DEPARTMENT OF TRANSPORTATION CONNECTICUT

Total received in grants · trailing 12 months
$138M
vs. GOVERNOR'S AUTHORIZED REPRESENTATIVE ($39.0B), largest tracked grant recipient
$1for every U.S. household÷ 131M U.S. households
In perspective
0.1%of all $162.9B in tracked grants
19separate grants, trailing 12 months

DEPARTMENT OF TRANSPORTATION CONNECTICUT has received $138M across 19 federal grants of $1M or more on record.

Data as of July 24, 2026. Source: USAspending.gov, prime contract awards $1M+. Federal spending data lags and has known gaps. This is not a real-time or complete record.

Grants by agency

Where this recipient’s grant dollars come from.

All grant awards

Swipe to see description and amount →

AgencyDescriptionAmount
PROJECT TITLE: MERIDEN; I-91/I-691/ROUTE 15 INTERCHANGE - IMPROVEMENTS TO I-91 NORTHBOUND, I-691 WESTBOUND, AND ROUTE 15 NORTHBOUND. :::: PROJECT DESCRIPTION: MERIDEN; I-91/I-691/ROUTE 15 INTERCHANGE - IMPROVEMENTS TO I-91 NORTHBOUND, I-691 WESTBOUND, AND ROUTE 15 NORTHBOUND TO ADDRESS OPERATIONAL AND SAFETY CONCERNS. THIS 'BREAKOUT' PROJECT WAS DESIGNED UNDER PROJECT DOT00790240PE. (CN)
$79,181,749
ROCKY HILL; REPLACE BRIDGES #03163 & #03164 WHICH CARRY ROUTE 160 OVER INTERSTATE 91. (CN)
$10,160,604
PROJECT TITLE: GLASTONBURY; REVISE CT 17 SB TO NEW LONDON TURNPIKE. :::: PROJECT DESCRIPTION: GLASTONBURY; REMOVE THE CT 17 SB OFF-RAMP 007 TO NEW LONDON TURNPIKE, WHICH INCLUDES REMOVING BRIDGE NOS. 00388 AND 00389, AND RECONFIGURE THE INTERSECTION OF THE CT 17 SB OFF-RAMP 005 AND NEW LONDON TURNPIKE INTO A ROUNDABOUT AND DECK REPLACEMENT FOR BR. 00870. (CN)
$7,170,457
PROJECT TITLE: OPERATION OF DOT NEWINGTON HIGHWAY OPERATIONS CENTER (NOC) & SUPPORT OF ITS OPERATIONAL ACTIVITIES ON I-84, I-91, I-291, I-384 AND OTHER STATE ROUTES. :::: PROJECT DESCRIPTION: OPERATION OF DOT NEWINGTON HIGHWAY OPERATIONS CENTER (NOC) & SUPPORT OF ITS OPERATIONAL ACTIVITIES ON I-84, I-91, I-291, I-384 AND OTHER STATE ROUTES FOR THE TERM PERIOD 08/01/2026 THRU 07/31/2030. THIS PROJECT REPLACES DOT00930246HO (OTHER).
$5,660,000
DIRECT PROCUREMENT/PURCHASE OF EQUIPMENT ASSOCIATED WITH THE DOT NEWINGTON HIGHWAY OPERATIONS CENTER (NHOC) AND OTHER ITS ACTIVITIES.
$5,040,000
PROJECT TITLE: DISTRICT 1 - REPLACEMENT OF TRAFFIC CONTROL SIGNALS TO MEET CURRENT STANDARDS AT VARIOUS LOCATIONS (CN). :::: PROJECT DESCRIPTION: DISTRICT 1 - REPLACEMENT OF TRAFFIC CONTROL SIGNALS TO MEET CURRENT STANDARDS AT VARIOUS LOCATIONS (CN).
$4,787,308
PROJECT TITLE: CT 15 NEW HAVEN – INSTALL MASH COMPLIANT METAL BEAM RAIL TO REPLACE THE EXISTING THREE-CABLE GUIDERAIL (CN). :::: PROJECT DESCRIPTION: NEW HAVEN – INSTALL MASH COMPLIANT METAL BEAM RAIL TO REPLACE THE EXISTING THREE-CABLE GUIDERAIL ON ROUTE 15 (CN).
$3,917,030
PROJECT TITLE: SHELTON - REHABILITATION OF BRIDGE #01602 (NO ADDED CAPACITY), SR 454 OVER INDIAN HOLE BROOK (CN). :::: PROJECT DESCRIPTION: SHELTON - REHABILITATION OF BRIDGE #01602 (NO ADDED CAPACITY), SR 454 OVER INDIAN HOLE BROOK (CN).
$3,171,236
PROJECT TITLE: KILLINGLY - REPLACEMENT OF BRIDGE NO. 02599 (NON-NBI) CARRYING CT ROUTE 101 OVER ALVIA CHASE RESERVOIR. NO ADDED CAPACITY. (CN). :::: PROJECT DESCRIPTION: KILLINGLY - REPLACEMENT OF BRIDGE NO. 02599 (NON-NBI) CARRYING CT ROUTE 101 OVER ALVIA CHASE RESERVOIR. NO ADDED CAPACITY. (CN).
$3,105,568
PROJECT TITLE: NORWICH - REPLACE SUBSTANDARD THREE-CABLE GUIDERAIL WITH A MASH COMPLIANT RAIL SYSTEM AND IMPROVE HIGHWAY GEOMETRY ON SR 642 AT STURTEVANT STREET. :::: PROJECT DESCRIPTION: NORWICH - REPLACE SUBSTANDARD THREE-CABLE GUIDERAIL WITH A MASH COMPLIANT RAIL SYSTEM AND IMPROVE HIGHWAY GEOMETRY ON SR 642 AT STURTEVANT STREET (BETWEEN MILE POINTS 1.74 - 1.97) (CN).
$2,400,000
PROJECT TITLE: SHELTON; EMERGENCY DECLARATION (ED) PART 2, TO ADDRESS THE LOAD CARRYING CAPACITY OF ROUTE 8 BRIDGE 00571A (COMMODORE HULL) OVER THE HOUSATONIC RIVER. :::: PROJECT DESCRIPTION: SHELTON; EMERGENCY DECLARATION (ED) PART 2, TO ADDRESS THE LOAD CARRYING CAPACITY OF ROUTE 8 BRIDGE 00571A (COMMODORE HULL) OVER THE HOUSATONIC RIVER. (CN)
$2,306,542
PROJECT TITLE: OPERATION OF DOT BRIDGEPORT HIGHWAY OPERATIONS CENTER (BOC) & SUPPORT OF ITS OPERATIONAL ACTIVITIES ALONG I-95 CORRIDOR & SOUTHERN PORTION OF I-395. :::: PROJECT DESCRIPTION: OPERATION OF DOT BRIDGEPORT HIGHWAY OPERATIONS CENTER (BOC) & SUPPORT OF ITS OPERATIONAL ACTIVITIES ALONG I-95 CORRIDOR & SOUTHERN PORTION OF I-395 CORRIDOR FOR THE TERM PERIOD 08/01/2026-07/31/2030. REPLACES DOT00150387HO. (OT)
$1,800,000
PROJECT TITLE: HAMDEN - WALKABLE SIDEWALK PEDESTRIAN/BIKE IMPROVEMENTS AT VARIOUS LOCATIONS (CN). :::: PROJECT DESCRIPTION: HAMDEN - WALKABLE SIDEWALK PROJECT INCLUDES PEDESTRIAN/BIKE IMPROVEMENTS AT VARIOUS LOCATIONS ALONG AUGUR, BENHAM, DAVIS, & TREADWALL STREETS. IMPROVEMENTS INCLUDE SIDEWALKS, CROSSWALKS, ACCESSIBLE CURB RAMPS, SIGNAGE, AND ROADWAY RESTRIPING (CN).
$1,700,000
PROJECT TITLE: REPLACE/UPGRADE CAMERAS, COMMUNICATIONS EQUIPMENT, AND FIBER OPTIC CABLE WITH MODERN EQUIPMENT ALONG I-95 FROM WEST HAVEN TO WESTBROOK. :::: PROJECT DESCRIPTION: REPLACE/UPGRADE CAMERAS, COMMUNICATIONS EQUIPMENT, AND FIBER OPTIC CABLE WITH MODERN EQUIPMENT ALONG I-95 FROM WEST HAVEN TO WESTBROOK TO IMPROVE PUBLIC SAFETY AND REDUCE CONGESTION AND EMISSIONS. (PD)
$1,530,000
PROJECT TITLE: HARTFORD; TUNNEL TU06559 IMPROVEMENTS. :::: PROJECT DESCRIPTION: HARTFORD; REHABILITATION OF TUNNEL TU06559 CARRYING I-84 HARTFORD PLATFORM OVER I-84. THE TUNNEL IS COMPRISED OF TWO BRIDGES, BRIDGE NOS. 01426 (US 44/MAIN STREET OVER I-84) AND 01763 (TRUMBULL STREET OVER I-84), AND THREE PLATFORMS. (PD)
$1,436,985
PROJECT TITLE: HAMDEN - WALKABLE SIDEWALK PEDESTRIAN/BIKE IMPROVEMENTS AT VARIOUS LOCATIONS (CN). :::: PROJECT DESCRIPTION: HAMDEN - WALKABLE SIDEWALK PROJECT INCLUDES PEDESTRIAN/BIKE IMPROVEMENTS AT VARIOUS LOCATIONS ALONG AUGUR, BENHAM, DAVIS, & TREADWALL STREETS. IMPROVEMENTS INCLUDE SIDEWALKS, CROSSWALKS, ACCESSIBLE CURB RAMPS, SIGNAGE, AND ROADWAY RESTRIPING (CN).
$1,422,953
PROJECT TITLE: DIRECT PROCUREMENT/PURCHASE OF EQUIPMENT ASSOCIATED WITH THE DOT NEWINGTON HIGHWAY OPERATIONS CENTER (NHOC) AND OTHER ITS ACTIVITIES. :::: PROJECT DESCRIPTION: DIRECT PROCUREMENT/PURCHASE OF EQUIPMENT ASSOCIATED WITH THE DOT NEWINGTON HIGHWAY OPERATIONS CENTER (NHOC) AND OTHER INTELLIGENT TRANSPORTATION SYSTEMS (ITS) ACTIVITIES. PROJECT TERM IS 4 YEARS, 08/01/2018-07/31/2022. (OT)
$1,260,503
PROJECT TITLE: SOUTHBURY; REPLACEMENT OF BRIDGE NO. 02437 CARRYING ROUTE 67 (SOUTHFORD ROAD) OVER SOUTH BRANCH BULLET HILL BROOK. :::: PROJECT DESCRIPTION: SOUTHBURY; REPLACEMENT OF BRIDGE NO. 02437 CARRYING ROUTE 67 (SOUTHFORD ROAD) OVER SOUTH BRANCH BULLET HILL BROOK AND ROADWAY IMPROVEMENTS IN VICINITY OF BRIDGE. REPLACEMENT OF TEMPORARY ACROW BRIDGE INSTALLED FOLLOWING AUGUST 2024 RAIN EVENT.
$1,200,000
PROJECT TITLE: REPLACE/UPGRADE CAMERAS AND COMMUNICATIONS EQUIPMENT ALONG THE I-84 CORRIDOR FROM WATERBURY TO HARTFORD (CN). :::: PROJECT DESCRIPTION: REPLACEMENT/UPGRADE OF CAMERAS AND COMMUNICATIONS EQUIPMENT, ALONG THE I-84 CORRIDOR FROM WATERBURY TO HARTFORD AND ALONG THE ROUTE 8 CORRIDOR FROM NAUGATUCK TO WATERBURY, WITH MODERN EQUIPMENT ON TALLER CAMERA POLES WITH CAMERA LOWERING DEVICES (CN).
$1,000,000