TRANSPORTATION, VERMONT AGENCY OF

Total received in grants · trailing 12 months
$123M
vs. GOVERNOR'S AUTHORIZED REPRESENTATIVE ($39.2B), largest tracked grant recipient
$1for every U.S. household÷ 131M U.S. households
In perspective
0.0%of all $401.9B in tracked grants
26separate grants, trailing 12 months

TRANSPORTATION, VERMONT AGENCY OF has received $123M across 26 federal grants of $1M or more on record.

Data as of August 5, 2026. Source: USAspending.gov, prime contract awards $1M+. Federal spending data lags and has known gaps. This is not a real-time or complete record.

Grants by agency

Where this recipient’s grant dollars come from.

All grant awards

Swipe to see description and amount →

AgencyDescriptionAmount
APPLICATION PURPOSE: ******BUDGET REVISION #1****THIS IS A REQUEST TO CHANGE THE PERIOD OF PERFORMANCE END DATE TO 9/30/2027.THE VERMONT AGENCY OF TRANSPORTATION IS REQUESTING THE FOLLOWING SFY23 PROJECT USING FHWA CMAQ FUNDS FLEXED TO 5311 FOR ALL OF VERMONT- TOTAL $21445333 WITH $17333258 FEDERAL/ $983215 STATE/ $3128860 LOCAL. ATTACHED DOCUMENTATION FOR THE TRANSFER IS INCLUDED. MATCH FOR THESE FUNDS WILL COME FROM A COMBINATION OF THE T-FUND (STATE OF VERMONT) LOCAL MUNICIPALITIES AND INSTITUTIONS AND ELIGIBLE CONTRACTS. THE FUNDS BEING USED FOR THE SFY23 FLEX ARE AS FOLLOWS AND DETAILED IN THE POP. ; ACTIVITIES PERFORMED: PROJECT 1:* SPECIAL SERVICES ADMINISTRATION: $3721762/ $0 STATE/ $930441 LOCAL FOR - RURAL COMMUNITY TRANSPORTATION MARBLE VALLEY REGIONAL TRANSIT DISTRICT SOUTHEAST VERMONT TRANSIT TRI VALLEY TRANSIT VERMONT ASSOCIATION OF THE BLIND AND VISUALLY IMPAIRED GREEN MOUNTAIN COMMUNITY NETWORK* PREVENTATIVE MAINTENANCE: $3055500 FEDERAL/ $0 STATE/ $763875 LOCAL FOR - ADVANCE TRANSIT RURAL COMMUNITY TRANSPORTATION GREEN MOUNTAIN COMMUNITY NETWORK MARBLE VALLEY REGIONAL TRANSIT DISTRICT SOUTHEAST VERMONT TRANSIT TRI VALLEY TRANSIT GREEN MOUNTAIN TRANSIT RURAL* NON-VEHICLE CAPITAL: $2297378 FEDERAL/ $435487 STATE/ $136364 LOCAL FOR - ADVANCE TRANSIT RURAL COMMUNITY TRANSPORTATION GREEN MOUNTAIN COMMUNITY NETWORK MARBLE VALLEY REGIONAL TRANSIT DISTRICT SOUTHEAST VERMONT TRANSIT TRI VALLEY TRANSIT GREEN MOUNTAIN TRANSIT RURAL VPTA SFY 23-24 TECHNICAL ASSISTANCE (CONSUTING SERVICES) VEIC- VT BUS ELECTRIFICATION ASSISTANCE* VEHICLE CAPITAL: $1571363 FEDERAL/ $196420 STATE/ $196420 LOCAL FOR GREEN MOUNTAIN TRANSIT RURAL ADVANCE TRANSIT RURAL COMMUNITY TRANSPORTATION TRI VALLEY TRANSITPROJECT 2CMAQ FUNDS: $1712258 FEDERAL/ $309308 STATE/ $118756 LOCAL FOR - GREEN MOUNTAIN COMMUNITY NETWORK GREEN MOUNTAIN TRANSIT RURAL MARBLE VALLEY REGIONAL TRANSIT DISTRICT RURAL COMMUNITY TRANSPORTATION SOUTHEAST VERMONT TRANSIT TRI VALLEY TRANSITPROJECT 3CMAQ FUNDS: $2103925 FEDERAL/ $42000 STATE/ $483982 LOCAL FOR - ADVANCE TRANSIT RURAL COMMUNITY TRANSPORTATION GREEN MOUNTAIN COMMUNITY NETWORK SOUTHEAST VERMONT TRANSIT TRI VALLEY TRANSIT* PROGRAM ADMINISTRATION: $97760 FEDERAL/ $0 STATE/ $24440 LOCAL FOR- MARBLE VALLEY REGIONAL TRANSIT DISTRICT* STATE PROGRAM ADMINISTRATION: $875000 FEDERAL/ $0 STATE/ $0 LOCAL FOR VTRANS* SPECIAL SERVICES ADMINISTRATION: $1898315 FEDERAL / $0 STATE/ $474579 LOCAL FOR GREEN MOUNTAIN COMMUNITY NETWORK GREEN MOUNTAIN TRANSIT RURAL; EXPECTED OUTCOMES: VERMONT HAS A SPECIAL FOCUSED PROGRAM FOR EXTENSIVE SERVICE FOR THE ELDERLY AND THOSE WITH DISABILITIES (SEE ATTACHED POP FOR PROVIDERS AND AMOUNTS). THIS SPECIAL PROGRAM PROVIDES INCREASED ACCESS FOR THOSE 60 YEARS OR OLDER AND WITH DISABILITIES. CMAQ OPERATING PROVIDES THE NECESSARY FUNDING SUPPORT TO ASSIST THE TRANSIT PROVIDERS WITH ELIGIBLE OPERATING COSTS. PREVENTIVE MAINTENANCE ASSISTS 8 SUB-RECIPIENTS WITH ASSOCIATED CAPITAL MAINTENANCE INCLUDING EQUIPMENT TIRES TUBES AND MATERIAL PREVENTIVE MAINTENANCE OF ROLLING STOCK AND THEIR ASSOCIATED EQUIPMENT. THE PREVENTIVE MAINTENANCE INCLUDES ALL STANDARD ACTIVITIES SUPPLIES MATERIALS LABOR SERVICES AND ASSOCIATED COSTS REQUIRED TO PRESERVE OR EXTEND THE FUNCTIONALITY AND SERVICEABILITY OF THE ASSET IN A COST-EFFECTIVE MANNER UP TO AND INCLUDING THE CURRENT STATE OF THE ART FOR MAINTAINING ASSETS TO A STATE OF GOOD REPAIR. VTRANS HAS RESPONSIBILITY FOR APPROXIMATELY 335 VEHICLES AND WE REQUIRE THAT THEY BE KEPT TO MANUFACTURERS RECOMMENDED PREVENTIVE MAINTENANCE SCHEDULES. ADDITIONAL 11 VEHICLES WILL BE PURCHASED AS REPLACEMENTS AND EXPANSION VEHICLES; MORE DETAILS ARE PROVIDED IN THEIR RESPECTIVE BUDGET DESCRIPTIONS. THE CAPITAL REQUESTS ALLOW THE TRANSIT PROVIDERS TO MAINTAIN A STATE OF GOOD REPAIR WITH THEIR VEHICLES EQUIPMENT FACILITIES AND MAINTAIN SAFE AND RELIABLE TRANSPORTATION SERVICES.; INTENDED BENEFICIARIES: THIS GRANT REFLECTS EVERY TYPE OF SERVICE DELIVERED ACROSS THE STATE IN EVERY REGION EACH AND EVERY RESIDENT AND VISITOR TO VERMONT HAS THE CHANCE TO ACCESS GENERAL MOBILITY WHETHER ITS FOR RECREATION WORK MEDICAL SERVICE OR PERSONAL BUSINESS. THESE SERVICES ARE PROVIDED BY A RANGE OF METHODS FROM THE HIGHEST-LEVEL COMMUTER BUS TO GENERAL FIXED ROUTE TO DEMAND RESPONSE BUSES AND VOLUNTEERS IN THEIR OWN VEHICLES TRANSPORTING THEIR NEIGHBORS FRIENDS AND STRANGERS.; SUBRECIPIENT ACTIVITIES: VTRANS COMPETITIVELY SELECTED GREEN MOUNTAIN TRANSIT (RURAL) ADVANCE TRANSIT RURAL COMMUNITY TRANSPORTATION SOUTHEAST VERMONT TRANSIT TRI VALLEY TRANSIT GREEN MOUNTAIN COMMUNITY NETWORK MARBLE VALLEY REGIONAL TRANSIT DISTRICT VABVI AND VPTA. THIS APPLICATION WILL COVER THE SERVICE TYPES LISTED ABOVE. FOR FULL DESCRIPTIONS OF SUB-RECIPIENTS AND CONTACT INFORMATION SEE ATTACHED DESCRIPTION OF SERVICES WITH SOURCE OF LOCAL MATCH.
$17,333,258
APPLICATION PURPOSE: THIS IS A VTRANS REQUEST TO CHANGE THE PERIOD OF PERFORMANCE END DATE TO 9/30/2027; ACTIVITIES PERFORMED: THIS IS A VTRANS REQUEST TO CHANGE THE PERIOD OF PERFORMANCE END DATE TO 9/30/2026; EXPECTED OUTCOMES: N/A; INTENDED BENEFICIARIES: N/A; SUBRECIPIENT ACTIVITIES: N/A
$15,155,160
PROJECT TITLE: COLCHESTER, US2, AT THE INTERSECTIONS WITH I-89 EXIT #17 AND US7; PENG, IMPROVE INTERSECTIONS, REPLACE US2 BR18A. :::: PROJECT DESCRIPTION: COLCHESTER, US2, AT THE INTERSECTIONS WITH I-89 EXIT #17 AND US7; PENG, ROWA, CONST., IMPROVE INTERSECTIONS, REPLACE US2 BR18A.
$14,513,582
APPLICATION PURPOSE: THIS IS A VTRANS BUDGET REVISION TO CHANGE THE PERIOD OF PERFORMANCE END DATE TO 9/30/27.; ACTIVITIES PERFORMED: THIS IS A VTRANS BUDGET REVISION TO CHANGE THE PERIOD OF PERFORMANCE END DATE TO 9/30/26.; EXPECTED OUTCOMES: N/A; INTENDED BENEFICIARIES: N/A; SUBRECIPIENT ACTIVITIES: N/A
$10,788,925
PROJECT TITLE: SPRINGFIELD-HARTLAND, I-91, RESURFACING. :::: PROJECT DESCRIPTION: SPRINGFIELD-HARTLAND, I-91, MM 41.40-66.47, SB-ONLY; PENG, CONST., RESURFACING, INCL. RAMPS.
$6,349,722
THIS IS A VERMONT AGENCY OF TRANSPORTATION (VTRANS 1393) REQUEST FOR A TOTAL OF $6311209 5339 FEDERAL RURAL AND URBAN FORMULA FUNDS AS DETAILED IN THREE PROJECT DESCRIPTIONS BELOW. SIX SUB-RECIPIENTS ARE FUNDED THROUGH THIS GRANT AS LISTED IN THE PROJECT DESCRIPTIONS BELOW. THE THREE PROJECTS ARE DEFINED AS FOLLOWS:- PROJECT 1 CONSISTS OF $17546 OF FFY2021 FEDERAL SMALL URBAN 5339 FORMULA FUNDS FOR: * GREEN MOUNTAIN TRANSIT (GMT-URBAN) ONE (1) REPLACEMENT 35 LOW FLOOR HEAVY-DUTY REPLACEMENT BUSES (PARTIALLY FUNDED) INCLUDING CONTRACT THIRD PARTY TO INSPECT PRODUCTION OF HEAVY-DUTY BUSES AT GILLIG LIVERMORE CA PLANT-- TOTAL PROJECT 1 REQUEST: $17546 FEDERAL FOR GMT URBAN - PROJECT 2 CONSISTS OF $3991374 FEDERAL RURAL 5339 FORMULA FUNDS INCLUDING $588904 FFY2020 RURAL APPORTIONMENTS AND $3402470 FFY2021 RURAL APPORTIONMENTS FOR: * ADVANCE TRANSIT (AT) $100800 FEDERAL - MAINTENANCE BAY LIFT REPLACEMENT - PASSENGER SEAT UPGRADE (REPLACE FABRIC SEATS TO CUSHION W/VINYL) SIX (6) BUSES - GASOLINE TANK PAD - REPLACEMENT OF FLOOR SWEEPER * GREEN MOUNTAIN COMMUNITY NETWORK (GMCN) $112000 FEDERAL - NEW PICKUP UTILITY TRUCK - SOLAR PANELS* GREEN MOUNTAIN TRANSIT (GMT RURAL) $609801 FEDERAL- ONE (1) REPLACEMENT LARGE HEAVY-DUTY BUS 40 - ONE (1) REPLACEMENT MEDIUM-SIZE MEDIUM DUTY BUS INCLUDING CUTAWAY VEHICLE* MARBLE VALLEY REGIONAL TRANSIT DISTRICT (MVRTD) $1546975 FEDERAL - NEW OFFICE BUILDING DESIGN BUILD PROJECT - FILE SERVER REPLACEMENT - SIX (6) REPLACEMENT MEDIUM-SIZE LIGHT-DUTY BUSES INCLUDING CUTAWAY VEHICLES* RURAL COMMUNITY TRANSIT (RCT) $303150 FEDERAL - ENGINE REPLACEMENT - ARCHITECT AND ENGINEERING SERVICES FOR NEW BUS FACILITY - ONE (1) REPLACEMENT MEDIUM-SIZE LIGHT-DUTY BUS INCLUDING CUTAWAY VEHICLE- TWO (2) REPLACEMENT MEDIUM-SIZE LIGHT-DUTY CUTAWAY BUSES* SOUTHEAST VERMONT TRANSIT (SEVT) $1180000 FEDERAL - ROOF REPLACEMENT AT SEVTS ADMINISTRATION AND MAINTENANCE FACILITY LOCATED AT 706 ROCKINGHAM ROAD ROCKINGHAM VT - ONE (1) NEW EXPANSION MEDIUM-SIZE MEDIUM DUTY CUTAWAY BUS 37 34 SEAT 2 W/C DIESEL- FIVE (5) REPLACEMENT MEDIUM-SIZE MEDIUM DUTY CUTAWAY BUSES 37 34 SEAT 2 W/C DIESEL * TRI-VALLEY TRANSIT (TVT) $138648 FEDERAL - BUS WASH LOCATED AT 297 CREEK ROAD MIDDLEBURY VT - OSHA APPROVED SAFETY LADDER AND INSTALLATION COSTS FOR ROOF ACCESS LOCATED AT 297 CREEK ROAD MIDDLEBURY VT - SECURITY SYSTEMS AT HEDDING DRIVE LOCATED AT HEDDING DRIVE BUS BARN IN RANDOLPH VT (FENCING CAMERAS ETC.) - OFFICE EXPANSION AE DESIGN PLAN COSTS FOR A 1 STORY ADDITION LOCATED AT 297 CREEK ROAD MIDDLEBURY VT. SCOPE OF WORK INCLUDES RENOVATING AND RETROFITTING A LARGE OPEN OFFICE SPACE AND ADDING WALLS TO ACCOMMODATE TWO NEW OFFICES AND A CONFERENCE ROOM. OFFICE RENOVATION AND EXPANSION WILL ALSO INCLUDE CONSTRUCTION WORK TO ADD OFFICE DOORS AND ANY REQUIRED MECHANICAL AND ELECTRICAL WORK INCLUDING HVAC SYSTEM UPGRADES AS NEEDED. --TOTAL PROJECT 2 REQUEST: $3991374 FEDERAL -PROJECT 3 CONSISTS OF $2302289 FFY2020 STATE APPORTIONMENT FOR GREEN MOUNTAIN TRANSIT (GMT-URBAN) FOR:* GREEN MOUNTAIN TRANSIT (GMT-URBAN) ONE (1) REPLACEMENT 35 LOW FLOOR HEAVY-DUTY REPLACEMENT BUSES (PARTIALLY FUNDED) - $450065 FEDERAL * GREEN MOUNTAIN TRANSIT (GMT-URBAN) TWO (2) REPLACEMENT 35 LOW FLOOR HEAVY-DUTY REPLACEMENT BUSES - $921622 FEDERAL* GREEN MOUNTAIN TRANSIT (GMT- URBAN) TWO (2) REPLACEMENT 40 LOW FLOOR HEAVY-DUTY BUSES - $930602 FEDERAL --TOTAL PROJECT 3 REQUEST: $2302289 FEDERAL GRAND TOTAL PROJECT 1 2 3: $6311209 FEDERALALL SUB-RECIPIENTS RECEIVING THESE FUNDS ARE IN GOOD STANDING WITH VTRANS. THE LETTER SUPPORTING THE USE OF THESE RURAL FUNDS IN THE SMALL URBAN AREA IS ATTACHED. ALL VEHICLES OF VARIOUS SIZES WERE CHOSEN FROM THE AOT ASSET MANAGEMENT SYSTEM. VTRANS IS THE DIRECT RECIPIENT OF THIS GRANT. THE PURCHASE OF THE VEHICLES AND NON-VEHICLE PROJECTS WILL BE CARRIED OUT BY THE SUB-RECIPIENTS UNDER BOTH INDIVIDUAL AND STATEWIDE JOINT PROCUREMENTS. VTRANS WILL OVERSEE THE PROCUREMENTS AND INCLUDE THE COST OF THE PROJECTS IN THEIR YEARLY GRANT AGREEMENTS. THIS GRANT IS THE RESULT OF THE VTRANS YEARLY COMPETITIVE APPLICATION PROCESS AND IS NECESSARY TO SUSTAIN MOBILITY AND INCREASE RIDERSHIP BOTH FOR THE GENERAL PUBLIC AND THE DISABLED IN ALL RURAL COUNTIES AND THE ONE SMALL URBAN AREA IN CHITTENDEN COUNTY VERMONT. FOR ADA ACCESSIBLE BUSES THE FEDERAL SHARE WILL BE 85% THE STATE AND SUB RECIPIENTS COMBINED CONTRIBUTIONS WILL TOTAL 15% AS INDICATED IN THE ALIS. ALL VEHICLES BEING PROCURED AT 85/15 ARE CAA AND ADA COMPLIANT. A DETAILED LIST OF BUS AND OTHER PURCHASES IS CONTAINED IN THE INDIVIDUAL PROJECT DESCRIPTIONS THE BUDGET DETAILS AS WELL AS IN THE ATTACHED PROGRAM OF PROJECTS. STATE MATCHING FUNDS (5-10%) COME FROM THE TRANSPORTATION FUND WHICH IS COMPRISED OF GAS TAXES AND FEES. VTRANS GRANTS FUNDING TO ITS PROVIDERS TO PURCHASE VEHICLES. THE SUBRECIPIENT IS LISTED AS THE OWNER ON THE TITLE. VTRANS EXERCISES SATISFACTORY CONTINUING CONTROL BY LISTING THE VTRANS AS THE FIRST LIEN HOLDER. THE ORIGINAL PAPER TITLE RESIDES AT VTRANS TO SECURE THE USE OF THE VEHICLE FOR TRANSIT PURPOSES AND TO ENSURE THAT THE INVESTMENT IS RECOVERED AT DISPOSITION. ALL VEHICLES WILL FOLLOW THE DISPOSITION REQUIREMENTS AS OUTLINED IN CIRCULAR 5010. VTRANS TARGETED THIS GRANT TO THE SUBRECIPIENTS WITH THE GREATEST NEEDS. THE SECRETARY OF THE VERMONT AGENCY OF TRANSPORTATION (VTRANS) IS DESIGNATED IN STATUTE TO ADMINISTER ALL STATEWIDE FEDERAL TRANSIT ADMINISTRATION PROGRAMS V.S.A. TITLE 24-5094). EACH PROVIDER LISTED HAS A D-U-N-S NUMBER ON FILE. VTRANS HAS A REGIONAL ITS ARCHITECTURE AS DEFINED IN THE FTA NATIONAL ITS ARCHITECTURE POLICY ISSUED ON APRIL 8 2001. VTRANS EXECUTED THE FY21 CERTIFICATIONS AND ASSURANCES IN TRAMS ON JANUARY 28 2021. ALL ACTIVITIES ARE PROGRAMMED IN THE FFY2021 ELEMENT OF THE CURRENT 2020 VT STIP. VTRANS IS CURRENT WITH ALL CIVIL RIGHTS REQUIREMENTS AND FTA ANNUAL CERTIFICATIONS. ALL ADMINISTRATIVE AND STATUTORY REQUIREMENTS HAVE BEEN MET IN ACCORDANCE WITH THE 5339 BUS AND BUS FACILITIES PROGRAM AS ARTICULATED IN FTA CIRCULAR 5100.1.
$6,311,209
PROJECT TITLE: WILMINGTON-BRATTLEBORO, VT9, BEGINNING AT MM 7.077 IN WILMINGTON EXT. EASTERLY 12.565 MILES; PENG, RESURFACING. :::: PROJECT DESCRIPTION: WILMINGTON-BRATTLEBORO, VT9, BEGINNING AT MM 7.077 IN WILMINGTON EXT. EASTERLY 12.563 MILES; PENG, RESURFACING.
$4,295,267
PROJECT TITLE: BRATTLEBORO, US5, MM 3.30 NORTH 1.25 MILES; PENG, PROJECT SCOPING. :::: PROJECT DESCRIPTION: BRATTLEBORO, US5, MM 3.30 NORTH 1.25 MILES; PENG, PROJECT SCOPING, ROWA, RECONSTRUCT US5.
$4,066,137
PROJECT TITLE: STATEWIDE FY2024 PLANNING & INTERMODAL DEVELOPMENT WORK PROGRAM :::: PROJECT DESCRIPTION: STATEWIDE, FFY2024 PLANNING & INTERMODAL DEVELOPMENT WORK PROGRAM, 10/1/23-9/30/24.
$4,044,404
PROJECT TITLE: MONTPELIER, US2, RESURFACE CLASS I ROUTE. :::: PROJECT DESCRIPTION: MONTPELIER, US2, MM 1.758-4.414; PENG, RESURFACE CLASS I ROUTE.
$3,890,396
PROJECT TITLE: CHITTENDEN COUNTY SFY 2026 MPO WORK PROGRAM. :::: PROJECT DESCRIPTION: CHITTENDEN COUNTY SFY 2026 WORK PROGRAM, 7/1/25-6/30/26.
$3,800,000
PROJECT TITLE: MONTPELIER, US302 & US2, RESURFACE CLASS I ROUTES. :::: PROJECT DESCRIPTION: MONTPELIER, US302, MM 0.000-0.836, AND US2 MM 0.000-1.758; PENG, RESURFACE CLASS I ROUTE.
$3,272,250
PROJECT TITLE: CHITTENDEN CO. MPO FY24 WORK PROGRAM. :::: PROJECT DESCRIPTION: CHITTENDEN CO. MPO ANNUAL WORK PROGRAM.
$3,233,781
PROJECT TITLE: NEWBURY-RYEGATE, I-91, RESURFACING. :::: PROJECT DESCRIPTION: NEWBURY-RYEGATE, I-91, MM 105.018-115.128; PENG, RESURFACING, INCL. RAMPS.
$3,163,323
PROJECT TITLE: STATEWIDE, FFY 2026 HIGHWAY DEVELOPMENT WORK PROGRAM. :::: PROJECT DESCRIPTION: STATEWIDE, FFY 2026 HIGHWAY DEVELOPMENT WORK PROGRAM, 10/1/25-9/30/26.
$2,700,000
PROJECT TITLE: STATEWIDE - NORTHEAST, PAVEMENT MARKINGS :::: PROJECT DESCRIPTION: STATEWIDE - NORTHEAST REGION; PENG, PAVEMENT MARKINGS IN DISTRICTS 4, 6, 7 & 9, ON NHS & STATE ROUTES, AND CENTERLINES ON CLASS I & II ROADS.
$2,401,416
PROJECT TITLE: STATEWIDE - SOUTH, PAVEMENT MARKING :::: PROJECT DESCRIPTION: STATEWIDE - SOUTH REGION; PENG, INSTALL PAVEMENT MARKINGS ON NHS AND STATE ROUTES, AND CENTERLINES ON CLASS I & II ROADS.
$2,265,771
PROJECT TITLE: STATEWIDE - NORTHWEST, PAVEMENT MARKING :::: PROJECT DESCRIPTION: STATEWIDE - NORTHWEST REGION; PENG, INSTALL PAVEMENT MARKING IN DISTRICTS 5, 6, & 8, ON NHS & STATE ROUTES, AND CENTERLINES ON CLASS I & II ROADS.
$2,234,676
PROJECT TITLE: SWANTON-ST. JOHNSBURY, LAMOILLE VALLEY RAIL TRAIL REHAB. :::: PROJECT DESCRIPTION: SWANTON-ST. JOHNSBURYU, LAMOILLE VALLEY RAIL TRAIL, BETWEEN CHANNEL DR. IN DANVILLE TO PUMPKIN HILL RD. IN HARDWICK; PENG, CONST., REHAB TRAIL & EXISTING BRIDGES.
$2,192,421
PROJECT TITLE: STATEWIDE, INTERSTATE PAVEMENT MARKING :::: PROJECT DESCRIPTION: STATEWIDE; PENG, INSTALL PAVEMENT MARKINGS ON THE INTERSTATE HIGHWAYS AND US4.
$2,067,499
PROJECT TITLE: COLCHESTER, US2, AT THE INTERSECTIONS WITH I-89 EXIT #17 AND US7; PENG, IMPROVE INTERSECTIONS, REPLACE US2 BR18A. :::: PROJECT DESCRIPTION: COLCHESTER, US2, AT THE INTERSECTIONS WITH I-89 EXIT #17 AND US7; PENG, ROWA, CONST., IMPROVE INTERSECTIONS, REPLACE US2 BR18A.
$1,770,928
PROJECT TITLE: SPRINGFIELD, US5, CULVERTS BR48A (MM 8.85) & BR48B (MM 8.90); PENG, REPLACE SULVERTS. :::: PROJECT DESCRIPTION: SPRINGFIELD, US5, CULVERTS BR48A (MM 8.85) & BR48B (MM 8.90); PENG, ROWA, REPLACE SULVERTS.
$1,631,144
PROJECT TITLE: WILMINGTON-BRATTLEBORO, VT9, BEGINNING AT MM 7.077 IN WILMINGTON EXT. EASTERLY 12.565 MILES; PENG, RESURFACING. :::: PROJECT DESCRIPTION: WILMINGTON-BRATTLEBORO, VT9, BEGINNING AT MM 7.077 IN WILMINGTON EXT. EASTERLY 12.563 MILES; PENG, CONST., RESURFACING.
$1,602,228
PROJECT TITLE: ADDISON, VT17, RESURFACING. :::: PROJECT DESCRIPTION: ADDISON, VT17, BEGINNING AT MM 0.194 EXT. EASTERLY 8.176 MILES; PENG, RESURFACING.
$1,556,756
PROJECT TITLE: CHARLOTTE, FAS 0330, REPAIR STORM DAMAGE. :::: PROJECT DESCRIPTION: CHARLOTTE, FAS 0330 (SPEAR ST.), REPAIR STORM DAMAGE, INCL. SLOPE FAILURE AND WASHOUT OF CULVERT AND ROADWAY. EVENT #VT24-3; DDIR #D5-0330-CHARLOTTE.
$1,178,775
PROJECT TITLE: GROTON, US302, REPAIR STORM DAMAGE. :::: PROJECT DESCRIPTION: GROTON, US302, REPAIR STORM DAMAGE, INCL. REMOVAL OF SEDIMENT, UNPLUG CULVERTS, REMOVE/RESET GUARDRAIL, REBUILD SUBBASE, PAVE. EVENT #VT24-3; DDIR #D7-US302-GROTON1.
$1,128,559