NATIVE VILLAGE OF OUZINKIE

Total received in grants · trailing 12 months
$3.8M
vs. GOVERNOR'S AUTHORIZED REPRESENTATIVE ($39.0B), largest tracked grant recipient
$0for every U.S. household÷ 131M U.S. households
In perspective
0.0%of all $162.9B in tracked grants
2separate grants, trailing 12 months

NATIVE VILLAGE OF OUZINKIE has received $3.8M across 2 federal grants of $1M or more on record.

Data as of July 24, 2026. Source: USAspending.gov, prime contract awards $1M+. Federal spending data lags and has known gaps. This is not a real-time or complete record.

Grants by agency

Where this recipient’s grant dollars come from.

All grant awards

Swipe to see description and amount →

AgencyDescriptionAmount
THIS PROJECT SEEKS TO CONSTRUCT A 160 KW SOLAR PV ARRAY AND 210 KWH BATTERY ENERGY STORAGE SYSTEM FOR A MICROGRID FOR THE NATIVE VILLAGE OF OUZINKIE ON SPRUCE ISLAND, ALASKA. THE PROPOSED SOLAR AND BATTERY SYSTEM IS THE MOST COST-EFFECTIVE AND LOW-MAINTENANCE RENEWABLE ENERGY OPTION FOR THIS COMMUNITY. THIS MAKES IT THE BEST FIT TO MEET THE GEOGRAPHIC, ECONOMIC, AND CULTURAL NEEDS OF OUZINKIE’S ROUGHLY 128 RESIDENTS, WHO ENGAGE IN SUBSISTENCE LIFESTYLES THAT INCLUDE SEASONAL FISHING, HUNTING, AND BERRY PICKING, AS THERE IS NO GROCERY STORE ON SPRUCE ISLAND. FOR THESE RESOURCES TO LAST DURING SEASONAL LOWS, MODERN REFRIGERATION AND STABLE ELECTRICITY ARE VITAL. THE BATTERY ENERGY STORAGE SYSTEM PLANS TO PROVIDE RELIABLE, RESILIENT, BACK-UP POWER DURING SEVERE WEATHER AND MAINTENANCE OUTAGES, REDUCING DIESEL USE, IN ADDITION TO AIR AND NOISE POLLUTION. USING LESS DIESEL FUEL WILL DECREASE THE POTENTIAL INCIDENCE OF SPILLS AND CONTAMINATION OF THE ENVIRONMENT BY PETROLEUM PRODUCTS, WHICH HARM MARINE ECOSYSTEMS ON WHICH OUZINKIE RESIDENTS DEPEND FOR FOOD. THE PROJECT ALSO EXPECTS TO REDUCE ELECTRICITY COSTS BY AN ESTIMATED 10% AND TO GENERATE REVENUE THAT COULD SUBSIDIZE WATER AND SEWER BILLS. ADDITIONALLY, THE NATIVE VILLAGE OF OUZINKIE WILL PARTNER WITH THE ALASKA NATIVE TRIBAL HEALTH CONSORTIUM, THE STATE’S LARGEST NONPROFIT, TO PROVIDE PROJECT SUPPORT INCLUDING ONSITE TRAINING ON OPERATIONS AND MAINTENANCE.
$2,285,774
BIPARTISAN INFRASTRUCTURE LAW (BIL) – PREVENTING OUTAGES AND ENHANCING THE RESILIENCE OF THE ELECTRIC GRID FORMULA GRANTS TO STATES AND INDIAN TRIBES. THE OBJECTIVE OF THIS PROJECT IS TO IMPROVE THE RESILIENCE OF THE ELECTRIC GRID AGAINST DISRUPTIVE EVENTS.
$1,491,997