MISSOURI DEPARTMENT OF TRANSPORTATION

Total received in grants · trailing 12 months
$63M
vs. GOVERNOR'S AUTHORIZED REPRESENTATIVE ($39.0B), largest tracked grant recipient
$0for every U.S. household÷ 131M U.S. households
In perspective
0.0%of all $162.9B in tracked grants
15separate grants, trailing 12 months

MISSOURI DEPARTMENT OF TRANSPORTATION has received $63M across 15 federal grants of $1M or more on record.

Data as of July 24, 2026. Source: USAspending.gov, prime contract awards $1M+. Federal spending data lags and has known gaps. This is not a real-time or complete record.

Grants by agency

Where this recipient’s grant dollars come from.

All grant awards

Swipe to see description and amount →

AgencyDescriptionAmount
PROJECT TITLE: MO 47 S, LINCOLN, PAVEMENT RESURFACING, ADD CENTER TURN LANE FROM RTE. H TO BENNINGTON DRIVE, ADD SHOULDERS FROM 0.1 MILE WEST OF RTES. H AND J IN TRO :::: PROJECT DESCRIPTION: MO 47 S, LINCOLN, PAVEMENT RESURFACING, ADD CENTER TURN LANE FROM RTE. H TO BENNINGTON DRIVE, ADD SHOULDERS FROM 0.1 MILE WEST OF RTES. H AND J IN TROY TO RTES. A AND D IN HAWK POINT.
$15,678,609
PROJECT TITLE: ST LOUIS CITY CO, RT D, PAVEMENT RESURFACING FROM ST LOUIS CITY LIMITS TO TUCKER BLVD :::: PROJECT DESCRIPTION: ST LOUIS CITY CO, RT D, PAVEMENT RESURFACING FROM ST LOUIS CITY LIMITS TO TUCKER BLVD
$9,474,115
PROJECT TITLE: US 40 E, JACKSON, CORRIDOR IMPROVEMENTS AND SIGNAL UPGRADES FROM CLIFF AVENUE TO LITTLE BLUE PARKWAY. :::: PROJECT DESCRIPTION: US 40 E, JACKSON, CORRIDOR IMPROVEMENTS AND SIGNAL UPGRADES FROM CLIFF AVENUE TO LITTLE BLUE PARKWAY.
$8,693,124
PROJECT TITLE: IS 44 W, PULASKI, ADD AUXILIARY LANES FROM 1 MILE EAST OF RTE. H TO 0.1 MILE WEST OF SUPERIOR ROAD. :::: PROJECT DESCRIPTION: IS 44 W, PULASKI, ADD AUXILIARY LANES FROM 1 MILE EAST OF RTE. H TO 0.1 MILE WEST OF SUPERIOR ROAD.
$4,940,980
PROJECT TITLE: MO 11 S, ADAIR, PAVEMENT RESURFACING FROM RTE. 15 NEAR BARING TO RTE. 129 IN LINN COUNTY (THREE DISCONNECTED SECTIONS). :::: PROJECT DESCRIPTION: MO 11 S, ADAIR, PAVEMENT RESURFACING FROM RTE. 15 NEAR BARING TO RTE. 129 IN LINN COUNTY (THREE DISCONNECTED SECTIONS).
$4,308,162
PROJECT TITLE: MO 47 S, LINCOLN, PAVEMENT, SAFETY AND SHOULDER IMPROVEMENTS FROM 0.3 MILE WEST OF RTES. H AND J IN TROY TO RTES. A AND D IN HAWK POINT. :::: PROJECT DESCRIPTION: MO 47 S, LINCOLN, PAVEMENT, SAFETY AND SHOULDER IMPROVEMENTS FROM 0.3 MILE WEST OF RTES. H AND J IN TROY TO RTES. A AND D IN HAWK POINT.
$4,267,702
PROJECT TITLE: US 67 S, ST. LOUIS, PAVEMENT RESURFACING AND UPGRADE PEDESTRIAN FACILITIES FROM RTE. AC (NEW HALLS FERRY ROAD) TO 0.1 MILE EAST OF PATTERSON ROAD. :::: PROJECT DESCRIPTION: US 67 S, ST. LOUIS, PAVEMENT RESURFACING, REPLACE SIGNALS, GUARDRAIL AND UPGRADE PEDESTRIAN FACILITIES TO COMPLY WITH THE ADA TRANSITION PLAN FROM RTE. AC (NEW HALLS FERRY ROAD) TO 0.1 MILE EAST OF PATTERSON ROAD.
$3,062,872
PROJECT TITLE: IS 44 W, PULASKI, RAMP IMPROVEMENTS AT WESTBOUND ON-RAMP AT LOOP 44 IN ST. ROBERT. :::: PROJECT DESCRIPTION: IS 44 W, PULASKI, RAMP IMPROVEMENTS AT WESTBOUND ON-RAMP AT LOOP 44 IN ST. ROBERT.
$2,933,790
PROJECT TITLE: MO 47 S, LINCOLN, PAVEMENT RESURFACING, ADD CENTER TURN LANE FROM RTE. H TO BENNINGTON DRIVE, ADD SHOULDERS FROM 0.1 MILE WEST OF RTES. H AND J IN TRO :::: PROJECT DESCRIPTION: MO 47 S, LINCOLN, PAVEMENT RESURFACING, ADD CENTER TURN LANE FROM RTE. H TO BENNINGTON DRIVE, ADD SHOULDERS FROM 0.1 MILE WEST OF RTES. H AND J IN TROY TO RTES. A AND D IN HAWK POINT.
$1,841,000
PROJECT TITLE: IS 44 E, FRANKLIN, PAVEMENT RESURFACING, REPLACE SIGNAGE AND UPGRADE GUARDRAIL FROM 0.3 MILE WEST OF RTE. 185 TO RTE. 30. :::: PROJECT DESCRIPTION: IS 44 E, FRANKLIN, PAVEMENT RESURFACING, REPLACE SIGNAGE AND UPGRADE GUARDRAIL FROM 0.3 MILE WEST OF RTE. 185 TO RTE. 30.
$1,773,391
PROJECT TITLE: IS 49 S, VERNON, BRIDGE REHABILITATION OVER MISSOURI AND NORTHERN ARKANSAS RAILROAD IN NEVADA. :::: PROJECT DESCRIPTION: IS 49 S, VERNON, BRIDGE REHABILITATION OVER MISSOURI AND NORTHERN ARKANSAS RAILROAD IN NEVADA.
$1,500,000
PROJECT TITLE: RT OO E, CAPE GIRARDEAU, BRIDGE REPLACEMENT OVER WHITEWATER RIVER. :::: PROJECT DESCRIPTION: RT OO E, CAPE GIRARDEAU, BRIDGE REPLACEMENT OVER WHITEWATER RIVER.
$1,332,775
PROJECT TITLE: MO 164 E, DUNKLIN, BRIDGE REPLACEMENT OVER DEERING DRAINAGE DITCH AND LATERAL DITCH 4. :::: PROJECT DESCRIPTION: MO 164 E, DUNKLIN, BRIDGE REPLACEMENT OVER DEERING DRAINAGE DITCH AND LATERAL DITCH 4.
$1,202,374
PROJECT TITLE: JASPER CO; BRIDGE REPLACEMENT 1 MILE SOUTH OF RTE. N. :::: PROJECT DESCRIPTION: JASPER CO; BRIDGE REPLACEMENT 1 MILE SOUTH OF RTE. N.
$1,026,743
PROJECT TITLE: US 50 E, JOHNSON, BRIDGE REHABILITATION OVER CLEAR FORK CREEK, 1.3 MILES WEST OF RTE. 23 AND 0.9 MILE EAST OF 175TH STREET. :::: PROJECT DESCRIPTION: US 50 E, JOHNSON, BRIDGE REHABILITATION OVER CLEAR FORK CREEK, 1.3 MILES WEST OF RTE. 23 AND 0.9 MILE EAST OF 175TH STREET.
$1,005,928