VIRGINIA DEPARTMENT OF TRANSPORTATION

Total received in grants · trailing 12 months
$181M
vs. GOVERNOR'S AUTHORIZED REPRESENTATIVE ($39.0B), largest tracked grant recipient
$1for every U.S. household÷ 131M U.S. households
In perspective
0.1%of all $162.9B in tracked grants
31separate grants, trailing 12 months

VIRGINIA DEPARTMENT OF TRANSPORTATION has received $181M across 31 federal grants of $1M or more on record.

Data as of July 24, 2026. Source: USAspending.gov, prime contract awards $1M+. Federal spending data lags and has known gaps. This is not a real-time or complete record.

Grants by agency

Where this recipient’s grant dollars come from.

All grant awards

Swipe to see description and amount →

AgencyDescriptionAmount
PROJECT TITLE: NORTHERN VIRGINIA DISTRICTWIDE PAVING; INTERSTATE AND PRIMARY; NHS ROUTES :::: PROJECT DESCRIPTION: NORTHERN VIRGINIA DISTRICTWIDE PAVING; INTERSTATE AND PRIMARY; VARIOUS LOCATIONS, NHS ROUTES
$43,839,600
PROJECT TITLE: HAMPTON ROADS - I-64 DENBIGH BOULEVARD INTERCHANGE :::: PROJECT DESCRIPTION: NEWPORT NEWS; ROUTE 0064; FROM 0.393 MILES NORTH OF ROUTE 173 (DENBIGH BLVD) TO .405 MILES SOUTH OF ROUTE 173( DENBIGH BLVD); INSTALL FIRST PHASE OF FULL INTERCHANGE ON I-64 AT DENBIGH BLVD. THIS PROJECT WILL INSTALL THE I-64 WEST OFF-RAMP, WIDEN I-64 TO SUPPORT THE OFF-RAMP , I-64 WB ON-RAMP & SIGNAL, AND WIDEN DENBIGH BLVD FOR DIAMOND A DESIGN. DENBIGH BLVD/WARWICK AVE & DENBIGH BLVD/JEFFERSON AVE IMPROVEMENTS INCLUDED.
$20,225,406
PROJECT TITLE: CROAKER ROAD-FOUR LANE WIDENING FROM LIBRARY TO ROUTE 60 :::: PROJECT DESCRIPTION: HAMPTON ROADS; FROM 0.512 MILES SOUTH OF ROSE LANE TO 0.233 MILES NORTH OF ROSE LANE; WIDEN ROAD FOR INCREASED CAPACITY.
$14,001,755
PROJECT TITLE: I-64 GAP WIDENING - SEGMENT B :::: PROJECT DESCRIPTION: NEW KENT COUNTY: FROM: MILE MARKER 215.6 TO: MILE MARKER 224.3; WIDEN I-64 FROM 4 TRAVEL LANES TO 6 TRAVEL LANES FROM MILE MAKER 215.6 TO THE NEW KENT/JAMES CITY COUNTY LINE IN BOTH DIRECTIONS, EASTBOUND AND WESTBOUND.
$7,251,447
PROJECT TITLE: BRIDGE REHAB I-77 MM 64 (2992 2993 3022 3023 FED ID) :::: PROJECT DESCRIPTION: BLAND COUNTY; ROUTE 0077; FROM 5.73 FR 52S; TO 2.18 TO 52N; CONSTRUCTION FOR REHAB OF I-77 EXIT 64 RAMP AND MAINLINE STRUCTURES, VA # 2006, 2007, 2026, 2027 AND FED ID 2992, 2993, 3022, 3023.
$6,392,800
PROJECT TITLE: PLANNING & RESEARCH – VTRC – IMPLEMENTATION OF STRUCTURAL DATA FROM TRAFFIC SPEED DEFLECTION DEVICES - PFS :::: PROJECT DESCRIPTION: PLANNING & RESEARCH – VTRC – IMPLEMENTATION OF STRUCTURAL DATA FROM TRAFFIC SPEED DEFLECTION DEVICES - PFS
$6,159,000
PROJECT TITLE: ROUTE 360 WIDENING :::: PROJECT DESCRIPTION: HANOVER COUNTY; FROM WEST ROUTE 643 (LEE DAVIS RD.) TO EAST ROUTE 643 (LEE DAVIS RD.); WIDENING MECHANICSVILLE TURNPIKE, INCLUDING THE ADDITIONS OF TURN LANES AND MEDIANS, IN THE AREA BETWEEN WYNBROOK LANE AND SUJEN CT.
$5,949,741
PROJECT TITLE: GREEN OPERATOR - NEAR ZERO - EMISSION TRUCKS :::: PROJECT DESCRIPTION: HAMPTON ROADS: DISTRICTWIDE; AIR QUALITY AND CONGESTION MANAGEMENT PROGRAM INCLUDING CLEAN DIESEL TECHNOLOGIES FOR DRAY TRUCK REPLACEMENTS, TUG REPOWERING, CARGO HANDLING EQUIPMENT AND MONITORED TRANSPORTATION DEMAND MANAGEMENT (TDM) PROGRAM TO INDUCE CONTAINERS FROM SINGLE TRIPS TO BARGE OR RAIL.
$5,929,186
PROJECT TITLE: RICHMOND STRUCTURE RECOATING - #4 :::: PROJECT DESCRIPTION: RICHMOND: DISTRICTWIDE; CONSTRUCTION FOR DISTRICTWIDE BRIDGE PAINTING
$5,519,282
PROJECT TITLE: RICHMOND STRUCTURE RECOATING - #5 :::: PROJECT DESCRIPTION: RICHMOND: DISTRICTWIDE; CONSTRUCTION FOR DISTRICTWIDE BRIDGE PAINTING
$5,373,540
PROJECT TITLE: COATING OF STEEL BRIDGE SUPERSTRUCTURES IN RICHMOND :::: PROJECT DESCRIPTION: RICHMOND DISTRICT-WIDE; VARIOUS LOCATIONS; CONSTRUCTION FOR DISTRICTWIDE ZONE COATING OF STEEL BRIDGE SUPERSTRUCTURES TO PRESERVE LIFESPAN
$4,807,600
PROJECT TITLE: PAVEMENT MARKING/MARKER CONTRACT - SALEM DISTRICT :::: PROJECT DESCRIPTION: SALEM DISTRICT-WIDE; FROM VARIOUS; TO VARIOUS; CONSTRUCTION PROJECT TO INSTALL AND OR REPLACE PAVEMENT MARKINGS/MARKERS ON VARIOUS ROUTES IN SALEM DISTRICT.
$4,753,586
PROJECT TITLE: VHSIP ROUTE 29 SHOULDER IMPROVEMENTS :::: PROJECT DESCRIPTION: NELSON COUNTY; ROUTE 29; FROM AMHERST COUNTY LINE (MP 96.91); TO MOUNTAIN COVE ROAD (MP 107.11); CONSTRUCTION VIRGINIA HIGHWAY SAFETY IMPROVEMENT (VHSIP) - SHOULDER IMPROVEMENTS ON ROUTE 29 IN NELSON COUNTY TO IMPROVE SAFETY.
$4,655,395
PROJECT TITLE: RTE 293 - STRUCTURE REHABILITATION :::: PROJECT DESCRIPTION: DANVILLE; ROUTE 6293; FROM 0.110 MILE SOUTH OF RTE 58; TO 0.370 MILE NORTH OF RTE 413; CONSTRUCTION STRUCTURE REHABILITION
$4,603,837
PROJECT TITLE: ROUTE 614 OVER SEACOCK SWAMO REPLACEMENT :::: PROJECT DESCRIPTION: SOUTHAMPTON COUNTY; ROUTE 0614; FROM MILE POINT 3.8; TO MILE POINT 3.9; CONSTRUCTION- REPLACE STRUCTURALLY DEFICIENT BRIDGE ON ROUTE 614 OVER SEACOCK SWAMP
$4,553,790
PROJECT TITLE: ROUTE 15 ROUNDABOUT AND BRADDOCK ROAD :::: PROJECT DESCRIPTION: LOUDOUN COUNTY (053); FROM ROUTE 15 AT THE INTERSECTION; TO BRADDOCK ROAD; PRELIMINARY ENGINEERING; DESIGN, RW AND CN OF A SINGLE 130' INSCRIBED CIRCLE DIAMETER WITH 15' LANES WITHIN THE ROUNDABOUT AND A TRAVERSABLE TRUCK APRON AT THE INTERSECTION OF ROUTE 15 AND BRADDOCK ROAD (ROUTE 705). THE ROUNDABOUT WILL ALSO INCLUDE SPLITTER ISLANDS.
$3,400,736
PROJECT TITLE: BRISTOL STRUCTURE RECOATING - BRISTOL/SMYTH :::: PROJECT DESCRIPTION: BRISTOL DISTRICT-WIDE; VARIOUS ROUTES; CONSTRUCTION FOR BIPARTISAN INFRASTRUCTURE LAW REDEPLOYMENT - STRUCTURE RECOATING OF INTERSTATE STRUCTURES IN THE CITY OF BRISTOL AND SMYTH COUNTY
$3,268,262
PROJECT TITLE: ROUTE 95 NORTH BOUND OVER RAPPAHANNOCK RIVER, BRIDGE REHAB :::: PROJECT DESCRIPTION: STAFFORD COUNTY; RAPPAHANNOCK RIVER; BRIDGE REHABILITATION ON DECK AND SUPERSTRUCTURE ON ROUTE 95 NORTH BOUND OVER RAPPAHANNOCK RIVER.
$3,235,366
PROJECT TITLE: JOINT CLOSURE, REPAIR, SEAL, DECK/BACKWALL REPAIR :::: PROJECT DESCRIPTION: RICHMOND DISTRICT-WIDE; VARIOUS LOCATIONS; CONSTRUCTION FOR JOINT MODIFICATION/REHABILITATION, DECK AND BACKWALL REPAIR TO PRESERVE LIFESPAN.
$3,233,300
PROJECT TITLE: RTE 522 - SHOULDER WIDENING, RUMBLE STRIPS, GUARDRAIL :::: PROJECT DESCRIPTION: FREDERICK COUNTY; ROUTE 522; FROM ROUTE 739 APPLE PIE RIDGE ROAD; TO ROUTE 684 GAINESBORO ROAD; CONSTRUCTION FOR SHOULDER WIDENING, RUMBLE STRIPS, UPGRADE SUBSTANDARD GUARDRAIL AT VARIOUS LOCATIONS.
$2,987,931
PROJECT TITLE: BRISTOL STRUCTURE RECOATING CONTRACT - BLAND/WYTHE :::: PROJECT DESCRIPTION: BRISTOL DISTRICT-WIDE; VARIOUS ROUTES; CONSTRUCTION FOR BIPARTISAN INFRASTRUCTURE LAW REDEPLOYMENT - STRUCTURE RECOATING OF INTERSTATE STRUCTURES IN WYTHE AND BLAND COUNTIES
$2,909,897
PROJECT TITLE: ROUTE 340 - SHOULDER WIDENING, RUMBLE STRIPS, GUARDRAIL :::: PROJECT DESCRIPTION: ROCKINGHAM COUNTY; EAST SIDE HIGHWAY; FROM PORT TRACE COURT; TO SAPLING RIDGE ROAD; CONSTRUCTION; SHOULDER WIDENING, RUMBLE STRIPS, UPGRADE SUBSTANDARD GUARDRAIL AT VARIOUS LOCATIONS.
$2,893,160
PROJECT TITLE: TROY ROAD(631) AND ROUTE 250 ROUNDABOUT :::: PROJECT DESCRIPTION: FLUVANNA COUNTY; ROUTE 0250; FROM 0.142 MILES WEST ROUTE 631; TO 0.123 MILES EAST ROUTE 631; CONSTRUCTION DESIGN AND CONSTRUCT A ROUNDABOUT AT THE EXISTING FOUR-LEG INTERSECTION OF ROUTE 250 AND 631 (TROY ROAD). INCLUDES CULVERT IMPROVEMENTS AND SHOULDER WIDENING ON THE APPROACH ROADWAYS.
$2,513,771
PROJECT TITLE: SALEM YEAR 3 - BRIDGE REHAB CONTRACT :::: PROJECT DESCRIPTION: BOTETOURT COUNTY; ROUTE 1; FROM 3.72 MI. RTE. 220; TO 2.41 MI. RTE. 640; CONSTRUCTION BRIDGE REHABILITATION - RTE. 81 OVER ROUTE 670 - BOTETOURT COUNTY
$2,022,543
PROJECT TITLE: DISTRICTWIDE BRIDGE WASHING AT VARIOUS LOCATIONS :::: PROJECT DESCRIPTION: LYNCHBURG DISTRICT-WIDE; FROM VARIOUS; TO VARIOUS; CONSTRUCTION PERFORM PREVENTATIVE BRIDGE MAINTENANCE BY WASHING BRIDGE DECKS, DRAINAGE TROUGHS AND SEATS.
$1,938,900
PROJECT TITLE: #HB2.FY17 U.S. 58 CORRIDOR INTERSECTION CAPACITY & SAFETY :::: PROJECT DESCRIPTION: NORFOLK; ROUTE 0058; FROM NEWTOWN ROAD; TO CLARENCE STREET; CONSTRUCTION TO PROVIDE INTERSECTION CAPACITY IMPROVEMENTS AT THE BOTTLENECK INTERSECTION OF VA BEACH BLVD AND NEWTOWN RD. IT ALSO REMOVES SOME SECTIONS OF UNDESIRABLE FRONTAGE ROADS AND PROVIDES ENHANCED PEDESTRIAN SAFETY AND UTILITY.
$1,936,605
PROJECT TITLE: US19 ACCESS MANGEMENT IMPROVEMENT/EVERETT HAGY :::: PROJECT DESCRIPTION: WASHINGTON COUNTY; ROUTE 19; FROM 0.079 MI. NORTH INT. US ROUTE 19 NB AT BLACK HOLLOW RD; TO 0.014 MI. SOUTH INT. US ROUTE 19 NB AT EVERETT HAGY RD; CONSTRUCTION TO CONSTRUCT A 200’ X 200’ LEFT TURN LANE W/CHANNELIZATION ISLAND RESTRICTING LEFT TURNS ONTO ROUTE 19 NB. ROUTE 633 WILL BE CLOSED AT THE EASTERN INT OF RTE. 19 & A CUL DE SAC CONSTRUCTED. THE MEDIAN CROSSOVER AT THE WESTERN INT OF RTE. 19 WIDENED TO ACCOMMODATE BUSES TURNING.
$1,774,390
PROJECT TITLE: ROSSER AVENUE (ROUTE 340) CORRIDOR IMPROVEMENTS :::: PROJECT DESCRIPTION: WAYNESBORO: FROM: LADD ROAD TO: TIFFANY DRIVE; ROSSER AVENUE CORRIDOR IMPROVEMENTS
$1,303,149
PROJECT TITLE: GREENWAY CONNECTION - RIVERLAND ROAD :::: PROJECT DESCRIPTION: ROANOKE; RIVERLAND ROAD; FROM GARDEN CITY GREENWAY; TO ROANOKE RIVER GREENWAY; CONSTRUCTION; CONSTRUCTION OF GREENWAY ALONG RIVERLAND ROAD BETWEEN GARDEN CITY GREENWAY AND ROANOKE RIVER GREENWAY WITH RECONSTRUCTED PARKING. ADDRESSES EXISTING DRAINAGE PROBLEM. STORMWATER ACCUMULATES ON MILL MOUNTAIN, TRANSVERSES STEEP TOPOGRAPHY AND ULTIMATELY SCOURS AND ERODES THE SHOULDER ALONG RIVERLAND ROAD.
$1,188,912
PROJECT TITLE: MEDIAN CROSSOVER TO ROUTE 13 :::: PROJECT DESCRIPTION: NORTHAMPTON COUNTY; FROM 0.06 MILES NORTH OF CAPERVILLE DRIVE; TO 0.03 MILES NORTH OF ARLINGTON ROAD; CONSTRUCTION; MEDIAN CLOSURES AND MODIFICATIONS TO SIX CROSSOVERS ON ROUTE 13 BETWEEN MP 75 AND MP 76 INCLUDING THREE MEDIAN CLOSURES AND THREE ADDITIONAL LEFT PLUS RIGHT TURN LANES
$1,115,207
PROJECT TITLE: HUNTER MILL ROAD OVER COLVIN RUN :::: PROJECT DESCRIPTION: FAIRFAX COUNTY; ROUTE 0674; FROM: 1 SOUTH OF COLVIN RUN TO: 1 NORTH OF COLVIN RUN; PE TO REPLACE STRUCTURALLY DEFICIENT BRIDGE. STRUCTURE NUMBER: 6829
$1,097,800