NEW MEXICO DEPARTMENT OF TRANSPORTATION
Total received in grants · trailing 12 months
$84M
$1for every U.S. household÷ 131M U.S. households
In perspective
0.1%of all $162.9B in tracked grants
16separate grants, trailing 12 months
NEW MEXICO DEPARTMENT OF TRANSPORTATION has received $84M across 16 federal grants of $1M or more on record.
Data as of July 24, 2026. Source: USAspending.gov, prime contract awards $1M+. Federal spending data lags and has known gaps. This is not a real-time or complete record.
Grants by agency
Where this recipient’s grant dollars come from.
All grant awards
Swipe to see description and amount →
| Agency | Description | Amount |
|---|---|---|
| Department of Transportation | PROJECT TITLE: PAVEMENT REHAB :::: PROJECT DESCRIPTION: MILL AND INLAY TRAVEL LANES & SHOULDERS | $11,721,356 |
| Department of Transportation | PROJECT TITLE: BORDER HIGHWAY CONNECTOR (BHC) PRELIMINARY ENGINEERING PHASE :::: PROJECT DESCRIPTION: 'DEVELOPING THE BORDER HIGHWAY CONNECTOR (BHC) LOCATION AND CORRIDOR ALIGNMENT STUDY IS NMDOT'S PROCESS TO PLAN, DESIGN, IDENTIFY IMPACTS AND ACQUIRE RIGHT OF WAY NEEDED TO CONSTRUCT A NEW ROADWAY CORRIDOR BETWEEN THE EXISTING NM 136 CORRIDOR TO THE EXISTING NM 273 (MCNUTT RD). THE STUDY IS LOOKING AT POSSIBLE ALIGNMENTS FOR THE CONNECTOR TO CONNECT THE CITY OF SUNLAND PARK TO THE SANTA TERESA PORT OF ENTRY ON NM 136. STUDY AREA COVERS FROM THE US/MEXICO BORDER NORTH TO THE NM 136/DONA ANA COUNTY ROAD A002 INTERSECTION AND ACROSS THE SECTION EAST TO NM 273 (MCNUTT RD).' | $10,616,774 |
| Department of Transportation | PROJECT TITLE: ROSWELL RELIEF ROUTE (US 285) REHABILITATION MP 0 -8 :::: PROJECT DESCRIPTION: MAJOR PAVEMENT REHABILITATION ON US 285, ROSWELL RELIEF ROUTE FROM MP 0 - MP 8 | $8,387,370 |
| Department of Transportation | PROJECT TITLE: DOWNTOWN CLOVIS RECONSTRUCTION PROJECT :::: PROJECT DESCRIPTION: ROADWAY RECONSTRUCTION, DRAINAGE & INTERSECTION IMPROVEMENTS | $7,709,049 |
| Department of Transportation | PROJECT TITLE: BRIDGE DECK IMPROVEMENT ON BRIDGES 6844, 6845 ON I-25 MP 70.55 - 72.85 :::: PROJECT DESCRIPTION: APPLYING A BRIDGE DECK OVERLAY ON BRIDGES 6844, 6845 ON I-25 MP 70.55 - 72.85 | $7,307,486 |
| Department of Transportation | PROJECT TITLE: I 25, PAVEMENT IMPROVEMENT PROJECT :::: PROJECT DESCRIPTION: MILL AND INLAY | $6,281,771 |
| Department of Transportation | PROJECT TITLE: I-25/ENGLER INTERCHANGE RAMP CONSTRUCTION FROM MP 6-8.3 :::: PROJECT DESCRIPTION: I-25/ENGLER INTERCHANGE RAMP CONSTRUCTION, INCLUDING GUARDRAIL REPLACEMENT, DRAINAGE IMPROVEMENTS, LIGHTING, AND ITS SIGNS AND CAMERA REPLACEMENTS FROM MP 6-8.3 | $5,748,454 |
| Department of Transportation | PROJECT TITLE: I-25/ENGLER INTERCHANGE RAMP CONSTRUCTION FROM MP 6-8.3 :::: PROJECT DESCRIPTION: I-25/ENGLER INTERCHANGE RAMP CONSTRUCTION, INCLUDING GUARDRAIL REPLACEMENT, DRAINAGE IMPROVEMENTS, LIGHTING, AND ITS SIGNS AND CAMERA REPLACEMENTS FROM MP 6-8.3 | $5,098,618 |
| Department of Transportation | PROJECT TITLE: NOGAL CANYON :::: PROJECT DESCRIPTION: BRIDGE REPLACEMENT | $4,697,134 |
| Department of Transportation | PROJECT TITLE: NM 68, US 64 FROM LA POSTA RD. NORTH TO CAMINO DE LA PLACITAS (NORTH) IN THE TOWN OF TAOS -, ALIGNMENT STUDY :::: PROJECT DESCRIPTION: RECONSTRUCTION WITH ADDED CAPACITY | $4,439,710 |
| Department of Transportation | PROJECT TITLE: I-25 PAVEMENT PREVENTATIVE MAINTENANCE. FROM GARFIELD EXIT TO ARREY/DERRY MP 41-59 :::: PROJECT DESCRIPTION: PREVENTATIVE MAINTENANCE -CRACK SEAL (F1A) AND FOG SEAL (F1B) ON I-25 FROM GARFIELD EXIT TO ARREY/DERRY MP 41-59 | $3,677,680 |
| Department of Transportation | PROJECT TITLE: I-25/ENGLER INTERCHANGE RAMP CONSTRUCTION FROM MP 6-8.3 :::: PROJECT DESCRIPTION: I-25/ENGLER INTERCHANGE RAMP CONSTRUCTION, INCLUDING GUARDRAIL REPLACEMENT, DRAINAGE IMPROVEMENTS, LIGHTING, AND ITS SIGNS AND CAMERA REPLACEMENTS FROM MP 6-8.3 | $2,277,038 |
| Department of Transportation | PROJECT TITLE: NM 68- OHKAY OWINGEH :::: PROJECT DESCRIPTION: RECONSTRUCTION | $1,857,689 |
| Department of Transportation | PROJECT TITLE: NM 68-ALCALDE PAVEMENT PRESERVATION/REHABILITATION :::: PROJECT DESCRIPTION: ROADWAY RECONSTRUCTION AND BRIDGE REPLACEMENT AND REHAB | $1,677,874 |
| Department of Transportation | PROJECT TITLE: REPLACEMENT OF BRIDGE 3485 ON NM 91 MP .76 - .88 OVER EL RITO CREEK :::: PROJECT DESCRIPTION: REMOVE AND REPLACE THE ENTIRE BRIDGE 3485 OVER EL RITO CREEK ON NM 91 MP .76 - .88 | $1,452,480 |
| Department of Transportation | PROJECT TITLE: I-25 WATROUS GAME FENCE CONSTRUCTION FROM MP 361.5 - 368.88 :::: PROJECT DESCRIPTION: 'CONSTRUCTION OF 8-FOOT TALL GAME FENCING ALONG WITH ESCAPE RAMPS, GAME GUARDS AND PERMANENT SIGNING ALONG I-25 FROM MP 361.5 - 368.88' | $1,059,129 |