TRANSPORTATION, MICHIGAN DEPARTMENT OF

Total received in grants · trailing 12 months
$211M
vs. GOVERNOR'S AUTHORIZED REPRESENTATIVE ($39.0B), largest tracked grant recipient
$2for every U.S. household÷ 131M U.S. households
In perspective
0.1%of all $162.9B in tracked grants
36separate grants, trailing 12 months

TRANSPORTATION, MICHIGAN DEPARTMENT OF has received $211M across 36 federal grants of $1M or more on record.

Data as of July 24, 2026. Source: USAspending.gov, prime contract awards $1M+. Federal spending data lags and has known gaps. This is not a real-time or complete record.

Grants by agency

Where this recipient’s grant dollars come from.

All grant awards

Swipe to see description and amount →

AgencyDescriptionAmount
PROJECT TITLE: I-94 E PELHAM TO EAST OF OAKWOOD :::: PROJECT DESCRIPTION: CONCRETE PAVEMENT REPAIRS ON I-94 FROM JUST WEST OF PELHAM TO JUST EAST OF PELHAM, RECONSTRUCTION ON I-94 FROM JUST EAST OF PELHAM TO EAST OF M-39, INLAY OF WB I-94 MAINLINE FROM EAST OF M-39 TO EAST OF OAKWOOD, RECONSTRUCTION AND PAVEMENT REPAIRS TO RAMPS WITHIN THE I-94/M-39 INTERCHANGE AND I-94/OAKWOOD INTERCHANGE VICINITY, AND OTHER MISCELLANEOUS WORK. PELHAM TO EAST OF OAKWOOD, CITY OF TAYLOR AND ALLEN PARK, WAYNE COUNTY
$44,762,446
PROJECT TITLE: US-24 GRAND RIVER TO N. OF 8 MILE ROAD :::: PROJECT DESCRIPTION: RECONSTRUCT GRAND RIVER TO N. OF 8 MILE ROAD, CITIES OF DETROIT AND SOUTHFIELD, WAYNE AND OAKLAND COUNTIES
$34,473,022
PROJECT TITLE: OLD-14 NEWBURGH ROAD TO MARKET STREET :::: PROJECT DESCRIPTION: RECONSTRUCT NEWBURGH ROAD TO MARKET STREET
$14,636,009
PROJECT TITLE: M-55 OVER MANISTEE RIVER :::: PROJECT DESCRIPTION: REMOVAL AND REPLACEMENT OF THE EXISTING BRIDGE, RECONSTRUCTION OF THE APPROACH ROADWAY AND MAINTAINING TRAFFIC.;B01 OF 51021: M-55 OVER MANISTEE RIVER, IN MANISTEE. 0.1 MI EAST OF US-31 ON M-55.; ,
$10,663,738
PROJECT TITLE: STATEWIDE STATEWIDE :::: PROJECT DESCRIPTION: STATEWIDE MAINTENANCE OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) DEVICES BEGINNING THE DATE THE PROJECT IS AUTHORIZED THROUGH OCTOBER 31, 2026. NEEDED FOR MAINTENANCE OF STATEWIDE ITS DEVICES. STATEWIDE
$9,453,757
PROJECT TITLE: US-12 US-12 FROM WEST OF PLATT RD TO WEST OF US-23 INTERCHANGE :::: PROJECT DESCRIPTION: ADD DUAL LEFTS ALONG SB PLATT ROAD TO EB US-12 (MICHIGAN AVENUE). ADD TURN LANE FOR NB PLATT ROAD TO WB TEXTILE ROAD. TO FACILITATE DUAL LEFTS AND IMPROVE OPERATIONS, ADD ONE LANE IN EACH DIRECTION ALONG US-12 (MICHIGAN AVENUE); CONSTRUCT NON-MOTORIZED PATH ON THE SOUTH SIDE OF US-12 US-12 FROM WEST OF PLATT RD TO WEST OF US-23 INTERCHANGE
$8,413,748
PROJECT TITLE: M-90 2 STRUCTURES IN CROSWELL :::: PROJECT DESCRIPTION: BRIDGE REPLACEMENT, CULVERT REPLACEMENT, BRIDGE APPROACH;M-90 OVER BLACK RIVER, 4.7 MILES WEST OF M-25 IN CROSWELLM-90 OVER MILLS CREEK, 5.0 MILES WEST OF M-25 IN CROSWELL; ,
$8,004,811
PROJECT TITLE: US-24 GRAND RIVER TO N. OF 8 MILE ROAD :::: PROJECT DESCRIPTION: RECONSTRUCT GRAND RIVER TO N. OF 8 MILE ROAD, CITIES OF DETROIT AND SOUTHFIELD, WAYNE AND OAKLAND COUNTIES
$8,000,000
PROJECT TITLE: OLD M-14 OVER THE MIDDLE ROUGE RIVER :::: PROJECT DESCRIPTION: BRIDGE REPLACEMENT B03 OF 82101 - OLD M-14 (ANN ARBOR RD) OVER THE MIDDLE ROUGE RIVER, IN LIVONIA
$6,772,172
PROJECT TITLE: WALDON RD WALDON RD FROM 1400' EAST OF CLINTONVILLE RD TO BALDWIN RD :::: PROJECT DESCRIPTION: PAVE GRAVEL ROAD AND ROUNDABOUT WALDON RD FROM CLINTONVILLE RD TO BALDWIN RD, AND INTERSECTION OF WALDON RD AT CLINTONVILLE RD.
$5,943,752
PROJECT TITLE: WALDON RD WALDON RD FROM 1400' EAST OF CLINTONVILLE RD TO BALDWIN RD :::: PROJECT DESCRIPTION: PAVE GRAVEL ROAD AND ROUNDABOUT WALDON RD FROM CLINTONVILLE RD TO BALDWIN RD, AND INTERSECTION OF WALDON RD AT CLINTONVILLE RD.
$5,554,201
PROJECT TITLE: M-90 2 STRUCTURES IN CROSWELL :::: PROJECT DESCRIPTION: BRIDGE REPLACEMENT, CULVERT REPLACEMENT, BRIDGE APPROACH;M-90 OVER BLACK RIVER, 4.7 MILES WEST OF M-25 IN CROSWELLM-90 OVER MILLS CREEK, 5.0 MILES WEST OF M-25 IN CROSWELL; ,
$5,015,463
PROJECT TITLE: KELLY RD KELLY ROAD FROM 14 MILE ROAD NORTH TO 15 MILE ROAD :::: PROJECT DESCRIPTION: ROAD RECONSTRUCTION KELLY ROAD FROM 14 MILE ROAD NORTH TO 15 MILE ROAD.
$4,661,163
PROJECT TITLE: US-41 FROM M-94 EAST JUNCTION TO KUNDE ROAD :::: PROJECT DESCRIPTION: HMA BASE CRUSHING AND SHAPING WITH HMA RESURFACING FROM APPROXIMATELY 1/4 MILE SOUTH OF M-94 EAST JUNCTION IN SKANDIA TOWNSHIP TO 1/4 MILE NORTH OF KUNDE ROAD IN CHOCOLAY TOWNSHIP, MARQUETTE COUNTY.
$4,326,969
PROJECT TITLE: MICHIKAL ST FROM OLIVER STREET TO KALAMAZOO AVENUE, CITY OF KALAMAZOO :::: PROJECT DESCRIPTION: COMPETITIVE GRANT IMPROVE STORMWATER MANAGEMENT THROUGHOUT THE ARCADIA CREEK CORRIDOR. STORMWATER INFRASTRUCTURE REPLACEMENT AND UPGRADE. ARCADIA CREEK FROM OLIVER STREET TO KALAMAZOO AVENUE, CITY OF KALAMAZOO
$4,162,043
PROJECT TITLE: I-75 I-75, MONROE COUNTY :::: PROJECT DESCRIPTION: FREEWAY SIGNING UPDATE I-75, MONROE COUNTY
$2,933,156
PROJECT TITLE: STATEWIDE STATEWIDE :::: PROJECT DESCRIPTION: TRAFFIC SIGNAL OPERATIONS WORK TASKS INCLUDING COMPLETING STUDIES AND MEMOS, EVALUATING AND CREATING SIGNAL TIMING PERMITS, ANALYZING AND OPTIMIZING TRAFFIC SIGNALS AND CORRIDORS, REVIEWING AND COMMENTING ON SIGNAL CONSTRUCTION PLANS AND TRAFFIC IMPACT STUDIES, CREATING LAYOUT REQUESTS DEFINING SCOPE OF SIGNAL WORK, SUPPORT AND IMPLEMENTATION OF ASSET MANAGEMENT SYSTEM AND CENTRAL SIGNAL CONTROL SYSTEM, UPDATING PROCEDURES, GUIDELINES, MANUAL, AND FORMS RELATED TO SIGNAL OPERATIONS AND MAINTENANCE. STATEWIDE
$2,835,600
PROJECT TITLE: SOUTHFIELD RD SOUTHFIELD RD, S/O MT VERNON ST TO LINCOLN DR :::: PROJECT DESCRIPTION: WIDEN FROM 5-LANE RD TO 6-LANE BLVD (THREE TRAVEL LANES IN EACH DIRECTION AND A 50-FOOT MEDIAN). SOUTHFIELD RD, SOUTH OF MT VERNON ST TO LINCOLN DR (SOUTHFIELD)
$2,800,000
PROJECT TITLE: M-66 FROM TUTTLE ROAD NORTH TO WELLS STREET :::: PROJECT DESCRIPTION: RECONSTRUCTION FROM 245' SOUTH OF TUTTLE ROAD NORTH TO 80' NORTH OF WELLS STREET, IN BERLIN AND IONIA TOWNSHIPS, CITY OF IONIA, IONIA COUNTY.
$2,595,464
PROJECT TITLE: M-89 FROM THE KALAMAZOO RIVER EAST TO US-131 :::: PROJECT DESCRIPTION: MILLING AND ONE COURSE ASPHALT OVERLAY WITH DETAIL 7/8 PAVEMENT REPAIRS FROM THE KALAMAZOO RIVER EAST TO US-131 IN THE CITY OF OTSEGO, OTSEGO AND GUN PLAIN TOWNSHIPS IN ALLEGAN COUNTY.
$2,171,462
PROJECT TITLE: US-12 US-12 FROM WEST OF PLATT RD TO WEST OF US-23 INTERCHANGE :::: PROJECT DESCRIPTION: ADD DUAL LEFTS ALONG SB PLATT ROAD TO EB US-12 (MICHIGAN AVENUE). ADD TURN LANE FOR NB PLATT ROAD TO WB TEXTILE ROAD. TO FACILITATE DUAL LEFTS AND IMPROVE OPERATIONS, ADD ONE LANE IN EACH DIRECTION ALONG US-12 (MICHIGAN AVENUE); CONSTRUCT NON-MOTORIZED PATH ON THE SOUTH SIDE OF US-12 US-12 FROM WEST OF PLATT RD TO WEST OF US-23 INTERCHANGE
$2,032,266
PROJECT TITLE: TSC-WIDE VARIOUS IN LANSING TSC AREA :::: PROJECT DESCRIPTION: MODERNIZE SIGNALS TO CURRENT STANDARDS 3 LOCATIONS: M-43 (GRAND RIVER) @ PUTNAM; I-496 EB OFF RAMP @ CREYTS; M-100 (BRIDGE) @ M-100 (JEFFERSON)
$2,000,220
PROJECT TITLE: M-153 FRAINS LAKE TO NAPIER ROAD (WASHTENAW/WAYNE COUNTY LINE) :::: PROJECT DESCRIPTION: SINGLE COURSE MILL & RESURFACE FRAINS LAKE TO NAPIER ROAD (WASHTENAW/WAYNE COUNTY LINE)
$1,921,893
PROJECT TITLE: OLD 27 N LANSING RD (OLD 27) FROM CREYTS RD TO I-496 RAMPS :::: PROJECT DESCRIPTION: SINGLE COURSE CHIP SEAL WITH CONCRETE PAVEMENT REPAIRS LANSING RD (OLD 27) FROM CREYTS RD TO I-496 RAMPS
$1,823,497
PROJECT TITLE: US-24 GRAND RIVER TO N. OF 8 MILE ROAD :::: PROJECT DESCRIPTION: RECONSTRUCT GRAND RIVER TO N. OF 8 MILE ROAD, CITIES OF DETROIT AND SOUTHFIELD, WAYNE AND OAKLAND COUNTIES
$1,729,975
PROJECT TITLE: OLD 14 OLD 14 (ANN ARBOR RD) AT THE CSX-RR STATION ID #103 :::: PROJECT DESCRIPTION: PUMP STATION REHABILITATION OLD 14 (ANN ARBOR RD) AT THE CSX-RR STATION ID #103
$1,651,353
PROJECT TITLE: AURELIUS RD 900FT SOUTH OF WILCOX RD TO CEDAR ST :::: PROJECT DESCRIPTION: COLD MILLING AND TWO-LIFT HMA OVERLAY, INCLUDING STORM SEWER CONSTRUCTION AURELIUS STREET-900FT SOUTH OF WILCOX RD TO CEDAR ST
$1,572,820
PROJECT TITLE: US-2 FROM BREVORT LAKE ROAD TO MARTIN LAKE ROAD :::: PROJECT DESCRIPTION: PAVER PLACED SURFACE SEAL AND JOINT REPAIRS FROM 3000' EAST OF BREVORT LAKE ROAD TO 400' WEST OF MARTIN LAKE ROAD
$1,299,612
PROJECT TITLE: M-14 14 STRUCTURES ON M-14 FROM SHELDON TO NEWBURGH :::: PROJECT DESCRIPTION: STR 11354: EPOXY OVERLAY, DECK PATCHING, FULL DEPTH PATCHING, RESEAL JOINTS, BEAM END REPAIR/CUT BEAM ENDS, ROCKER REPAIR, CRACK SEAL ABUTMENTS, APPROACH WORKSTR 11359: CROWN CORRECTION, REPLACE JOINT GLAND, RAILING PATCHING WITH CSC, FULL DEPTH PATCHING, SUBSTRUCTURE PATCHING, CRACK SEALSTR 12665: MINOR BARRIER PATCHING, PARTIAL RAILING REPLACE OVER BOTH P&H IN SPAN 3 WEST FASCIA, SUBSTRUCTURE PATCHING, CRACK SEAL AND SEAL ENTIRE SURFACE, SLOPE PAVING REPAIR, RESEAL JOINTS OVER ABUTMENTSSTR 12666: EPOXY OVERLAY, DECK PATCHING, REPLACE JOINT GLAND OVER ABUTMENTS, BARRIER PATCHING, SUBSTRUCTURE PATCHING, CRACK SEAL AND SEAL ENTIRE SURFACESTR 11361: CROWN CORRECTION, JOINT REPLACEMENT, HPR GLAND REPLACEMENT, FULL DEPTH PATCHING, ROCKER BEARING REALIGNMENT, SUBSTRUCTURE PATCHING, SLOPE PAVING REPAIRS, APPROACH SHOULDER REPAIRS. POTENTIAL PRJ CANDIDATESTR 11362: EPOXY OVERLAY, RAILING REPAIRS, REPLACE JOINT GLAND OVER ABUTMENTS, FULL DEPTH PATCHING, PARTIAL RAILING REPLACEMENT, BEAM END REPAIR/CUT BEAM ENDS, SUBSTRUCTURE PATCHING, CRACK SEAL AND SEAL ENTIRE SURFACE, SLOPE PAVING REPAIRS, APPROACH WORKSTR 11363: EPOXY OVERLAY, JOINT GLAND REPLACEMENT, SLOPE PROTECTION REPAIRS AND APPROACH WORKSTR 11365: CROWN CORRECTION, BARRIER PATCHING WITH CSC, FULL DEPTH PATCHING, SUBSTRUCTURE PATCHING, SLOPE PAVING REPAIRSSTR 11366: CRACK SEAL SUBSTRUCTURE ELEMENTS AND APPLY CSCSTR 11487: HIGH LOAD HIT REPAIR, REPLACE MISSING/SHEARED BOLTS IN CROSS FRAME AT BAY 1E IN N SPAN, DRAIN CLEANING, SEAL ABUTMENTS. SUBSTRUCTURE PATCHING, HEALER SEALERSTR 11488: PRF FILLER REPLACEMENT, HEALER SEALER, APPROACH REPAIR AROUND MANHOLE, CRACK SEAL IN ABUTMENTSSTR 11529: APPROACH FENCE REPAIRS, EPOXY OVERLAY, DECK PATCHING, FULL DEPTH PATCHINGSTR 11350: EPOXY OVERLAY, DECK PATCHING, FULL DEPTH PATCHING, RESEAL JOINTSSTR 11351: RESEAL JOINTS, CRACK SEAL, APPROACH WORK, SUBSTRUCTURE PATCHING STR 11354, 82102-S01: HAGGERTY ROAD OVER M-14STR 11359, 82102-S06: M-14 WB OVER SHELDON ROADSTR 12665, 82102
$1,257,350
PROJECT TITLE: US-12 US-12 FROM WEST OF PLATT RD TO WEST OF US-23 INTERCHANGE :::: PROJECT DESCRIPTION: ADD DUAL LEFTS ALONG SB PLATT ROAD TO EB US-12 (MICHIGAN AVENUE). ADD TURN LANE FOR NB PLATT ROAD TO WB TEXTILE ROAD. TO FACILITATE DUAL LEFTS AND IMPROVE OPERATIONS, ADD ONE LANE IN EACH DIRECTION ALONG US-12 (MICHIGAN AVENUE); CONSTRUCT NON-MOTORIZED PATH ON THE SOUTH SIDE OF US-12 US-12 FROM WEST OF PLATT RD TO WEST OF US-23 INTERCHANGE
$1,156,829
PROJECT TITLE: COLFAX AVE MARKET STREET TO MAIN STREET (I-94 BL) :::: PROJECT DESCRIPTION: RECONSTRUCTION OF THE ROADWAY, REPLACEMENT OF WATER MAIN, SANITARYSEWER, AND STORM SEWER, AND ADA SIDEWALK UPGRADES. COLFAX AVENUE FROM MARKET STREET TO MAIN STREET (I-94 BL)
$1,111,231
PROJECT TITLE: N DIXBORO RD PONTIAC TRAIL AT DIXBORO ROAD :::: PROJECT DESCRIPTION: CONSTRUCTION OF A ROUNDABOUT AT PONTIAC TRAIL AND DIXBORO ROAD INTERSECTION, PLUS MILL & FILL DIXBORO ROAD BETWEEN N. TERRITORIAL RD. AND PONTIAC TRAIL. PONTIAC TRAIL AT DIXBORO ROAD
$1,096,547
PROJECT TITLE: US-24 2 LOCATIONS ON US-24 AND M-125 :::: PROJECT DESCRIPTION: TRAFFIC SIGNAL MODERNIZATIONS TO CURRENT STANDARDS 2 LOCATIONS ON US-24 AND M-125: US-24 AT LORAIN; M-125 AT NOBLE
$1,042,101
PROJECT TITLE: M-6 / HOLSTEGE M-6 / HOLSTEGE WETLAND MITIGATION SITE :::: PROJECT DESCRIPTION: WETLAND MITIGATION SITE ACCESS AND ADDITIONAL WETLAND RESTORATION. WORK WILL INCLUDE: SITE GRADING, TILE DRAIN REMOVAL, TREE REMOVAL, CULVERT INSTALLATION, ACCESS ROAD CONSTRUCTION, WATER CONTROL STRUCTURE INSTALLATIONS, TREE PLANTING, AND SEEDING. M-6 / HOLSTEGE WETLAND MITIGATION SITE, T06N R10W SEC: 06, CASCADE TOWNSHIP, KENT COUNTY. ACQUISITION OF 1559 SPAULDING AVE SE, GRAND RAPIDS.
$1,037,662
PROJECT TITLE: VIRGINIA PARK FROM JOHN C. LODGE FREEWAY EAST TO END OF ROAD, CITY OF DETROIT :::: PROJECT DESCRIPTION: 0.4 MILES OF CURB-TO-CURB RECONSTRUCTION OF HISTORIC 30-FOOT-WIDE ROAD PROFILE USING HISTORICALLY APPROPRIATE STONE CURB AND BRICK ROADWAY USING A COMBINATION OF SALVAGED AND NEW BRICK. REPLACEMENT OF WORN CONCRETE SIDEWALK, DRIVEWAYS THAT FRONT THE STREET, UPDATE NONCOMPLIANT CROSSWALK RAMPS TO MEET ADA STANDARDS, RECONSTRUCT INSPECTED SEWER SEGMENTS REQUIRING REPLACEMENT, ADD AREAS OF NEW SHADE STREET TREES, MINIMAL UPGRADES TO EXISTING SITE FURNISHINGS THAT INCLUDE ENHANCING RECENTLY REPLACED HISTORIC LIGHT POLES TO INCLUDE HISTORICALLY-SENSITIVE LIGHT POLE BASES. A PLAQUE IN COMMEMORATION OF THE HISTORICAL EVENTS AT THIS LOCATION WILL BE INCLUDED. VIRGINIA PARK STREET FROM JOHN C. LODGE FREEWAY EAST TO THE END OF THE ROAD JUST WEST OF WOODWARD AVENUE, CITY OF DETROIT.
$1,010,555
PROJECT TITLE: M-37 FROM THE CALHOUN/BARRY COUNTY LINE NORTH TO GROAT ROAD :::: PROJECT DESCRIPTION: MILLING (2') AND ONE COURSE (1.5') ASPHALT OVERLAY. FROM THE CALHOUN/BARRY COUNTY LINE NORTH TO GROAT ROAD, IN JOHNSTOWN TOWNSHIP, BARRY COUNTY.
$1,000,110