MONTANA DEPARTMENT OF TRANSPORTATION
Total received in grants · trailing 12 months
$110M
$1for every U.S. household÷ 131M U.S. households
In perspective
0.1%of all $162.9B in tracked grants
16separate grants, trailing 12 months
MONTANA DEPARTMENT OF TRANSPORTATION has received $110M across 16 federal grants of $1M or more on record.
Data as of July 24, 2026. Source: USAspending.gov, prime contract awards $1M+. Federal spending data lags and has known gaps. This is not a real-time or complete record.
Grants by agency
Where this recipient’s grant dollars come from.
All grant awards
Swipe to see description and amount →
| Agency | Description | Amount |
|---|---|---|
| Department of Transportation | PROJECT TITLE: BBP-JOHNSON LANE INTERCHANGE (CN & CE) MULTIPLE ROUTES, YELLOWSTONE COUNTY, RECONSTRUCTION OF AN URBAN INTERCHANGE AT VARIOUS LOCATIONS :::: PROJECT DESCRIPTION: CONSTRUCTION PROJECT FOR THE RECONSTRUCTION OF AN EXISTING URBAN INTERCHANGE WITH PRESTRESSED CONCRETE BRIDGE STRUCTURES TO INCLUDE GRADING, GRAVEL, STORM WATER COLLECTION, PLANT MIX BITUMINOUS SURFACING, P.C.C.P. CONCRETE PAVEMENT, STRUCTURAL CONCRETE, CONCRETE BRIDGE DECKING, LIGHTING, SIGNING, PAVEMENT MARKINGS, TRAFFIC SIGNALS, AND OTHER IMPROVEMENTS FOR A SEGMENT OF THE BILLINGS BYPASS AT THE JOHNSON LANE INTERCHANGE. THE PROJECT IS LOCATED IN YELLOWSTONE COUNTY WITHIN BILLINGS URBAN LIMITS ON MULTIPLE ROUTES/ADJACENT ROADWAYS. | $26,157,039 |
| Department of Transportation | PROJECT TITLE: DAR STRUCTURES - CP#1 (CN & CE) MULTIPLE ROUTES/COUNTIES, BRIDGE REPLACEMENT AT VARIOUS LOCATIONS :::: PROJECT DESCRIPTION: CONSTRUCTION PROJECT FOR BRIDGE REPLACEMENT INCLUDES CULVERTS AND MINOR APPROACH WORK. THIS IS A SPLIT PROJECT, CP#1, PHASE 1 OF 2 AND IS LOCATED IN MULTIPLE COUNTIES ON MULTIPLE ROUTES WITHIN THE BILLINGS DISTRICT. | $16,864,062 |
| Department of Transportation | PROJECT TITLE: COUGAR CR-7M N W YELLOWSTONE (CN & CE) NATIONAL HIGHWAY 50, GALLATIN COUNTY, REPLACE THE STRUCTURE FROM REFERENCE POINT 7.4 TO 7.8 :::: PROJECT DESCRIPTION: CONSTRUCTION PROJECT TO REPLACE BOTH THE EXISTING HIGHWAY STRUCTURE AND RECREATION BRIDGE OVER COUGAR CREEK WITH TWO NEW SEPARATE BRIDGES INCLUDES THE NECESSARY APPROACH WORK AND APPROACH GUARDRAILS AS NEEDED. THIS PROJECT IS LOCATED IN GALLATIN COUNTY ON NATIONAL HIGHWAY ROUTE 50/US 191/US-287 FROM REFERENCE POINT 7.4 TO 7.8. | $11,410,700 |
| Department of Transportation | PROJECT TITLE: BBP-JOHNSON LANE INTERCHANGE (CN & CE) MULTIPLE ROUTES, YELLOWSTONE COUNTY, RECONSTRUCTION OF AN URBAN INTERCHANGE AT VARIOUS LOCATIONS :::: PROJECT DESCRIPTION: CONSTRUCTION PROJECT FOR THE RECONSTRUCTION OF AN EXISTING URBAN INTERCHANGE WITH PRESTRESSED CONCRETE BRIDGE STRUCTURES TO INCLUDE GRADING, GRAVEL, STORM WATER COLLECTION, PLANT MIX BITUMINOUS SURFACING, P.C.C.P. CONCRETE PAVEMENT, STRUCTURAL CONCRETE, CONCRETE BRIDGE DECKING, LIGHTING, SIGNING, PAVEMENT MARKINGS, TRAFFIC SIGNALS, AND OTHER IMPROVEMENTS FOR A SEGMENT OF THE BILLINGS BYPASS AT THE JOHNSON LANE INTERCHANGE. THE PROJECT IS LOCATED IN YELLOWSTONE COUNTY WITHIN BILLINGS URBAN LIMITS ON MULTIPLE ROUTES/ADJACENT ROADWAYS. | $10,100,000 |
| Department of Transportation | PROJECT TITLE: STATEWIDE PLANNING - 2026 (SPR) STATEWIDE, ACTIVITIES ASSOCIATED WITH THE FEDERAL FISCAL YEAR 2026 ANNUAL WORK PROGRAM :::: PROJECT DESCRIPTION: OTHER ACTIVITIES FOR 2026 STATEWIDE PLANNING PROGRAM; ACTIVITIES ALIGN WITH THE FEDERAL FISCAL YEAR AND INCLUDE SYSTEM IMPACT ANALYSIS, TRAFFIC DATA COLLECTION & ANALYSIS, GEOSPATIAL INFORMATION, FISCAL PROGRAMMING, PROJECT ANALYSIS, ALTERNATIVE FUNDING, STATEWIDE & URBAN TRANSPORTATION MANAGEMENT, LOCAL STUDIES & TRANSPORTATION PLANS, CORRIDOR STUDIES, URBANIZED AREAS, INTEGRATED TRANSPORTATION & PUBLICATION, AND STATEWIDE COMPREHENSIVE HIGHWAY SAFETY PLAN ACTIVITIES (AS OUTLINED IN THE ANNUAL SPR-PL WORK PLAN). THE PERFORMANCE PERIOD IS OCTOBER 1, 2025 TO SEPTEMBER 30, 2026. THIS PROGRAM IS STATEWIDE IN MONTANA. | $9,465,286 |
| Department of Transportation | PROJECT TITLE: BBP-JOHNSON LANE INTERCHANGE (CN & CE) MULTIPLE ROUTES, YELLOWSTONE COUNTY, RECONSTRUCTION OF AN URBAN INTERCHANGE AT VARIOUS LOCATIONS :::: PROJECT DESCRIPTION: CONSTRUCTION PROJECT FOR THE RECONSTRUCTION OF AN EXISTING URBAN INTERCHANGE WITH PRESTRESSED CONCRETE BRIDGE STRUCTURES TO INCLUDE GRADING, GRAVEL, STORM WATER COLLECTION, PLANT MIX BITUMINOUS SURFACING, P.C.C.P. CONCRETE PAVEMENT, STRUCTURAL CONCRETE, CONCRETE BRIDGE DECKING, LIGHTING, SIGNING, PAVEMENT MARKINGS, TRAFFIC SIGNALS, AND OTHER IMPROVEMENTS FOR A SEGMENT OF THE BILLINGS BYPASS AT THE JOHNSON LANE INTERCHANGE. THE PROJECT IS LOCATED IN YELLOWSTONE COUNTY WITHIN BILLINGS URBAN LIMITS ON MULTIPLE ROUTES/ADJACENT ROADWAYS. | $8,102,408 |
| Department of Transportation | PROJECT TITLE: RED LODGE AREA FLOOD REPAIRS (CN & CE) MULTIPLE ROUTES/COUNTIES, RECONSTRUCT EXISTING ROADWAYS AT MULTIPLE LOCATIONS :::: PROJECT DESCRIPTION: CONSTRUCTION ACTIVITIES REQUIRED FOR FUTURE RECONSTRUCTION OF EXISTING ROADWAYS INCLUDES BANK STABILIZATION ACTIVITIES AND RESTORATION OF RETAINING WALLS, ROADWAYS, SIDEWALKS, CURB & GUTTER, GUARDRAIL, STORM DRAINS, SIGNS AND OTHER MISCELLANEOUS DAMAGED ROADWAY FEATURES. THIS PROJECT IS LOCATED IN MULTIPLE COUNTIES ON MULTIPLE ROUTES. | $6,121,701 |
| Department of Transportation | PROJECT TITLE: WHITE SULPHUR SPRINGS-SOUTH (CN & CE) MULTIPLE ROUTES, MEAGHER COUNTY, RESURFACE ROADWAY FROM AT VARIOUS LOCATIONS :::: PROJECT DESCRIPTION: CONSTRUCTION PROJECT FOR RESURFACING ON THE EXISTING ROADWAY INCLUDES MILL AND OVERLAY, SEAL AND COVER, BRIDGE DECK CRACK SEAL, GUARDRAIL, RUMBLE STRIPS, PAVEMENT MARKINGS, DELINEATION, AND SIGNING. THIS PROJECT IS LOCATED IN MEAGHER COUNTY ON MULTIPLE ROUTES AT VARIOUS LOCATIONS. | $3,626,819 |
| Department of Transportation | PROJECT TITLE: BBP-JOHNSON LANE INTERCHANGE (CN & CE) MULTIPLE ROUTES, YELLOWSTONE COUNTY, RECONSTRUCTION OF AN URBAN INTERCHANGE AT VARIOUS LOCATIONS :::: PROJECT DESCRIPTION: CONSTRUCTION PROJECT FOR THE RECONSTRUCTION OF AN EXISTING URBAN INTERCHANGE WITH PRESTRESSED CONCRETE BRIDGE STRUCTURES TO INCLUDE GRADING, GRAVEL, STORM WATER COLLECTION, PLANT MIX BITUMINOUS SURFACING, P.C.C.P. CONCRETE PAVEMENT, STRUCTURAL CONCRETE, CONCRETE BRIDGE DECKING, LIGHTING, SIGNING, PAVEMENT MARKINGS, TRAFFIC SIGNALS, AND OTHER IMPROVEMENTS FOR A SEGMENT OF THE BILLINGS BYPASS AT THE JOHNSON LANE INTERCHANGE. THE PROJECT IS LOCATED IN YELLOWSTONE COUNTY WITHIN BILLINGS URBAN LIMITS ON MULTIPLE ROUTES/ADJACENT ROADWAYS. | $3,480,040 |
| Department of Transportation | PROJECT TITLE: SEELEY LAKE - N & S (CN & CE) PRIMARY ROUTE 83, MISSOULA COUNTY, RESURFACING THE ROADWAY AT VARIOUS REFERENCE POINTS :::: PROJECT DESCRIPTION: CONSTRUCTION PROJECT FOR THE RESURFACING OF THE EXISTING ROADWAY INCLUDES CRACK FILING AND SEALING, SEAL & COVER, AND FOG SEAL, ASPHALT REPLACEMENT AND OVERLAY, COLD MILL, PAVEMENT MARKINGS, AND CENTERLINE RUMBLE STRIPS. THIS PROJECT IS LOCATED IN MISSOULA COUNTY ON STATE PRIMARY ROUTE 83 AT VARIOUS REFERENCE POINTS. | $2,895,168 |
| Department of Transportation | PROJECT TITLE: GREYCLIFF REST AREA REHAB (CN & CE) INTERSTATE 90, SWEET GRASS COUNTY, WASTEWATER TREATMENT UPGRADE FROM REFERENCE POINT 380.5 TO 381.5 :::: PROJECT DESCRIPTION: CONSTRUCTION PROJECT FOR WASTEWATER TREATMENT FACILITY UPGRADES AT THE GREYCLIFF REST AREA. THIS PROJECT IS LOCATED IN SWEET GRASS COUNTY ADJACENT TO NATIONAL HIGHWAY INTERSTATE ROUTE 90 FROM REFERENCE POINT 380.5 TO 381.5. | $2,550,798 |
| Department of Transportation | PROJECT TITLE: MISSOURI RIVER - BRIDGE DECK (CN & CE) NATIONAL HIGHWAY 61, MULTIPLE COUNTIES, REHABILITATE BRIDGE DECKS FROM REFERENCE POINT 86.3 TO 88.3 :::: PROJECT DESCRIPTION: CONSTRUCTION PROJECT FOR THE REHABILITATION OF BRIDGE DECK CONDITIONS INCLUDES APPROACH AND DRAINAGE WORK. THIS PROJECT IS LOCATED IN MULTIPLE COUNTIES ON NATIONAL HIGHWAY ROUTE 61 FROM REFERENCE POINT 86.3 TO 88.3. | $2,335,665 |
| Department of Transportation | PROJECT TITLE: LOCKWOOD INTERCHANGE-BILLINGS (PE) MULTIPLE ROUTES, YELLOWSTONE COUNTY, RECONSTRUCT INTERCHANGE FROM VARIOUS REFERENCE POINTS :::: PROJECT DESCRIPTION: PRELIMINARY ENGINEERING ACTIVITIES REQUIRED FOR FUTURE RECONSTRUCTION OF THE INTERCHANGE INCLUDES REMOVAL/REPLACEMENT OF EXISTING STRUCTURES, LANE WIDENING, RAMP IMPROVEMENTS. THIS PROJECT IS LOCATED IN YELLOWSTONE COUNTY WITHIN BILLINGS URBAN LIMITS ON MULTIPLE ROUTES FROM VARIOUS REFERENCE POINTS. | $2,154,496 |
| Department of Transportation | PROJECT TITLE: RED LODGE AREA FLOOD REPAIRS (CN & CE) MULTIPLE ROUTES/COUNTIES, RECONSTRUCT EXISTING ROADWAYS AT MULTIPLE LOCATIONS :::: PROJECT DESCRIPTION: CONSTRUCTION ACTIVITIES REQUIRED FOR FUTURE RECONSTRUCTION OF EXISTING ROADWAYS INCLUDES BANK STABILIZATION ACTIVITIES AND RESTORATION OF RETAINING WALLS, ROADWAYS, SIDEWALKS, CURB & GUTTER, GUARDRAIL, STORM DRAINS, SIGNS AND OTHER MISCELLANEOUS DAMAGED ROADWAY FEATURES. THIS PROJECT IS LOCATED IN MULTIPLE COUNTIES ON MULTIPLE ROUTES. | $2,149,441 |
| Department of Transportation | PROJECT TITLE: MONTANA STREET - DILLON (CN & CE) PRIMARY ROUTE 89, BEAVERHEAD COUNTY, REHABILITATE THE ROADWAY FROM 1.7 TO 2.5 :::: PROJECT DESCRIPTION: CONSTRUCTION PROJECT FOR THE REHABILITATION OF THE EXISTING ROADWAY INCLUDES MILL AND OVERLAY, ADA SIDEWALK UPGRADES, SIGNING AND PAVEMENT MARKING UPGRADES ON THE MONTANA STREET IN DILLON. THIS PROJECT IS LOCATED IN BEAVERHEAD COUNTY ON STATE PRIMARY ROUTE 89 FROM REFERENCE POINT 1.7 TO 2.5. | $1,447,320 |
| Department of Transportation | PROJECT TITLE: US-2 EROSION REPAIR-HAVRE (CN & CE) NATIONAL HIGHWAY 1, HILL COUNTY, REPAIR EROSION DAMAGE AND SAFETY IMPROVEMENTS FROM REFERENCE POINT 375.8 TO 376.4 :::: PROJECT DESCRIPTION: CONSTRUCTION PROJECT TO REPAIR FLOOD DAMAGE AND PROVIDE LONG-TERM DRAINAGE FACILITIES, INCLUDES RE-GRADING THE ROADSIDE DITCH WITH A NEW OUTFALL TO BIG SANDY CREEK AND TWO NEW APPROACHES. THIS PROJECT IS LOCATED IN HILL COUNTY ON NATIONAL HIGHWAY ROUTE 1/US-2 FROM REFERENCE POINT 375.8 TO 376.4. | $1,312,972 |