DEPARTMENT OF TRANSPORTATION CONNECTICUT
Total received in grants · trailing 12 months
$138M
$1for every U.S. household÷ 131M U.S. households
In perspective
0.1%of all $162.9B in tracked grants
19separate grants, trailing 12 months
DEPARTMENT OF TRANSPORTATION CONNECTICUT has received $138M across 19 federal grants of $1M or more on record.
Data as of July 24, 2026. Source: USAspending.gov, prime contract awards $1M+. Federal spending data lags and has known gaps. This is not a real-time or complete record.
Grants by agency
Where this recipient’s grant dollars come from.
All grant awards
Swipe to see description and amount →
| Agency | Description | Amount |
|---|---|---|
| Department of Transportation | PROJECT TITLE: MERIDEN; I-91/I-691/ROUTE 15 INTERCHANGE - IMPROVEMENTS TO I-91 NORTHBOUND, I-691 WESTBOUND, AND ROUTE 15 NORTHBOUND. :::: PROJECT DESCRIPTION: MERIDEN; I-91/I-691/ROUTE 15 INTERCHANGE - IMPROVEMENTS TO I-91 NORTHBOUND, I-691 WESTBOUND, AND ROUTE 15 NORTHBOUND TO ADDRESS OPERATIONAL AND SAFETY CONCERNS. THIS 'BREAKOUT' PROJECT WAS DESIGNED UNDER PROJECT DOT00790240PE. (CN) | $79,181,749 |
| Department of Transportation | ROCKY HILL; REPLACE BRIDGES #03163 & #03164 WHICH CARRY ROUTE 160 OVER INTERSTATE 91. (CN) | $10,160,604 |
| Department of Transportation | PROJECT TITLE: GLASTONBURY; REVISE CT 17 SB TO NEW LONDON TURNPIKE. :::: PROJECT DESCRIPTION: GLASTONBURY; REMOVE THE CT 17 SB OFF-RAMP 007 TO NEW LONDON TURNPIKE, WHICH INCLUDES REMOVING BRIDGE NOS. 00388 AND 00389, AND RECONFIGURE THE INTERSECTION OF THE CT 17 SB OFF-RAMP 005 AND NEW LONDON TURNPIKE INTO A ROUNDABOUT AND DECK REPLACEMENT FOR BR. 00870. (CN) | $7,170,457 |
| Department of Transportation | PROJECT TITLE: OPERATION OF DOT NEWINGTON HIGHWAY OPERATIONS CENTER (NOC) & SUPPORT OF ITS OPERATIONAL ACTIVITIES ON I-84, I-91, I-291, I-384 AND OTHER STATE ROUTES. :::: PROJECT DESCRIPTION: OPERATION OF DOT NEWINGTON HIGHWAY OPERATIONS CENTER (NOC) & SUPPORT OF ITS OPERATIONAL ACTIVITIES ON I-84, I-91, I-291, I-384 AND OTHER STATE ROUTES FOR THE TERM PERIOD 08/01/2026 THRU 07/31/2030. THIS PROJECT REPLACES DOT00930246HO (OTHER). | $5,660,000 |
| Department of Transportation | DIRECT PROCUREMENT/PURCHASE OF EQUIPMENT ASSOCIATED WITH THE DOT NEWINGTON HIGHWAY OPERATIONS CENTER (NHOC) AND OTHER ITS ACTIVITIES. | $5,040,000 |
| Department of Transportation | PROJECT TITLE: DISTRICT 1 - REPLACEMENT OF TRAFFIC CONTROL SIGNALS TO MEET CURRENT STANDARDS AT VARIOUS LOCATIONS (CN). :::: PROJECT DESCRIPTION: DISTRICT 1 - REPLACEMENT OF TRAFFIC CONTROL SIGNALS TO MEET CURRENT STANDARDS AT VARIOUS LOCATIONS (CN). | $4,787,308 |
| Department of Transportation | PROJECT TITLE: CT 15 NEW HAVEN – INSTALL MASH COMPLIANT METAL BEAM RAIL TO REPLACE THE EXISTING THREE-CABLE GUIDERAIL (CN). :::: PROJECT DESCRIPTION: NEW HAVEN – INSTALL MASH COMPLIANT METAL BEAM RAIL TO REPLACE THE EXISTING THREE-CABLE GUIDERAIL ON ROUTE 15 (CN). | $3,917,030 |
| Department of Transportation | PROJECT TITLE: SHELTON - REHABILITATION OF BRIDGE #01602 (NO ADDED CAPACITY), SR 454 OVER INDIAN HOLE BROOK (CN). :::: PROJECT DESCRIPTION: SHELTON - REHABILITATION OF BRIDGE #01602 (NO ADDED CAPACITY), SR 454 OVER INDIAN HOLE BROOK (CN). | $3,171,236 |
| Department of Transportation | PROJECT TITLE: KILLINGLY - REPLACEMENT OF BRIDGE NO. 02599 (NON-NBI) CARRYING CT ROUTE 101 OVER ALVIA CHASE RESERVOIR. NO ADDED CAPACITY. (CN). :::: PROJECT DESCRIPTION: KILLINGLY - REPLACEMENT OF BRIDGE NO. 02599 (NON-NBI) CARRYING CT ROUTE 101 OVER ALVIA CHASE RESERVOIR. NO ADDED CAPACITY. (CN). | $3,105,568 |
| Department of Transportation | PROJECT TITLE: NORWICH - REPLACE SUBSTANDARD THREE-CABLE GUIDERAIL WITH A MASH COMPLIANT RAIL SYSTEM AND IMPROVE HIGHWAY GEOMETRY ON SR 642 AT STURTEVANT STREET. :::: PROJECT DESCRIPTION: NORWICH - REPLACE SUBSTANDARD THREE-CABLE GUIDERAIL WITH A MASH COMPLIANT RAIL SYSTEM AND IMPROVE HIGHWAY GEOMETRY ON SR 642 AT STURTEVANT STREET (BETWEEN MILE POINTS 1.74 - 1.97) (CN). | $2,400,000 |
| Department of Transportation | PROJECT TITLE: SHELTON; EMERGENCY DECLARATION (ED) PART 2, TO ADDRESS THE LOAD CARRYING CAPACITY OF ROUTE 8 BRIDGE 00571A (COMMODORE HULL) OVER THE HOUSATONIC RIVER. :::: PROJECT DESCRIPTION: SHELTON; EMERGENCY DECLARATION (ED) PART 2, TO ADDRESS THE LOAD CARRYING CAPACITY OF ROUTE 8 BRIDGE 00571A (COMMODORE HULL) OVER THE HOUSATONIC RIVER. (CN) | $2,306,542 |
| Department of Transportation | PROJECT TITLE: OPERATION OF DOT BRIDGEPORT HIGHWAY OPERATIONS CENTER (BOC) & SUPPORT OF ITS OPERATIONAL ACTIVITIES ALONG I-95 CORRIDOR & SOUTHERN PORTION OF I-395. :::: PROJECT DESCRIPTION: OPERATION OF DOT BRIDGEPORT HIGHWAY OPERATIONS CENTER (BOC) & SUPPORT OF ITS OPERATIONAL ACTIVITIES ALONG I-95 CORRIDOR & SOUTHERN PORTION OF I-395 CORRIDOR FOR THE TERM PERIOD 08/01/2026-07/31/2030. REPLACES DOT00150387HO. (OT) | $1,800,000 |
| Department of Transportation | PROJECT TITLE: HAMDEN - WALKABLE SIDEWALK PEDESTRIAN/BIKE IMPROVEMENTS AT VARIOUS LOCATIONS (CN). :::: PROJECT DESCRIPTION: HAMDEN - WALKABLE SIDEWALK PROJECT INCLUDES PEDESTRIAN/BIKE IMPROVEMENTS AT VARIOUS LOCATIONS ALONG AUGUR, BENHAM, DAVIS, & TREADWALL STREETS. IMPROVEMENTS INCLUDE SIDEWALKS, CROSSWALKS, ACCESSIBLE CURB RAMPS, SIGNAGE, AND ROADWAY RESTRIPING (CN). | $1,700,000 |
| Department of Transportation | PROJECT TITLE: REPLACE/UPGRADE CAMERAS, COMMUNICATIONS EQUIPMENT, AND FIBER OPTIC CABLE WITH MODERN EQUIPMENT ALONG I-95 FROM WEST HAVEN TO WESTBROOK. :::: PROJECT DESCRIPTION: REPLACE/UPGRADE CAMERAS, COMMUNICATIONS EQUIPMENT, AND FIBER OPTIC CABLE WITH MODERN EQUIPMENT ALONG I-95 FROM WEST HAVEN TO WESTBROOK TO IMPROVE PUBLIC SAFETY AND REDUCE CONGESTION AND EMISSIONS. (PD) | $1,530,000 |
| Department of Transportation | PROJECT TITLE: HARTFORD; TUNNEL TU06559 IMPROVEMENTS. :::: PROJECT DESCRIPTION: HARTFORD; REHABILITATION OF TUNNEL TU06559 CARRYING I-84 HARTFORD PLATFORM OVER I-84. THE TUNNEL IS COMPRISED OF TWO BRIDGES, BRIDGE NOS. 01426 (US 44/MAIN STREET OVER I-84) AND 01763 (TRUMBULL STREET OVER I-84), AND THREE PLATFORMS. (PD) | $1,436,985 |
| Department of Transportation | PROJECT TITLE: HAMDEN - WALKABLE SIDEWALK PEDESTRIAN/BIKE IMPROVEMENTS AT VARIOUS LOCATIONS (CN). :::: PROJECT DESCRIPTION: HAMDEN - WALKABLE SIDEWALK PROJECT INCLUDES PEDESTRIAN/BIKE IMPROVEMENTS AT VARIOUS LOCATIONS ALONG AUGUR, BENHAM, DAVIS, & TREADWALL STREETS. IMPROVEMENTS INCLUDE SIDEWALKS, CROSSWALKS, ACCESSIBLE CURB RAMPS, SIGNAGE, AND ROADWAY RESTRIPING (CN). | $1,422,953 |
| Department of Transportation | PROJECT TITLE: DIRECT PROCUREMENT/PURCHASE OF EQUIPMENT ASSOCIATED WITH THE DOT NEWINGTON HIGHWAY OPERATIONS CENTER (NHOC) AND OTHER ITS ACTIVITIES. :::: PROJECT DESCRIPTION: DIRECT PROCUREMENT/PURCHASE OF EQUIPMENT ASSOCIATED WITH THE DOT NEWINGTON HIGHWAY OPERATIONS CENTER (NHOC) AND OTHER INTELLIGENT TRANSPORTATION SYSTEMS (ITS) ACTIVITIES. PROJECT TERM IS 4 YEARS, 08/01/2018-07/31/2022. (OT) | $1,260,503 |
| Department of Transportation | PROJECT TITLE: SOUTHBURY; REPLACEMENT OF BRIDGE NO. 02437 CARRYING ROUTE 67 (SOUTHFORD ROAD) OVER SOUTH BRANCH BULLET HILL BROOK. :::: PROJECT DESCRIPTION: SOUTHBURY; REPLACEMENT OF BRIDGE NO. 02437 CARRYING ROUTE 67 (SOUTHFORD ROAD) OVER SOUTH BRANCH BULLET HILL BROOK AND ROADWAY IMPROVEMENTS IN VICINITY OF BRIDGE. REPLACEMENT OF TEMPORARY ACROW BRIDGE INSTALLED FOLLOWING AUGUST 2024 RAIN EVENT. | $1,200,000 |
| Department of Transportation | PROJECT TITLE: REPLACE/UPGRADE CAMERAS AND COMMUNICATIONS EQUIPMENT ALONG THE I-84 CORRIDOR FROM WATERBURY TO HARTFORD (CN). :::: PROJECT DESCRIPTION: REPLACEMENT/UPGRADE OF CAMERAS AND COMMUNICATIONS EQUIPMENT, ALONG THE I-84 CORRIDOR FROM WATERBURY TO HARTFORD AND ALONG THE ROUTE 8 CORRIDOR FROM NAUGATUCK TO WATERBURY, WITH MODERN EQUIPMENT ON TALLER CAMERA POLES WITH CAMERA LOWERING DEVICES (CN). | $1,000,000 |