TRANSPORTATION & DEVELOPMENT LOUISIANA D has received $519M across 35 federal grants of $1M or more on record.

Data as of July 24, 2026. Source: USAspending.gov, prime contract awards $1M+. Federal spending data lags and has known gaps. This is not a real-time or complete record.

Grants by agency

Where this recipient’s grant dollars come from.

All grant awards

Swipe to see description and amount →

AgencyDescriptionAmount
PROJECT TITLE: I-10; LA 415 TO ESSEN ON I-10 AND I-12 :::: PROJECT DESCRIPTION: REVISED SCOPE PER 1/12/2021 FROM A.MURRELL: INTERSTATE 10 (I-10) WILL BE IMPROVED THROUGH WIDENING AND RECONSTRUCTION OF THE MAINLINE FROM 3 TO 4 LANES IN EACH DIRECTION, INCLUDING BRIDGE REPLACEMENT AND REHABILITATION, INTERCHANGE AND RAMP MODIFICATION, SHOULDER WIDENING, AND AUXILIARY LANE(S) FROM LA 415 TO ESSEN LANE ON I-10 AND I-12. THE PROJECT CORRIDOR INCLUDES TWO PHASES. PHASE I INCLUDES THE LIMITS OF W. OF WASHINGTON ST. TO ESSEN LANE ON I-10 AND I-12, AND PHASE II INCLUDES THE LIMITS OF LA 415 TO W. OF WASHINGTON ST.
$169,705,869
PROJECT TITLE: I-10 / LOYOLA INTERCHANGE IMPROVEMENT :::: PROJECT DESCRIPTION: SCOPE: DESIGN-BUILD PROJECT TO CONSTRUCT NEW RAMPS, ADD ADDITIONAL AUX LANE TO INTERSTATE, WIDEN EXISTING STRUCTURES TO ACCOMMODATE THE I-10 WIDENING, AND MODIFY THE AT-GRADE RAMPS TO IMPROVE GEOMETRY FOR OPERATIONS.
$70,629,341
PROJECT TITLE: I-10 & I-12 COLLEGE DR FLYOVER RAMP :::: PROJECT DESCRIPTION: SCOPE: PROJECT CONSISTS OF CONSTRUCTING A NEW FLYOVER EXIT RAMP BEGINNING AT I-10 WB PAST ESSEN LANE TO COLLEGE DR. VEHICLES ON I-12 WB WILL BE REQUIRED TO EXIT IMMEDIATELY FOLLOWING THE EXISTING I-12 TO I-10 (NEW ORLEANS) FLYOVER RAMP IN ORDER TO EXIT AT COLLEGE DR. A BREAK IN THE COA AND AN EXIT ONLY AT TRUST DR IS ALSO AN OPTION.
$46,651,194
PROJECT TITLE: I-10; BEG LOG MILE 0.000 END LOG MILE 0.010; LA 415 TO ESSEN ON I-10 AND I-12 :::: PROJECT DESCRIPTION: STAGE 0 FEASIBILITY STUDY AND STAGE 1 ENVIRONMENTAL
$37,702,824
PROJECT TITLE: REPLACEMENT BRIDGE FOR TUNNEL BELLE CHASE :::: PROJECT DESCRIPTION: REPLACEMENT BRIDGE FOR TUNNEL BELLE CHASE
$29,491,227
PROJECT TITLE: I-220/1-20 INTERCHANGE IMP & BAFB ACCESS :::: PROJECT DESCRIPTION: SCOPE: THE PROJECT WILL CONSIST OF IMPROVING THE EXISTING I-220/I-20 INTERCHANGE TO INCORPORATE A NEW NORTH-SOUTH ACCESS FROM THE INTERCHANGE TO A NEW ENTRANCE INTO BARKSDALE AIR FORCE BASE. THE IMPROVEMENTS WOULD INCLUDE EXTENDING I- 220 (4-LANES) SOUTH, A DIRECT FLYOVER RAMP, A CLOVERLEAF RAMP, TWO ON/OFF RAMPS, AND A ROUNDABOUT INTERSECTION.
$23,741,013
PROJECT TITLE: I-10; LA 415 TO ESSEN ON I-10 AND I-12 :::: PROJECT DESCRIPTION: REVISED SCOPE PER 1/12/2021 FROM A.MURRELL: INTERSTATE 10 (I-10) WILL BE IMPROVED THROUGH WIDENING AND RECONSTRUCTION OF THE MAINLINE FROM 3 TO 4 LANES IN EACH DIRECTION, INCLUDING BRIDGE REPLACEMENT AND REHABILITATION, INTERCHANGE AND RAMP MODIFICATION, SHOULDER WIDENING, AND AUXILIARY LANE(S) FROM LA 415 TO ESSEN LANE ON I-10 AND I-12. THE PROJECT CORRIDOR INCLUDES TWO PHASES. PHASE I INCLUDES THE LIMITS OF W. OF WASHINGTON ST. TO ESSEN LANE ON I-10 AND I-12, AND PHASE II INCLUDES THE LIMITS OF LA 415 TO W. OF WASHINGTON ST.
$12,000,000
PROJECT TITLE: LA 146 BRIDGES NEAR KELLEYS :::: PROJECT DESCRIPTION: TOPSWTYPE: BRIDGE REPLACEMENT
$11,133,829
PROJECT TITLE: US 90: S. KENNER AVE - LA 18 :::: PROJECT DESCRIPTION: SCOPE: RESURFACING WITH ASPHALT CONCRETE MILL AND OVERLAY, ALONG US 90 FROM THE ST. CHARLES PARISH LINE GOING EAST TO THE NE END OF THE US 90B @ AVONDALE OVERPASS, STRUCTURE NUMBER 02260051005871. BRIDGE PORTION OF THE PROJECT WILL ONLY BE RESTRIPING. REVISED SCOPE (PER 6/16/2020 EMAIL FROM B.MAY): MILL, OVERLAY, INSTALL RAISED MEDIAN AND LEFT TURN LANES ALONG US 90 FROM THE ST. CHARLES PARISH LINE GOING EAST TO THE NE END OF THE US 90B @ AVONDALE OVERPASS, STRUCTURE NUMBER 02260051005871. BRIDGE PORTION OF THE PROJECT WILL ONLY BE RESTRIPING. REVISED SCOPE (PER 3/16/2021 EMAIL FROM B.MAY): INSTALL RAISED MEDIAN AND LEFT TURN LANES, ADD TRAVEL LANE AND STRIPING CHANGES AT US 90/US 90B INTERSECTION, MILL AND OVERLAY.
$10,384,875
PROJECT TITLE: LA 30 ROUNDABOUTS @ TANGER MALL & I-10 :::: PROJECT DESCRIPTION: SCOPE: 3 ROUNDABOUTS ON LA 30 INCLUDING 2 AT THE I-10 RAMPS. THE CITY OF GONZALES WILL PAY FOR PHASES 1,3, AND 5. DOTD WILL PURCHASE ROW AND THE CITY WILL REIMBURSE THAT COST.
$9,105,627
PROJECT TITLE: LA 82: LA 35 - LA 333 :::: PROJECT DESCRIPTION: LA 82: LA 35 - LA 333 SCOPE: STABILIZE BASE & OVERLAY REVISED SCOPE PER 10/1/2025 EMAIL FROM K.EAST: PATCH, MILL, STABILIZE BASE, & OVERLAY
$8,793,401
PROJECT TITLE: US 167: SOUTH OF DODSON - JACKSON P/L :::: PROJECT DESCRIPTION: MEDIUM OVERLAY
$8,783,992
PROJECT TITLE: GRADE RAISING ON VALLEY ST :::: PROJECT DESCRIPTION: REVISED SCOPE PER 4/17/2020 EMAIL FROM B.KENDRICK: RAISING AND WIDENING THE KCS RAILROAD BRIDGE LOCATED OVER ACADIAN THRUWAY BETWEEN PERKINS ROAD AND I-10 AND RAISING THE KCS RAILROAD BETWEEN I-10 AND COLLEGE DRIVE. THE KCS BRIDGE WILL BE REPLACED AT A MAXIMUM VERTICAL CLEARANCE OVER ACADIAN THRUWAY GIVEN THE STIPULATION THAT IT IS BACK TO EXISTING GRADE PRIOR TO THE INTERSECTION WITH VALLEY STREET.
$7,534,625
PROJECT TITLE: EARHART AT DAKIN :::: PROJECT DESCRIPTION: CONSTRUCT AN ON/OFF RAMP BETWEEN DAKIN STREET AND THE EARHART EXPRESSWAY.
$7,365,384
PROJECT TITLE: I-10 / LOYOLA INTERCHANGE IMPROVEMENT :::: PROJECT DESCRIPTION: SCOPE: DESIGN-BUILD PROJECT TO CONSTRUCT NEW RAMPS, ADD ADDITIONAL AUX LANE TO INTERSTATE, WIDEN EXISTING STRUCTURES TO ACCOMMODATE THE I-10 WIDENING, AND MODIFY THE AT-GRADE RAMPS TO IMPROVE GEOMETRY FOR OPERATIONS.
$7,000,000
PROJECT TITLE: WEIGH STATION ASSESSMENT SFY 2023 :::: PROJECT DESCRIPTION: SCOPE: PERFORM SITE REVIEW OF FACILITIES INCLUDED HEREIN TO EVALUATE WEIGH STATIONS WHICH CAN BE OPENED FOR IMMEDIATE STAFFING WITHOUT FURTHER ROADWAY, BUILDING OR TECHNOLOGY IMPROVEMENTS WITH REPRESENTATIVES FROM LADOTD WEIGHT POLICE. ASSESSING SITES FOR FUTURE WEIGH STATIONS.
$6,727,049
PROJECT TITLE: LA 56: LA 58 - 560’ S OF LA 24 :::: PROJECT DESCRIPTION: SCOPE: MILL AND OVERLAY
$5,295,861
PECUE LANE/I-10 INTERCHANGE PHASE II
$4,523,078
PROJECT TITLE: LA 146 BRIDGES NEAR KELLEYS :::: PROJECT DESCRIPTION: TOPSWTYPE: BRIDGE REPLACEMENT
$4,251,888
PROJECT TITLE: EBR COMPUTERIZED TRAFFIC SIGNAL, PH VB :::: PROJECT DESCRIPTION: TOPSBEG: CHOCTAW AT CHIPPEWA STREET TOPSEND: S. CHOCTAW AT N. FLANNERY ROAD
$4,180,366
PROJECT TITLE: US 165-BUSINESS & LA 840-6: REPAIRS :::: PROJECT DESCRIPTION: PATCH, MILL AND OVERLAY ASPHALT PAVEMENT AND PATCH JCP
$3,752,414
PROJECT TITLE: INTER. IMP. ON LA92 @ LA733 & GALLET RD :::: PROJECT DESCRIPTION: SCOPE: SINGLE LANE ROUNDABOUT LA 92 @ LA 733; S-CURVE IMPROVEMENTS ON LA 92; GALLET ROAD REALIGNMENT
$3,423,543
PROJECT TITLE: LA 617: LA 34 - US 80 :::: PROJECT DESCRIPTION: PCCP PATCHING
$3,261,331
PROJECT TITLE: REPLACEMENT BRIDGE FOR TUNNEL BELLE CHASE :::: PROJECT DESCRIPTION: REPLACEMENT BRIDGE FOR TUNNEL BELLE CHASE
$3,000,000
PROJECT TITLE: I-20: VICKSBURG BRIDGE FINGER JT REPAIR :::: PROJECT DESCRIPTION: FINGER JOINT REPAIR
$2,830,780
PROJECT TITLE: US 90X: BROAD ST - FRUGE RD (PAMCO RD) :::: PROJECT DESCRIPTION: PCC PATCHING, JOINT REPAIR, CLEANING SEALING, GRINDING, OVERLAY
$2,530,698
PROJECT TITLE: PINE ST. & HARRISON/COLLIER BRIDGES :::: PROJECT DESCRIPTION: SCOPE: DISMANTLE AND DISPOSE OF EXISTING BRIDGE; CONSTRUCT NEW STRUCTURE TO THE NEW APPROXIMATE PRESENT ALIGNMENT.
$2,392,240
PROJECT TITLE: US 171: WEST DR - VERNON P/L :::: PROJECT DESCRIPTION: SCOPE: THIN OVERLAY
$2,143,597
PROJECT TITLE: US 90: GNO NO. 2 BRIDGE REPAIR :::: PROJECT DESCRIPTION: SCOPE: REPAIR PROJECT FOR VERTICAL TRUSS MEMBER REHABILITATION.
$2,111,216
PROJECT TITLE: E. MARTIAL AVE. OVER COULEE :::: PROJECT DESCRIPTION: SCOPE: DISMANTLE AND DISPOSE OF EXISTING BRIDGE; CONSTRUCT NEW STRUCTURE TO THE APPROXIMATE PRESENT ALIGNMENT.
$1,957,329
PROJECT TITLE: STATEWIDE - HYDROGRAPHIC SURVEY MONITORING OF EXISTING BRIDGES :::: PROJECT DESCRIPTION: STATEWIDE - HYDROGRAPHIC SURVEY MONITORING OF EXISTING BRIDGES
$1,741,634
PROJECT TITLE: I-49: LA 6 TO NATCHITOCHES P/L PM REPL :::: PROJECT DESCRIPTION: REFLECTORIZED RAISED PAVEMENT MARKINGS AND PLASTIC PAVEMENT STRIPING
$1,550,352
PROJECT TITLE: D62 SA ENHANCED PVMT MKGS - PH 1 :::: PROJECT DESCRIPTION: SCOPE: ENHANCED STRIPING (TAPE) AND RAISED PAVEMENT MARKINGS
$1,264,092
PROJECT TITLE: LA 452: DRAINAGE AT CALDWELL ST. :::: PROJECT DESCRIPTION: SCOPE: REPLACE EXISTING CROSS DRAIN AND STORM DRAIN PIPE TO REDUCE FLOODING OF ADJACENT PROPERTIES AND ROADWAY.
$1,098,412
PROJECT TITLE: LA 143: BAYOU D'ARBONNE BRIDGE :::: PROJECT DESCRIPTION: REPLACEMENT DUE TO EXTENT OF REQUIRED REHAB WORK AND CONDITION OF GIRDERS BASED ON NEW INSPECTION.
$1,034,543