ALASKA DEPARTMENT OF TRANSPORTATION & PUBLIC FACILITIES
Total received in grants · trailing 12 months
$72M
$1for every U.S. household÷ 131M U.S. households
In perspective
0.0%of all $162.9B in tracked grants
14separate grants, trailing 12 months
ALASKA DEPARTMENT OF TRANSPORTATION & PUBLIC FACILITIES has received $72M across 14 federal grants of $1M or more on record.
Data as of July 24, 2026. Source: USAspending.gov, prime contract awards $1M+. Federal spending data lags and has known gaps. This is not a real-time or complete record.
Grants by agency
Where this recipient’s grant dollars come from.
All grant awards
Swipe to see description and amount →
| Agency | Description | Amount |
|---|---|---|
| Department of Transportation | PROJECT TITLE: WHITTIER TUNNEL OPERATIONS SFY2027 - 2029 :::: PROJECT DESCRIPTION: PROVIDE FEDERAL-AID FUNDS FOR THE COSTS TO OPERATE THE ANTON ANDERSON MEMORIAL TUNNEL. THE PROJECT WILL PROVIDE FUNDING ON AN ANNUAL BASIS FOR THE WEBBER INFRASTRUCTURE MANAGEMENT CONTRACT. | $15,133,533 |
| Department of Transportation | PROJECT TITLE: WEST SUSITNA ACCESS ROAD [PARENT AND FINAL CONSTRUCTION] :::: PROJECT DESCRIPTION: CONSTRUCT A NEW ROAD TO AND ACROSS THE SUSITNA RIVER, CONNECTING THE CONTIGUOUS HIGHWAY SYSTEM TO STATERECREATION LANDS WEST OF THE SUSITNA RIVER. CONSTRUCT A BOAT LAUNCH FACILITY ACCESSING THE SUSITNA RIVER.- 34461[CHILD STAGE 1]: CONSTRUCT APPROXIMATELY 17 MILES OF A 24' WIDE NEW ROAD FROM THE PROJECT AT LITTLE SU ROAD TO THE SOUTH BANK OF THE SUSITNA RIVER INCLUDING TWO BRIDGES ACROSS THE LITTLE SUSITNA RIVER AND FISH CREEK. CONSTRUCT A BOAT LAUNCH FACILITY ACCESSING THE SUSITNA RIVER.34206 [PARENT FINAL STAGE 2]: CONSTRUCT APPROXIMATELY 5 MILES OF A 24' FROM THE END OF THE STAGE I PROJECT TO THE PROPOSED MATERIAL SITE JUST WEST OF ALEXANDER CREEK, INCLUDING A BRIDGE ACROSS THE SUSITNA RIVER AND ALEXANDER CREEK, CONNECTING THE CONTIGUOUS HIGHWAY SYSTEM TO STATE RECREATION LANDS WEST OF THE SUSITNA RIVER. | $10,542,845 |
| Department of Transportation | PROJECT TITLE: CRAIG ADA IMPROVEMENTS :::: PROJECT DESCRIPTION: ADA IMPROVEMENTS TO CRAIG SEGMENTS 1 & 2 OF THE SOUTHCOAST ADA AUDIT. APPROXIMATELY 1.8 MILES OF WATER ST./CRAIG/KLAWOCK HWY BETWEEN THIRD STREET AND CRAIG HIGH SCHOOL. SCOPE OF WORK TO INCLUDE SIDEWALK, CURB RAMP, DRIVEWAY AND STREET CROSSING IMPROVEMENTS CONSISTENT WITH FINDINGS IN THE 2017 SOUTHCOAST ADA AUDIT. | $9,325,373 |
| Department of Transportation | PROJECT TITLE: AMATS: DOWNTOWN TRAIL CONNECTION :::: PROJECT DESCRIPTION: PROJECT WILL CONSTRUCT A CONNECTION BETWEEN THE TONY KNOWLES COASTAL TRAIL, THE SHIP CREEK TRAIL, AND THE SHIP CREEK SMALL BOAT LAUNCH IN DOWNTOWN ANCHORAGE. MAJOR PROJECT ELEMENTS INCLUDE ROADSIDE HARDWARE, DRAINAGE IMPROVEMENTS, INTERSECTION IMPROVEMENTS AND ADA IMPROVEMENTS. FROM THE TONY KNOWLES COASTAL TRAIL AT ELDERBERRY PARK TO THE SHIP CREEK TRAIL AT N C STREET CONNECTING THROUGH THE SHIP CREEK SMALL BOAT LAUNCH AREA. | $8,076,019 |
| Department of Transportation | PROJECT TITLE: STEESE EXPRESSWAY/JOHANSEN EXPRESSWAY INTERCHANGE :::: PROJECT DESCRIPTION: REV 03/2021: RECONSTRUCT THE INTERSECTION OF THE STEESE AND JOHANSEN EXPRESSWAYS, INCLUDING IMPROVEMENTS TO LAZELLE ROAD, FARMERS LOOP EXTENSION, ALTERATIONS TO CITY LIGHTS BOULEVARD, TEMPORARY EXTENSION OF FARMERS LOOP EXTENSION TO NORTHSIDE BOULEVARD, AND TRAIL AND PATH CONNECTIONS IN THE PROJECT AREA. PROJECT WILL INCLUDE BRIDGE WORK, ROADSIDE HARDWARE, DRAINAGE IMPROVEMENTS, ADA IMPROVEMENTS AND UTILITIES. | $6,600,556 |
| Department of Transportation | PROJECT TITLE: YANKOVICH-MILLER HILL ROAD RECONSTRUCTION AND MULTI-USE PATH :::: PROJECT DESCRIPTION: REV 06/2018: RECONSTRUCT MILLER HILL ROAD AND YANKOVICH ROAD, AND IMPROVE EXISTING SEPARATED MULTI-USE PATH AS NEEDED. PROJECT WORK WILL INCLUDE ROADSIDE HARDWARE, DRAINAGE IMPROVEMENTS AND UTILITIES. MILLER HILL ROAD, YANKOVICH ROAD, AND BALLAINE ROAD IN FAIRBANKS. | $5,879,113 |
| Department of Transportation | PARKS HIGHWAY MP 305-325 RECONSTRUCTION | $4,630,723 |
| Department of Transportation | PROJECT TITLE: ANCHORAGE DISTRICT GROUP B - NOV 2018 EQ PR :::: PROJECT DESCRIPTION: THIS PROJECT WILL DESIGN AND CONSTRUCT REPAIRS FOR THE NOVEMBER 30, 2018 EARTHQUAKE IN THE CENTRAL REGION OF ALASKA FOR THE FOLLOWING DDIRS: AK 2019 02 115, AK 2019 02 119, AK 2019 02 148, AK 2019 02 149, AK 2019 02 158, AND AK 2019 02 161. REPAIRS MAY INCLUDE, BUT ARE NOT LIMITED TO, ASPHALT, EMBANKMENT, BRIDGE, ROADSIDE HARDWARE, RETAINING WALLS, UTILITIES, AND DRAINAGE. DDIR AK 2019 02 266 WAS ADDED TO THIS PROJECT AFTER ATP THRU PRELIMINARY DESIGN BUT WAS INCLUDED IN THE ENVIRONMENTAL DOCUMENT. | $2,630,385 |
| Department of Transportation | PROJECT TITLE: WASILLA-FISHOOK RD - MAIN STREET REHABILITATION :::: PROJECT DESCRIPTION: CONSTRUCT A ONE-WAY COUPLET IN DOWNTOWN WASILLA BOUNDED BY BOGARD ROAD, KGB/MAIN STREET, YENLO/TALKEETNA STREET AND THE PALMER WASILLA HIGHWAY. THE EXACT LOCATION OF THE COUPLET WILL BE DETERMINED DURING THE ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE. IMPROVEMENTS TO BOGARD ROAD WILL BE NECESSARY TO MAKE THE COUPLET FUNCTIONAL. WORK WILL CONSIST OF NEW ROAD CONSTRUCTION, LANE RECONFIGURATIONS, SIGNALS, NEW PAVEMENT, SIGNING AND STRIPING AND SIDEWALKS. | $2,137,795 |
| Department of Transportation | PROJECT TITLE: JNU EGAN DRIVE LIGHTING IMPROVEMENTS :::: PROJECT DESCRIPTION: REPLACE EXISTING HIGH-PRESSURE SODIUM(HPS) WITH NEWER, EFFICIENT LED LIGHT HEADS ON ALL LIGHT POLES ALONG EGAN DRIVE (CDS ROUTE# 296000) BETWEEN 10TH STREET AND MENDENHALL LOOP BOULEVARD. | $1,649,527 |
| Department of Transportation | PROJECT TITLE: OLD SEWARD AND HUFFMAN, RABBIT CR RD TO O'MALLEY TO BIRCH, PAVEMENT PRESERVTION :::: PROJECT DESCRIPTION: MILL, FILL AND STRIPE ROADWAY. UPGRADE FOR COMPLIANCE WITH AMERICANS WITH DISABILITIES ACT. MAY INCLUDE: REHABILITATION OF STRUCTURAL SECTION IN SELECT LOCATIONS, ROADSIDE HARDWARE, DRAINAGE IMPROVEMENTS, SAFETY IMPROVEMENTS, REPAIR OR UPGRADE OF NON-MOTORIZED FACILITIES, SEISMIC RETROFIT, SCOUR COUNTERMEASURES, REHABILITATION OR UPGRADE OF BRIDGE DECK AND/OR RAIL, ADJUSTMENT OR RELOCATION OF UTILITIES. | $1,637,460 |
| Department of Transportation | PROJECT TITLE: AMATS ANCHORAGE AREA PATHWAY &TRAILS PAVEMENT REPLACEMENT :::: PROJECT DESCRIPTION: THIS AMATS PROJECT WILL REPAIR AND REPLACE PAVEMENT ON SECTIONS OF PATHWAY AND TRAILS IN THE MUNICIPALITY OF ANCHORAGES. THE PAVEMENT REHABILITATION PROJECT MAY INCLUDE ROADSIDE HARDWARE, IMPROVEMENTS TO DRAINAGE AND ADA, AND UTILITIES AS NECESSARY. | $1,533,531 |
| Department of Transportation | PROJECT TITLE: WEST SUSITNA ACCESS ROAD [PARENT AND FINAL CONSTRUCTION] :::: PROJECT DESCRIPTION: CONSTRUCT A NEW ROAD TO AND ACROSS THE SUSITNA RIVER, CONNECTING THE CONTIGUOUS HIGHWAY SYSTEM TO STATERECREATION LANDS WEST OF THE SUSITNA RIVER. CONSTRUCT A BOAT LAUNCH FACILITY ACCESSING THE SUSITNA RIVER.- 34461[CHILD STAGE 1]: CONSTRUCT APPROXIMATELY 17 MILES OF A 24' WIDE NEW ROAD FROM THE PROJECT AT LITTLE SU ROAD TO THE SOUTH BANK OF THE SUSITNA RIVER INCLUDING TWO BRIDGES ACROSS THE LITTLE SUSITNA RIVER AND FISH CREEK. CONSTRUCT A BOAT LAUNCH FACILITY ACCESSING THE SUSITNA RIVER.34206 [PARENT FINAL STAGE 2]: CONSTRUCT APPROXIMATELY 5 MILES OF A 24' FROM THE END OF THE STAGE I PROJECT TO THE PROPOSED MATERIAL SITE JUST WEST OF ALEXANDER CREEK, INCLUDING A BRIDGE ACROSS THE SUSITNA RIVER AND ALEXANDER CREEK, CONNECTING THE CONTIGUOUS HIGHWAY SYSTEM TO STATE RECREATION LANDS WEST OF THE SUSITNA RIVER. | $1,243,063 |
| Department of Transportation | PROJECT TITLE: COPPER RIVER HIGHWAY ODIAK SLOUGH CULVERT REPLACEMENT :::: PROJECT DESCRIPTION: REPLACE A DEEP CULVERT ON THE COPPER RIVER HIGHWAY MP 1.3 ODIAK SLOUGH IN CORDOVA. PROJECT INCLUDES ADA IMPROVEMENTS, DRAINAGE IMPROVEMENTS, PAVEMENT PRESERVATION, ROADSIDE HARDWARE, AND UTILITIES. | $1,144,294 |