT TITLE: HIGHWAY IMPROVEMENT ON SLAUGHTER LANE. :::: PROJECT DESCRIPTION: ON SLAUGHTER LANE FROM BRODIE LANE TO STATE LOOP 1 NORTHBOUND MOPAC EXPRESSWAY. HIGHWAY IMPROVEMENT. RECONSTRUCT FROM 4 LANE TO 6 LANE DIVIDED ROADWAY WITH SHARED USE PATH AND INTERSECTION IMPROVEMENTS.
$3,595,272
PROJECT TITLE: RESURFACE ROADWAY SS ON 557. :::: PROJECT DESCRIPTION: SS 557 FROM US 80 TO IH 20; OVERLAY IN STONE MASTIC ASPHALT SECTION AND FULL DEPTH RECLAMATION IN CONCRETE PAVEMENT.
$3,570,141
PROJECT TITLE: CONSTRUCT PEDESTRIAN INFRASTRUCTURE AT VARIOUS LOCATIONS IN THE BROWNWOOD DISTRICT. :::: PROJECT DESCRIPTION: VARIOUS LOCATIONS IN THE CITY OF COLEMAN. CONSTRUCT 1.75 MILES OF 5 FOOT WIDE SIDEWALKS, AMERICANS WITH DISABILITIES ACT RAMPS, NEW PAVEMENT MARKS AND SAFETY LIGHTING ALONG 5TH AVENUE FROM WEST WALNUT STREET TO WEST 15TH STREET FROM 5TH AVENUE TO COMMERCIAL STREET AND ALONG COMMERCIAL STREET FROM WEST WALNUT STREET TO EAST LIVE OAK STREET.
$3,245,339
PROJECT TITLE: REHABILITATE EXISTING ROADWAY ON FM 1472. :::: PROJECT DESCRIPTION: FM 1472 FROM TRADE CENTER BOULEVARD TO 0.4 MILES NORTH OF TRADE CENTER BOULEVARD; CONSISTING OF CONCRETE PAVEMENT, LEFT TURN LANE, STRUCTURAL, PAVEMENT MARKINGS, AND SIGNS.
$3,185,289
PROJECT TITLE: BRIDGE REPLACEMENT ON SH 70. :::: PROJECT DESCRIPTION: SH 70 AT QUITAQUE RIVER; BRIDGE REPLACEMENT. SH 70 AT LITTLE RED RIVER; BRIDGE REHABILITATION.
$3,127,450
PROJECT TITLE: SEAL COAT ON US 84, SH 164, SH 7, FARM MARKET 107, FARM MARKET 1304 :::: PROJECT DESCRIPTION: US 84 FROM FARM MARKET 930 TO US 281, STATE HIGHWAY 164 FROM MCLENNAN COUNTY LINE TO LCR 344, STATE HIGHWAY 7 FROM IH 35 TO FALLS C/L, FARM MARKET 107 FROM STATE HIGHWAY 317 TO IH 35, FARM MARKET 1304FROM IH35 TO FARM MARKET 933, TIRE RUBBER SEAL
$3,101,969
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY AT VARIOUS LOCATIONS. :::: PROJECT DESCRIPTION: VARIOUS LOCATIONS IN THE LUBBOCK DISTRICT; FY 2026 STRIPING AND LONGLINE.
$3,051,778
PROJECT TITLE: BRIDGE REPLACEMENT ON FM 1835 :::: PROJECT DESCRIPTION: FM 1835 AT DOUBLE MOUNTAIN FORK BRAZOS RIVER; REPLACE BRIDGE.
$3,000,508
PROJECT TITLE: SEAL COAT ON BI 35X,SS 437,FM 986,FM 90,FM 156,FM 148,FM 45 ,FM 744,FM 550,FM 813,FM 1446,FM 1641,FM 1183,FM 1387,FM 1565,FM 2578, AND FM 3133. :::: PROJECT DESCRIPTION: SEAL COAT AND PAVEMENT MARKINGS ON BI 35X, SS 437, FM 90, FM 156, FM 148, FM 455, FM 744, FM 550, FM 813, FM 1446, FM 1641, FM 1183, FM 1387, FM 1565, FM 744, FM 2578 AND FM 3133
$2,980,978
PROJECT TITLE: INSTALL ILLUMINATION ON IH 14. :::: PROJECT DESCRIPTION: IH 14 FROM JASPER DRIVE TO ROSEWOOD DRIVE; SAFETY LIGHTING.
$2,979,617
PROJECT TITLE: BRIDGE REPLACEMENT ON FM 521. :::: PROJECT DESCRIPTION: FM 521 AT OYSTER CREEK. REPLACE BRIDGE AND APPROACHES.
$2,920,543
PROJECT TITLE: PREVENTIVE MAINTENANCE, SEAL COAT ON SH 24, US 82, US 75. :::: PROJECT DESCRIPTION: SH 24 FROM FM 499 TO IH 30; US 82 FROM FM 901 TO FM 1417;US 75 FROM EFR US 69 TO NORTH LOY LAKE ROAD; SH 24 FROM LP 178/SH 11 TO FM 513; SH 24 FROM FM 513 TO FM 499; FY 26 SEAL COAT.
$2,854,105
PROJECT TITLE: BRIDGE MAINTENANCE; VARIOUS LOCATIONS DISTRICTWIDE. :::: PROJECT DESCRIPTION: VARIOUS LOCATIONS DISTRICTWIDE; FM 2538, FM 2696, IH 10, IH 37, IH 410, SH 123, SH 46, SS 122, UA 90, US 181, US 281, AND US 87; ADDRESS VARIOUS BRIDGE REPAIR INCLUDING SCOUR AND SLOPE FAILURE 2026.
$2,799,892
PROJECT TITLE: SURFACING/ROADWAY RESTORATION ON UA 90, IH 69, US 59, SH 6. :::: PROJECT DESCRIPTION: UA 90 FROM WHARTON COUNTY LINE TO FM 723, FROM FM 723 TO FM 762, FROM FM 762 TO SH 6, IH 69 FROM EAST OF SS 529 TO HARRIS COUNTY LINE, IH 69 FROM FORT BEND COUNTY LINE TO EAST OF SL 8 WEST, US 59 FROM WHARTON COUNTY LINE TO EAST OF SS 529; SH 6 FROM UA 90 TO MISSOURI CITY CITY LIMITS; REPLACE PAVEMENT MARKINGS.
$2,790,944
PROJECT TITLE: PREVENTIVE MAINTENANCE ON US 290. :::: PROJECT DESCRIPTION: US 290 FROM GREGG MANOR ROAD TO FM 973; FULL DEPTH RECLAMATION, BONDING COURSE, AND THIN OVERLAY MIXTURE.
$2,723,212
PROJECT TITLE: RECONSTRUCT EXISTING ROADWAY ON US 81. :::: PROJECT DESCRIPTION: US 81 FROM NORTH OF HARMON ROAD TO NORTH OF IH 35W; RECONSTRUCT 2 TO 2 LANE NORTHBOUND FRONTAGE ROAD.
$2,721,511
PROJECT TITLE: BRIDGE MAINTENANCE ON RM 620 AND RM 2222 :::: PROJECT DESCRIPTION: RM 620 AT COLORADO RIVER AND RM 2222 AT CAT CREEK; BRIDGE MAINTENANCE
$2,705,430
PROJECT TITLE: RESURFACE ROADWAY ON FS 762, FM 1640. :::: PROJECT DESCRIPTION: FS 762 FROM FM 762 TO UA 90 AND FM 1640 FROM SS 529 TO WEST FM 2218; TWO INCH PLANING, BASE REPAIR, SEAL COAT, TWO INCH ASPHALT CONCRETE PAVEMENT OVERLAY, AND PAVEMENT MARKINGS.
$2,667,078
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY ON SH 6. :::: PROJECT DESCRIPTION: SH 6 FROM MEMORIAL DRIVE TO WESTPARK DRIVE; INSTALL SAFETY LIGHTING.
$2,631,319
PROJECT TITLE: ACCESS MANAGEMENT AND WIDEN FROM 4 TO 6 LANES IN SECTIONS ON GARTH ROAD. :::: PROJECT DESCRIPTION: FROM GARTH ROAD; IH 10 TO SH 146. ACCESS MANAGEMENT AND WIDEN FROM 4 TO 6 LANES IN SECTIONS.
$2,627,000
PROJECT TITLE: BRIDGE REPLACEMENT ON ERIE STREET. :::: PROJECT DESCRIPTION: ERIE STREET AT LNVA CANAL; BRIDGE REPLACEMENT.
$2,592,552
PROJECT TITLE: REPLACE BRIDGE AND APPROACHES ON CR 151. :::: PROJECT DESCRIPTION: CR151 AT NUECES RIVER, 0.3 MILES SOUTHWEST OF FM 799. REPLACE BRIDGE AND APPROACHES.
$2,552,588
PROJECT TITLE: CONSTRUCT PEDESTRIAN INFRASTRUCTURE ON SH 71. :::: PROJECT DESCRIPTION: SH 71 FROM 2765 TO BU 59S AND FROM BU 59S TO US 59 FRONTAGE ROAD. CONSTRUCT SIDEWALKS, CURB RAMPS AND SIDWALK IMPROVEMENTS.
$2,537,774
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY AT VARIOUS TO INCLUDE US 96; SH 105; US 90; FM 326; FM 692; RE 255; US 190; SH 63. :::: PROJECT DESCRIPTION: VARIOUS LOCATIONS ON US 96; SH 105; US 90; FM 326; FM 692; RE 255; US 190; SH 63. DISTRICT WIDE PAVEMENT MARKINGS AND SPECIFIED LOCATION SAFETY RE-STRIPING.
$2,531,821
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY ON SH 29. :::: PROJECT DESCRIPTION: SH 29 FROM SH 71 TO 0.110 MILES EAST OF ZULA ROAD; CONSTRUCT 5 FOOT PAVED SHOULDERS, PROFILE EDGE AND CENTERLINE STRIPING.
$2,502,671
PROJECT TITLE: FY 2027 SPR SUBPART B; ANNUAL IMPLEMENTATION PROGRAM. :::: PROJECT DESCRIPTION: FY 2027 SPR SUBPART B ANNUAL IMPLEMENTATION PROGRAM; RESEARCH WORK PROGRAM.
$2,496,000
PROJECT TITLE: WIDEN ROAD/ADD LANES ON IH 30. :::: PROJECT DESCRIPTION: IH 30 FROM IH 35 EAST TO IH 45; IH 35 EAST TO CESAR CHAVEZ BOULEVARD; RECONSTRUCT AND WIDEN 6 TO 12 GP, RECONSTRUCT 2/6 TO 2/6 LANE DISC FRONTAGE ROADS AND REMOVE 4 WESTBOUND COLLECTOR-DISTRIBUTOR LANES; CESAR CHAVEZ BOULEVARD TO IH 45 RECONSTRUCT AND WIDEN 6 TO 12 GP, RECONSTRUCT 1 TO 1 LANE HOV-R AND CONSTUCT 0 TO 2/4 LANE DISC FRONTAGE.
$2,457,351
PROJECT TITLE: TRAFFIC MANAGEMENT CENTER UPGRADE AT VARIOUS LOCATIONS DISTRICT WIDE TO INCLUDE CHERMONT DRIVE, CROMO DRIVE, CROSSROADS DRIVE, NORTHWESTERN DRIVE. :::: PROJECT DESCRIPTION: UPGRADE CITY'S TRAFFIC MANAGEMENT CENTER AND TRAFFIC SIGNAL CONTROLLER EQUIPMENT, PHASE 5, ON THE VARIOUS LOCATIONS IN EL PASO CITY. VARIOUS LOCATIONS INCLUDE CHERMONT DRIVE, CROMO DRIVE, CROSROADS DRIVE, NORTHWESTERN DRIVE, PASEO DEL NORTE, PLEXXAR, SAN FRANCISCO STREET, TALBOT AVENUE. BELVIDERE STREET, CRESTMONT DRIVE, FATHER RAHM AVENUE, GATEWAY EAST/WEST, ISELA RUBALCAVA BOULEVARD, MISSOURI AVENUE, OSBOURNE DRIVE, THORN AVENUE, WYOMING AVENUE, ARIZONA AVENUE, ESCONDIDO DRIVE, FRANKLIN AVENUE, MAIN DRIVE, MILLS AVENUE, BYRTLE AVENUE, NORTH STANTON STREET, OREGON STREET, OVERLAND AVENUE, RIO GRANDE AVENUE, SAN ANTONIO AVENUE, SANTA FE STREET, SEVENTH STREET, SHADOW MOUNTAIN DRIVE, SP 1966, WESTWIND DRIVE, YANDELL DRIVE, COUNTRY CLUB ROAD, EL PASO STREET, LP 375, MONTANA, REDD ROAD, RESLER DRIVE, SH 178, SH 20, SUNLAND PARK DRIVE, AND US 62. .
$2,395,476
PROJECT TITLE: WIDEN ROAD AND ADD LANES ON IH 35. :::: PROJECT DESCRIPTION: IH 35 FROM HOLLY STREET TO US 290 WEST/SH 71. RECONSTRUCT I-35, ADD 2 NORTH BOUND AND 2 SOUTH BOUND NON-TOLLED MANAGED LANES, CONSTRUCT BYPASS LANES, STRUCTURES, DRAINAGE, SHARED USE PATHS, AND RECONSTRUCT INTERSECTIONS, RAMPS, GP LANES AND FRONTAGE ROADS.
$2,389,490
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY ON US 281. :::: PROJECT DESCRIPTION: US 281 FROM 0.8 MILES NORTH OF PR1 TO 0.515 MILES SOUTH OF PR1; CONSTRUCT 5 FOOT PAVED SHOULDER, PROFILE EDGE AND CENTER LINE STRIPING.
$2,305,979
PROJECT TITLE: IH 35 FROM S LP 340 TO N LP 340. RIGHT OF WAY ACQUISITION, RELOCATION ASSISTANCE & ADJUSTMENT OF UTILITIES :::: PROJECT DESCRIPTION: IH 35 FROM S LP 340 TO N LP 340 ACQUISITION, RELOCATION ASSISTANCE & ADJUSTMENT OF UTILITIES
$2,292,750
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY ON VARIOUS LOCATIONS IN THE TYLER DISTRICT. :::: PROJECT DESCRIPTION: VARIOUS LOCATIONS IN THE TYLER DISTRICT INCLUDING SH 323, FM 13, SH 135, FM 2493, FM 2607, FM 47, SH 64, FM 16, FM 773, FM 859, FM 2010, US 69, FM 1647, FM 2455, SH 154, US 80, FM 312, FM 346, FM 2022, FM 323, FM 2419, US 84, SL 456, SH 300, FM 2275, SS 502, FM 3506, US 175, FM 314, FM 1798, FM 3328, FM 1817, FM 2420, FM 2962, FM 2087, FM 2205, FM 1615, FM 0838, FM 2276, FM 2420, FM 2016,FM 757, IH 20 SR, FM 3311, SH 57, FM 90, FM 17; FY 2026 DISTRICT-WIDE THERMO PROGRAM 1.
$2,274,254
PROJECT TITLE: SEAL COAT ON UA 90, SH 95, SH 111, SH 119, FM 529, FM 1300, FM 616, FM 957, FM 1116, FM 240, FM 2031, FM 108, FM 443, FM 521, FM 952, FM 961, FM 1157. :::: PROJECT DESCRIPTION: UA 90 FROM 306 FEET WEST OF THIRD STREET TO FM 3013; SH 95 FROM .189 MILES SOUTH FM 1115 TO BROWN ROAD; SH 95 FROM BROWN ROAD TO .911 MILES SOUTH OF FM 154; SH 111 FROM JACKSON COUNTY LINE TO SH 71; SH 119 FROM FIRST STREET TO GOLIAD COUNTY LINE; SH 119 FROM 0.3 MILES NORTH OF FM 108 TO 12TH STREET; FM 529 FROM SH 159 TO FM 331 SOUTH; FM 1300 FROM FM 530 TO WHARTON COUNTY LINE; UA 90 FROM LAVACA COUNTY LINE TO SH 71; UA 90 FROM SH 71 TO 306 FEET WEST OF THIRD STREET; FM 616 FROM JACKSON COUNTY LINE TO FM 1862; FM 957 FROM FAYETTE COUNTY LINE TO FM 532; FM 1116 FROM SH 97 TO US 87; FM 240 FROM FM 238 TO NINTH ST; FM 2031 FROM SH 60 TO END OF STATE MAINTENANCE; FM 108 FROM SH 97 TO US 87; FM 443 FROM GONZALES COUNTY LINE TO SH 111; FM 521 FROM 1.93 MILES EAST OF FM 1468 TO COLORADO RIVER BRIDGE; FM 521 FROM FM 457 TO BRAZORIA COUNTY LINE; FM 952 FROM FM 2656 TO SH 72; FM 240 FROM 0.65 MILES SOUTH OF US 87 TO FM 238; FM 961 FROM SH 71 TO 1.50 MILES EAST OF FM 960; FM 1157 FROM SH 172 TO SH 111; FM 1862 FROM MATAGORDA COUNTY LINE TO SH 35; FM 952 FROM END OF STATE MAINTENANCE TO FM 2656; FM 2429 FROM SH 36 TO FM 949; FM 954 FROM SH 237 TO SH 159; FM 529 FROM FM 331 SOUTH TO WALLER COUNTY LINE; SEAL COAT.
$2,266,363
PROJECT TITLE: PREVENTIVE MAINTENANCE ON IH 2. :::: PROJECT DESCRIPTION: IH 2 FROM FM 493 TO FM 1015. OVERLAY.
$2,225,972
PROJECT TITLE: REHABILITATE EXISTING ROADWAY ON US 90. :::: PROJECT DESCRIPTION: US 90 FROM 0.38 MILES EAST OF FM 365 TO 4.08 MILES EAST (EASTBOUND). US 90 (0.38 MILES EAST OF FM 365 TO 4.08 MILES EAST)(EASTBOUND) FULL DEPTH CONCRETE REPAIR/FULL DEPTH BASE REPAIR/SC, 1 'CAM, 1' TOM. REHABILITATE EXISTING ROADWAY.
$2,223,782
PROJECT TITLE: PREVENTIVE MAINTENANCE AT VARIOUS LOCATIONS DISTRICTWIDE. :::: PROJECT DESCRIPTION: VARIOUS LOCATIONS DISTRICTWIDE ON SH 97, FM 3175, SH 16, FM 1518, FM 3432, FM 1346, FM 1516, FM 1101, IH 35, SH 173, FM 465, FM 1150, FM 725, US 281, RM 479, SH 27, RM 783, FM 3445, FM 1343, US 83, FM 1796, RM 2690, AND US 181; FINAL THERMOPLASTIC STRIPING FOR FY 2026 SAFETY CONSTRUCTION PROGRAM.
$2,140,033
PROJECT TITLE: RESURFACE ROADWAY ON FM 78 :::: PROJECT DESCRIPTION: FM 78 FROM IH 410 TO SL 1604; BASE REPAIR, MILL, INLAY & PAVEMENT MARKINGS
$2,123,660
PROJECT TITLE: WIDEN ROAD. ADD LANES AND SHOULDERS ON SH 115. :::: PROJECT DESCRIPTION: SH 115 FROM FM 874 TO 3 MILES SOUTH OF ANDREWS COUNTY LINE. ROADWAY WIDENING TO A SUPER 2.
$2,111,463
INSTALL INTELLIGENT TRANSPORTATION SYSTEMS EQUIPMENT AND INFRASTRUCTURE ON US 90
$2,108,403
PROJECT TITLE: INTERSECTION IMPROVEMENTS WITH RIGHT AND LEFT TURN LANES ON US 69. :::: PROJECT DESCRIPTION: US 69 FROM 0.10 MILES NORTH OF THE I-20 NORTH FRONTAGE ROAD PAVEMENT JOINT TO 0.12 MILES SOUTH OF THE I-20 SOUTH FRONTAGE ROAD MEDIAN CROSSOVER; 3 INCH MILL AND INLAY, INSTALL RIGHT TURN LANE, AND CONSTRUCT PEDESTRIAN FACILITIES.
$2,073,063
PROJECT TITLE: HIGHWAY IMPROVEMENT ON US 83. :::: PROJECT DESCRIPTION: US 83 FROM FM 1038, SOUTH TO KING COUNTY LINE; COTTLE COUNTY LINE, SOUTH TO 4TH STREET; US 82 OVERPASS, SOUTH TO STONEWALL COUNTY LINE; SUPER 2 HIGHWAY.
$2,057,165
PROJECT TITLE: REMOVE AND REPLACE BRIDGE RAIL DISTRICTWIDE ON SH 16, SH 44, AND US 59. :::: PROJECT DESCRIPTION: MULTIPLE LOCATIONS DISTRICTWIDE ON SH 16, SH 44, AND US 59; FOR THE CONSTRUCTION OF REMOVAL AND REPLACEMENT OF BRIDGE PROTECTION CONSISTING OF UPGRADING STRUCTURE BRIDGE RAIL, METAL BEAM GUARD FENCE AND END TREATMENTS.
$2,048,418
PROJECT TITLE: TRAFFIC MANAGEMENT CENTER UPGRADE AT VARIOUS LOCATION TO INCLUDE ALPS DRIVE, AURURA AVENUE, ELLERTHORPE AVENUE, FILLMORE AVENUE, HUEDO AVENUE. :::: PROJECT DESCRIPTION: VARIOUS LOCATION IN THE CITY OF EL PASO CITY TO INCLUDE ALPS DRIVE, AURURA AVENUE, ELLERTHORPE AVENUE, FILLMORE AVENUE, HUEDO AVENUE. TRAFFIC MANAGEMENT CENTER UPGRADE PHASE 4: THE PROJECT INCLUDED THE UPGRADE OF THE CITY OF EL PASO TRAFFIC MANAGEMENT CENTER AND TRAFFIC SIGNAL CONTROLLER EQUIPMENT CITYWIDE. PHASE 1 IS THE DESIGN PHASE. PHASE 2-5 ARE IMPLEMENTATION AND CONSTRUCTION PHASES.
$1,992,757
PROJECT TITLE: REHABILITATE EXISTING ROADWAY ON US 84 :::: PROJECT DESCRIPTION: US 84 FROM SL 396 TO BUSINESS 77; REHABILITATE EXISTING ROADWAY OVERLAY
$1,983,247
PROJECT TITLE: INSTALL ILLUMINATION ON STATE LOOP 12. :::: PROJECT DESCRIPTION: STATE LOOP 12 FROM IH 45, US 175 TO PEMBERTON HILL ROAD. SAFETY LIGHTING.
$1,954,887
PROJECT TITLE: FM 1974 AT CLEAR FORK OF THE BRAZOS RIVER. REPLACE BRIDGE AND APPROACHES. :::: PROJECT DESCRIPTION: FM 1974 AT CLEAR FORK OF THE BRAZOS RIVER. REPLACE BRIDGE AND APPROACHES.
$1,954,452
PROJECT TITLE: PREVENTIVE MAINTENANCE ON VARIOUS. :::: PROJECT DESCRIPTION: VARIOUS LOCATIONS DISTRICTWIDE TO INCLUDE FM 1283, RM 187, FM 462, SH46, FM 3009, FM 20, FM 3350 AND SH 27; THERMOPLASTIC STRIPING.
$1,946,110
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY ON US 287 :::: PROJECT DESCRIPTION: US 287 FROM FM 281 TO THE SHERMAN COUNTY LINE; CONTINUOUS ILLUMINATION AND INTERSECTION IMPROVEMENTS.
$1,944,694
PROJECT TITLE: SEAL COAT ON US 87. :::: PROJECT DESCRIPTION: US 87 FROM RANCH TO MARKET 1723 TO DIVIDED SECTION; FULL-DEPTH RECLAMATION, LEVEL UP AND SEAL COAT.
$1,920,356
PROJECT TITLE: TRAFFIC SIGNAL IMPROVEMENTS ON IH 30 AND SH 190. :::: PROJECT DESCRIPTION: IH 30 AT COCKRELL HILL AND SH 190 AT FRANKFORD ROAD AND COIT; IMPROVE TRAFFIC SIGNAL.
$1,880,435
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY ON BOSQUE. :::: PROJECT DESCRIPTION: BOSQUE FROM 0.1 MILE SOUTH OF WOODED ACRES TO 0.1 MILE NORTH OF 34TH STREET. IMPROVE TRAFFIC SIGNALS, IMPROVE PEDESTRIAN SIGNALS, INSTALL FLASHING YELLOW ARROW.
$1,872,956
PROJECT TITLE: PREVENTIVE MAINTENANCE AT VARIOUS LOCATIONS INCLUDING FM 76, FM 110, FM 2185, FM2809, RM 2775. :::: PROJECT DESCRIPTION: FY 2026 STRIPING AT VARIOUS LOCATIONS INCLUDING FM 76, FM 110, FM 2185, FM2809, RM 2775, SH 20, SS 6, US 67, US 90, BU 54A, FM 76, FM 659, PA 2401, SH 20, SS 16, US 90, SL 375, IH 10.
$1,869,098
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY ON US 290. :::: PROJECT DESCRIPTION: US 290 FROM WASHINGTON COUNTY LINE TO HARRIS COUNTY LINE; FROM WALLER COUNTY LINE TO FIELDS STORE ROAD. INSTALL MEDIAN BARRIER.
$1,822,753
PROJECT TITLE: CONSTRUCT BRIDGE ON US 87. :::: PROJECT DESCRIPTION: US 87 FROM 0.75 MILES NORTH OF FM 41 TO 0.75 MILES SOUTH OF FM 41. NEW INTERCHANGE.
$1,815,019
PROJECT TITLE: SURFACING AND ROADWAY RESTORATION ON SH 123 :::: PROJECT DESCRIPTION: SH 123 FROM GUADALUPE AND WILSON COUNTY LINE TO BS 87; REHABILITATE EXISTING ROADWAY
$1,804,898
PROJECT TITLE: INTERSECTION IMPROVEMENT ON US 87. :::: PROJECT DESCRIPTION: US 87 FROM FM 2105 TO 0.34 MILES SOUTH OF FM 2105; INTERSECTION AND OPERATIONAL IMPROVEMENTS INCLUDING INSTALLING TRAFFIC SIGNALS.
$1,792,975
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY ON BI 40-D :::: PROJECT DESCRIPTION: BI 40-D FROM IH 40 TO SL 279; HAZARD ELIMINATION AND SAFETY; INSTALL LEFT TURN LANES AND SAFETY TREAT FIXED OBJECTS AND INSTALL CABLE BARRIER AND CONTINUOUS LIGHTING.
$1,755,652
PROJECT TITLE: REHABILITATE EXISTING ROADWAY ON SH 78. :::: PROJECT DESCRIPTION: SH 78 FROM 150' SOUTH OF FM 273 TO OKLAHOMA STATE LINE. FULL DEPTH RECLAMATION WITH OVERLAY.
$1,741,287
PROJECT TITLE: HAZARD ELIMINATION & SAFETY ON IH 37. :::: PROJECT DESCRIPTION: INCREASE SUPERELEVATION AND CORRECT VERTICAL PROFILE OF ROADWAY; INSTALL CENTERLINE AND EDGELINE RUMBLE STRIPS ON IH 37 FROM 0.6 MI. N OF PULLIN RD TO 0.5 MI S OF COUGHRAN RD; IH 37 FROM CRANE RD. TO FM 3006.
$1,731,465
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY ON US 62. :::: PROJECT DESCRIPTION: US 62 FROM CR 319 TO WEST SEMINOLE CITY LIMITS; DECEL LANES.
$1,710,910
PROJECT TITLE: INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TURN LANES ON FM 1472. :::: PROJECT DESCRIPTION: FM 1472 FROM 2.46 MILES SOUTH OF SH 255 INTERSECTION TO 4.49 MILES SOUTH OF SH 255 INTERSECTION. CONSTRUCTION OF NEW RIGHT TURN LANES AT PINTO VALLE, AND LEFT TURN LANES AT EXISTING CROSSOVER.
$1,681,585
PROJECT TITLE: REPAIR ROADWAY ON US 75. :::: PROJECT DESCRIPTION: US 75 FROM DALLAS COUNTY LINE TO RIDGEVIEW ROAD; BRIDGE DEFICIENCY REPAIRS.
$1,671,762
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY ON PLEASANTON ROAD, GOLIAD ROAD, AND HUEBNER ROAD :::: PROJECT DESCRIPTION: PLEASANTON ROAD AT HARDING BOULEVARD, GOLIAD ROAD AT CLARK AVENUE AND AT PECAN VALLEY, HUEBNER ROAD AT HUEBNER ES; HAZARD ELIMINATION AND SAFETY; IMPROVE TRAFFIC SIGNALS, REPLACE SPAN WIRE SIGNAL WITH MAST ARM AND UPGRADE DETECTION
$1,659,573
PROJECT TITLE: BRIDGE REPLACEMENT ON SH 35. :::: PROJECT DESCRIPTION: SH 35 AT CARANCAHUA BAY. REPLACE BRIDGE AND APPROACHES INCLUDING WIDEN PAVEMENT, REALIGN OF ROADWAY, PLACEMENT OF ASPHALT CONCRETE PAVEMENT, UPGRADE TO STANDARD, PROPOSED DRAINAGE MODIFICATIONS, AND EXPAND PORT ECONOMY ACCESSIBILITY.
$1,637,801
PROJECT TITLE: BRIDGE REPLACEMENT ON EAST FRANKFORD ROAD. :::: PROJECT DESCRIPTION: EAST FRANKFORD ROAD WESTBOUND AT FURNEAUX CREEK; REPLACE BRIDGE AND APPROACHES.
$1,610,112
PROJECT TITLE: CONSTRUCTION OF SHARED USE PEDESTRIAN AND BICYCLE FACILITY ON CITY STREET O.T. SMITH ROAD. :::: PROJECT DESCRIPTION: ON CITY STREET O.T. SMITH ROAD AND SH 20, ALAMEDA AVENUE, TO IH 10. CONSTRUCTION OF SHARED USE PEDESTRIAN AND BICYCLE FACILITY.
$1,604,982
PROJECT TITLE: WIDEN ROAD AND ADD LANES ON UA 90. :::: PROJECT DESCRIPTION: UA 90 FROM FM 359 TO WEST OF SH 99; RECONSTRUCT AND WIDEN FROM 4 TO 6 LANE DIVIDED; PHASE 2 OF 3.
$1,562,752
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY ON SH 20. :::: PROJECT DESCRIPTION: SH 20 FROM IH 10 TO SUNLAND PARK; HAZARD ELIMINATION & SAFETY.
$1,507,573
PROJECT TITLE: BICYCLE AND PEDESTRIAN IMPROVEMENTS; 1.21 MILES ON BU 67H FROM SOUTH MILTON STREET TO SOUTH KOENIGHEIM STREET. :::: PROJECT DESCRIPTION: 1.21 MILES ON BU 67H FROM SOUTH MILTON STREET TO SOUTH KOENIGHEIM STREET; ADA CURB RAMPS AND SIDEWALKS REMEDIATION PROJECT FY2026.
$1,506,221
PROJECT TITLE: IMPROVE TRAFFIC SIGNAL, INSTALL SIDEWALKS AT VARIOUS LOCATIONS IN CITY OF DALLAS TO INCLUDE WEBB CHAPEL, AUDELIA ROAD, COMMERCE STREET, LAKE JUNE ROAD :::: PROJECT DESCRIPTION: CITY STREETS AT WEBB CHAPEL EXIT AND LARGA DRIVE; AT ILLINOIS AVENUE AND DUNCANVILLE ROAD; AT WHEATLAND ROAD AND BOLTON BOONE DR; AT LAKE JUNE ROAD AND HOLCOMB ROAD; AT COMMERCE STREET AND GRIFFIN STREET; AND AT AUDELIA ROAD AND ROYAL LANE. TRAFFIC SIGNAL IMPROVEMENTS.
$1,492,656
PROJECT TITLE: BRIDGE REPLACEMENT ON FM 46. :::: PROJECT DESCRIPTION: FM 46 AT CEDAR CREEK. REPLACE BRIDGE AND APPROACHES.
$1,461,681
PROJECT TITLE: CONSTRUCT PEDESTRIAN INFRASTRUCTURE; DRIPPING MIDDLE SCHOOL TO ROGER HANDKS PARKWAY AND BROKEN LANCE ROAD. :::: PROJECT DESCRIPTION: FROM DRIPPING SPRINGS MIDDLE SCHOOL TO ROGER HANKS PARKWAY AND BROKEN LANCE ROAD. CONSTRUCT PEDESTRIAN INFRASTRUCTURE; CONSTRUCT SIDEWALKS AND SHARED USE PATH.
$1,430,592
PROJECT TITLE: SEAL COAT ON US 87 :::: PROJECT DESCRIPTION: ON US 87 FROM KRAUSE ROAD TO US 377. FULL DEPTH REPAIR, LEVEL UP AND SEAL COAT.
$1,420,739
PROJECT TITLE: LANDSCAPE DEVELOPMENT AT VARIOUS LOCATIONS. :::: PROJECT DESCRIPTION: VARIOUS LOCATIONS WILLIAMSON COUNTY TO IH 35, FM 972; US 79; SH 95. FISCAL YEAR 2026 GTAO GREEN RIBBON.
$1,400,359
PROJECT TITLE: INTERSECTION AND OPERATIONAL IMPROVEMENT ON SH 180 :::: PROJECT DESCRIPTION: SH 180 AT JEFFERSON STREET. INTERSECTION IMPROVEMENT, CONSTRUCT ROUNDABOUT.
$1,397,325
PROJECT TITLE: LANDSCAPE DEVELOPMENT ON US 54. :::: PROJECT DESCRIPTION: US 54 FROM KENWORTHY TO FM 2529 MCCOMBS; LANDSCAPE, GREEN RIBBON.
$1,394,215
PROJECT TITLE: RESURFACE ROADWAY ON SH 114. :::: PROJECT DESCRIPTION: SH 114 FROM FM 2178 NORTH TO AVENUE C; PAVEMENT REPAIR AND OVERLAY.
$1,337,446
PROJECT TITLE: INSTALL ILLUMINATION ON STATE LOOP 12. :::: PROJECT DESCRIPTION: STATE LOOP 12 FROM IH 45, US 175 TO PEMBERTON HILL ROAD. SAFETY LIGHTING.
$1,318,983
PROJECT TITLE: CONSTRUCT RAMPS ON IH 20. :::: PROJECT DESCRIPTION: IH 20 FROM FM 1884 TO SH 171; CONSTRUCT NEW RAMPS AND AUXILIARY LANES AT BETHEL ROAD.
$1,318,200
PROJECT TITLE: RESURFACE ROADWAY ON FM 926, SL 132, AND FM 210. :::: PROJECT DESCRIPTION: SL 132 FROM SH 114 TO SH 79; FM 210 FROM SL 132 TO SH 79; FM 926 FROM NEAR PEVELER CREEK TO SH 251; FM 926 FROM SH 251 TO US 380. PAVEMENT REPAIR AND OVERLAY.
$1,307,536
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY ON FM 491. :::: PROJECT DESCRIPTION: FM 491 FROM 0.77 MILES NORTH OF FM 2629 TO WEST UNCLE PETER'S ROAD; CONSTRUCT PAVED SHOULDERS.
$1,290,649
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY ON US 287. :::: PROJECT DESCRIPTION: US 287 1.4 MILES EAST OF FM 294 TO 3.6 MILES EAST OF FM 294; OPERATIONAL IMPROVEMENTS AT PARKING AREAS EAST OF GOODNIGHT.
$1,250,758
PROJECT TITLE: RIGHT OF WAY ON FM 2275 :::: PROJECT DESCRIPTION: FM 2275 FROM FM 3272 IN WHITE OAK EAST TO FM 1845 (PINE TREE RD) IN LONGVIEW RIGHT OF WAY
$1,220,792
CONSTRUCT PEDESTRIAN INFRASTRUCTURE IN VARIOUS AREAS AROUND THE EL PASO DISTRICT.
$1,212,696
PROJECT TITLE: HAZARD ELIMINATION AND SAFETY ON US 81. :::: PROJECT DESCRIPTION: US 81 FROM SOUTH OF CR 4228 TO TARRANT COUNTY LINE; INSTALL MEDIAN BARRIER.
$1,211,497
PROJECT TITLE: BRIDGE REPLACEMENT ON CR 101. :::: PROJECT DESCRIPTION: CR 101 FROM INDIAN CREEK TO 1.10 MILES SOUTH OF FM 883; REPLACE BRIDGE AND APPROACHES
$1,093,189
PROJECT TITLE: LANDSCAPE DEVELOPMENT FY26 DISTRICTWIDE ON IH 10, US 89, US 96, SS 380 AND SH 12. :::: PROJECT DESCRIPTION: VARIOUS LOCATIONS DISTRICTWIDE; FY 26 DISTRICTWIDE LANDSCAPING.
$1,065,538
PROJECT TITLE: SAFETY IMPROVEMENT PROJECTS ON IH 10 :::: PROJECT DESCRIPTION: IH 10 FROM 3.109 MILES EAST OF SH 20 TO 19.02 MILES EAST OF RM 1111. HAZARD ELIMINATION AND SAFETY.
$1,056,731
PROJECT TITLE: BRIDGE REPLACEMENT ON COUNTY ROAD 230. :::: PROJECT DESCRIPTION: COUNTY ROAD 230 FROM AA02-30 DRAW TO 0.5 MILES SOUTHEAST OF CR 237; REPLACE BRIDGE AND APPROACHES AT DRAW.
$1,009,370
PROJECT TITLE: SURFACING AND ROADWAY RESTORATION ON FM 563. :::: PROJECT DESCRIPTION: FM 563 FROM LIBERTY COUNTY LINE, SOUTH TO IH 10 WESTBOUND FRONTAGE ROAD; 1 INCH TYPE D LIMITED USE, 2 INCH TYPE C OVERLAY.
$1,000,000