ILLINOIS DEPARTMENT OF TRANSPORTATION
Total received in grants · trailing 12 months
$76M
$1for every U.S. household÷ 131M U.S. households
In perspective
0.0%of all $162.9B in tracked grants
20separate grants, trailing 12 months
ILLINOIS DEPARTMENT OF TRANSPORTATION has received $76M across 20 federal grants of $1M or more on record.
Data as of July 24, 2026. Source: USAspending.gov, prime contract awards $1M+. Federal spending data lags and has known gaps. This is not a real-time or complete record.
Grants by agency
Where this recipient’s grant dollars come from.
All grant awards
Swipe to see description and amount →
| Agency | Description | Amount |
|---|---|---|
| Department of Transportation | PROJECT TITLE: RESURFACING ON I-74/IL 110 FROM N OF WOODHULL TO N OF US 34 :::: PROJECT DESCRIPTION: RESURFACING ON I-74/IL 110 FROM N OF WOODHULL TO N OF US 34 | $23,815,238 |
| Department of Transportation | PROJECT TITLE: FY 2027 CHICAGO CMAP 3-C PL - FTA FUND OPERATIONS, IDOT FUNCTION P01 :::: PROJECT DESCRIPTION: FY 2027 CHICAGO CMAP 3-C PL - FTA FUND OPERATIONS, IDOT FUNCTION P01 | $6,036,294 |
| Department of Transportation | ARTERIAL STREET RESURFACING PROJECT #82-FAR SOUTH AREA | $5,897,181 |
| Department of Transportation | PROJECT TITLE: ARTERIAL STREET ADA RAMP IMPROVEMENT PROJECTS NOS 56 & 60 (CENTRAL AREA) :::: PROJECT DESCRIPTION: THE SCOPE OF THE WORK CONSIST OF THE CONSTRUCTION OF ADA RAMPS IN VARIOUS LOCATIONS IN THE CENTRAL AREA OF THE CITY OF CHICAGO | $4,825,194 |
| Department of Transportation | PROJECT TITLE: RESURFACING ON IL 100 FROM US 136 TO 0.4 MILE S OF THE SCHUYLER LINE. :::: PROJECT DESCRIPTION: RESURFACING ON IL 100 FROM US 136 TO 0.4 MILE S OF THE SCHUYLER LINE. | $4,399,410 |
| Department of Transportation | PROJECT TITLE: STANDARD OVERLAY, NEW SHOULDERS, MILLED RUMBLE STRIPS ON IL 37 FROM CAMPGROUND RD IN BONNIE TO I-64 & BRIDGE REPLACEMENT AT STREAM 5.2 MI S OF IL 148 :::: PROJECT DESCRIPTION: STANDARD OVERLAY, NEW SHOULDERS, MILLED RUMBLE STRIPS ON IL 37 FROM CAMPGROUND RD IN BONNIE TO I-64 & BRIDGE REPLACEMENT AT STREAM 5.2 MI S OF IL 148 | $3,807,000 |
| Department of Transportation | PROJECT TITLE: BRIDGE REHABILITATION ON US 45 OVER RAMSEY CREEK, 5.3 MILES S OF IL 37 AND OVER BISHOP CREEK, 5.0 MILES S OF IL 37. :::: PROJECT DESCRIPTION: BRIDGE REHABILITATION ON US 45 OVER RAMSEY CREEK, 5.3 MILES S OF IL 37 AND OVER BISHOP CREEK, 5.0 MILES S OF IL 37. | $2,909,022 |
| Department of Transportation | PROJECT TITLE: RESURFACING ON OLD RT 66 FROM IL 23 IN PONTIAC TO PRAIRIE ST IN ODELL. :::: PROJECT DESCRIPTION: RESURFACING ON OLD RT 66 FROM IL 23 IN PONTIAC TO PRAIRIE ST IN ODELL. | $2,746,075 |
| Department of Transportation | RESURFACING ON IL 140 FROM 0.1 MILE E OF MORELAND RD TO 0.2 MILE W OF IL 159. | $2,629,469 |
| Department of Transportation | PROJECT TITLE: LAND ACQUISITION FOR THE RECONSTRUCTION OF FAP 347 (IL 38 / EAST STATE ST.) FROM IL 25 TO KIRK ROAD IN THE CITY OF GENEVA. :::: PROJECT DESCRIPTION: LAND ACQUISITION FOR THE RECONSTRUCTION OF FAP 347 (IL 38 / EAST STATE ST.) FROM IL 25 TO KIRK ROAD IN THE CITY OF GENEVA | $2,400,000 |
| Department of Transportation | PROJECT TITLE: RESURFACING ON I-74/IL 110 FROM N OF WOODHULL TO N OF US 34 :::: PROJECT DESCRIPTION: RESURFACING ON I-74/IL 110 FROM N OF WOODHULL TO N OF US 34 | $2,373,667 |
| Department of Transportation | BRIDGE REHABILITATION | $1,965,466 |
| Department of Transportation | PROJECT TITLE: BRIDGE REPLACEMENT CARRYING FAS 263 (CH 5) OVER THE VERMILION RIVER, LOCATED 4.0 MILES EAST OF LEONORE. :::: PROJECT DESCRIPTION: REPLACE THE BRIDGE CARRYING FAS 263 (CH 5) OVER THE VERMILION RIVER, LOCATED 4.0 MILES EAST OF LEONORE. | $1,641,639 |
| Department of Transportation | PROJECT TITLE: VARIOUS STATEWIDE ENGINEERING FOR STRUCTURE PROJECTS - MAJOR RIVER BRIDGE INSPECTION :::: PROJECT DESCRIPTION: PHASE L/LL ENGINEERING SERVICES REQUIRED: PRIMARY PROJECTS ANTICIPATED TO INCLUDE NBIS & ELEMENT LEVEL INSPECTIONS OF MAJOR RIVER BRIDGES AND POSSIBLE TRAINING. LIMITED PROJECTS WILL INCLUDE DAMAGE INSPECTIONS & LOAD RATING INSPECTIONS. WORK INCLUDES BUT IS NOT LIMITED TO: PROVIDE APPROPRIATE BRIGE INSPECTION EQUIPMENT TO COMPLETE NBIS & ELEMENT LEVEL INSPECTIONS, DAMAGE INSPECTIONS, LOAD RATING INSPECTIONS & FIELD INVESTIGATIONS. ALSO THE CONSULTANT MAY BE REQUIRED TO PROVIDE THE APPROPRIATE TRAFFIC CONTROL, LOAD CAPACITY RATING OF EXISTING STRUCTURES. | $1,598,069 |
| Department of Transportation | RESURFACING ON US 30 FROM IL 40 TO 0.2 MILE EAST AND IL 40 FROM US 30 TO 0.4 MILE SOUTH, IN ROCK FALLS. | $1,584,086 |
| Department of Transportation | PROJECT TITLE: EMERGENCY VEHICLE OPERATION COURSE EXPANSION WITH GRADING AND PAVING AT ILLINOIS STATE POLICE TRAINING FACILITY AT 2510 ACADEMY RD IN PAWNEE. :::: PROJECT DESCRIPTION: EMERGENCY VEHICLE OPERATION COURSE EXPANSION WITH GRADING AND PAVING AT ILLINOIS STATE POLICE TRAINING FACILITY AT 2510 ACADEMY RD IN PAWNEE. | $1,571,100 |
| Department of Transportation | PROJECT TITLE: INSTALLATION OF NEW RAILROAD WARNING DEVICES ON WINTER RD AND BALDWIN RD AT KASKASKIA REGIONAL RAILROAD TRACKS IN ST CLAIR COUNTY, ST CLAIR :::: PROJECT DESCRIPTION: INSTALLATION OF AUTOMATIC FLASHING LED LIGHT SIGNALS WITH BELLS AND GATES CONTROLLED BY CONSTANT WARNING TIME CIRCUITRY WITH EVENT RECORDER AND REMOTE MONITOR SYSTEM AND CROSSING SURFACES ON WINTER RD (CH 49) AND BALDWIN RD (FAS 849) AT KASKASKIA REGIONAL PORT DISTRICT RAILROAD (KRPD) RAILROAD TRACKS IN ST CLAIR COUNTY, ST CLAIR COUNTY AAR/DOT # 933153F RR MP 0.38 AAR/DOT # 933157H RR MP 2.76 | $1,374,595 |
| Department of Transportation | PROJECT TITLE: BOX CULVERT REPLACEMENT ON IL 78 OVER THE THE DITCH 0.8 MI S OF WHITE OAK CREEK S OF HAVANA AND OVER THE DITCH 0.8 MI N OF ELM STREET IN BATH :::: PROJECT DESCRIPTION: BOX CULVERT REPLACEMENT ON IL 78 OVER THE THE DITCH 0.8 MI S OF WHITE OAK CREEK S OF HAVANA AND OVER THE DITCH 0.8 MI N OF ELM STREET IN BATH | $1,357,622 |
| Department of Transportation | PROJECT TITLE: BRIDGE PAINTING ON I-74 AT VARIOUS LOCATIONS IN VERMILION COUNTY. :::: PROJECT DESCRIPTION: BRIDGE PAINTING ON I-74 AT VARIOUS LOCATIONS IN VERMILION COUNTY. | $1,338,737 |
| Department of Transportation | BRIDGE REHABILITATION | $1,281,920 |