TRANSPORTATION, DELAWARE DEPARTMENT OF
Total received in grants · trailing 12 months
$58M
$0for every U.S. household÷ 131M U.S. households
In perspective
0.0%of all $162.9B in tracked grants
13separate grants, trailing 12 months
TRANSPORTATION, DELAWARE DEPARTMENT OF has received $58M across 13 federal grants of $1M or more on record.
Data as of July 24, 2026. Source: USAspending.gov, prime contract awards $1M+. Federal spending data lags and has known gaps. This is not a real-time or complete record.
Grants by agency
Where this recipient’s grant dollars come from.
All grant awards
Swipe to see description and amount →
| Agency | Description | Amount |
|---|---|---|
| Department of Transportation | PROJECT TITLE: REALIGNMENT OF OLD ORCHARD ROAD AT WESCOATS CORNER :::: PROJECT DESCRIPTION: THIS PROJECT INCLUDES REALIGNING S269A (OLD ORCHARD ROAD) TO INTERSECT SAVANNAH ROAD OPPOSITE S268A (WESCOATS ROAD). PEDESTRIAN AND BICYCLE FACILITIES WILL BE INCORPORATED. | $10,930,328 |
| Department of Transportation | PROJECT TITLE: PAVEMENT & REHABILITATION, SUSSEX I, (US 13 NB & SB, DELMAR TO LAUREL), 2026 :::: PROJECT DESCRIPTION: THIS CONTRACT WILL CONSIST OF 2' MILLING, PCC PATCHING, 2' TYPE C OVERLAY, GUARDRAIL AND CURB RAMP UPGRADES, PAVEMENT MARKINGS, AND AN EXTENSION OF THE LEFT TURN LANE FROM SB US 13 TO SR 24 | $9,981,307 |
| Department of Transportation | PROJECT TITLE: US13 PAVING AND PEDESTRIAN IMPROVEMENTS - LLANGOLLEN BLVD TO BACON-BOULDEN BLVD – CMAQ :::: PROJECT DESCRIPTION: THIS PROJECT INCLUDES IMPROVEMENTS TO ADDRESS MULTI-MODAL NEEDS AND PAVEMENT REHABILITATION IN THIS HIGHLY TRAVELED SECTION OF US 13 BETWEEN US40 AND BOULDEN BLVD. THE PROPOSED IMPROVEMENTS INCLUDE ADA COMPLIANT SIDEWALKS, IMPROVED CROSSINGS, MEDIAN LIGHTING, MEDIAN BARRIERS TO DISCOURAGE MID-BLOCK CROSSINGS AND REDUCED LANE WIDTHS ALONG THE ROAD. | $9,500,286 |
| Department of Transportation | PROJECT TITLE: US13 PAVING AND PEDESTRIAN IMPROVEMENTS - LLANGOLLEN BLVD TO BACON-BOULDEN BLVD – CMAQ :::: PROJECT DESCRIPTION: THIS PROJECT INCLUDES IMPROVEMENTS TO ADDRESS MULTI-MODAL NEEDS AND PAVEMENT REHABILITATION IN THIS HIGHLY TRAVELED SECTION OF US 13 BETWEEN US40 AND BOULDEN BLVD. THE PROPOSED IMPROVEMENTS INCLUDE ADA COMPLIANT SIDEWALKS, IMPROVED CROSSINGS, MEDIAN LIGHTING, MEDIAN BARRIERS TO DISCOURAGE MID-BLOCK CROSSINGS AND REDUCED LANE WIDTHS ALONG THE ROAD. | $5,021,431 |
| Department of Transportation | PROJECT TITLE: PAVEMENT & REHABILITATION, NORTH II, (PA AVE, BAYNARD BLVD, RAMP 6414), 2025 :::: PROJECT DESCRIPTION: 2' BITUMINOUS MILLING; BITUMINOUS PATCHING; 2' TYPE C OVERLAY; GUARDRAIL; PAVEMENT MARKINGS | $4,714,037 |
| Department of Transportation | PROJECT TITLE: PAVEMENT REHABILITATION, NEW CASTLE 5A, (KIRKWOOD HIGHWAY) :::: PROJECT DESCRIPTION: 2' PAVEMENT MILLING BITUMINOUS; PCC PATCHING; 2' TYPE C 76-22 OVERLAY; ADA IMPROVEMENTS, GUARDRAIL IMPROVEMENTS; SIGNING AND PAVEMENT MARKINGS | $3,945,454 |
| Department of Transportation | PROJECT TITLE: PAVEMENT REHABILITATION, NEW CASTLE 5A, (KIRKWOOD HIGHWAY) :::: PROJECT DESCRIPTION: 2' PAVEMENT MILLING BITUMINOUS; PCC PATCHING; 2' TYPE C 76-22 OVERLAY; ADA IMPROVEMENTS, GUARDRAIL IMPROVEMENTS; SIGNING AND PAVEMENT MARKINGS | $2,757,104 |
| Department of Transportation | PROJECT TITLE: US 113 WIDENING, DAGSBORO ROAD TO HARDSCRABBLE ROAD :::: PROJECT DESCRIPTION: THIS PROJECT WILL ADD AN ADDITIONAL THROUGH LANE BOTH NORTHBOUND AND SOUTHBOUND THROUGH THE TOWN OF MILLSBORO FROM HARDSCRABBLE ROAD TO DAGSBORO ROAD. CROSSOVER MODIFICATIONS ALONG US 113 WILL BE MADE THROUGHOUT THE PROJECT LIMITS. MULTIMODAL FACILITIES WILL ALSO BE INCORPORATED. | $2,531,752 |
| Department of Transportation | PROJECT TITLE: FY25 INTERSECTION IMPROVEMENT PROGRAM PART I :::: PROJECT DESCRIPTION: INTERSECTION IMPROVEMENTS OF VARIOUS TYPES INCLUDING, BUT ARE NOT LIMITED TO: TRAFFIC CONTROL SYSTEM MODIFICATIONS, NEW TRAFFIC CONTROL SYSTEMS, ALL-WAY STOPS, PEDESTRIAN ENHANCEMENTS, AUXILIARY LANE IMPROVEMENTS, ROADWAY LIGHTING, AND OTHER DEVICES. ACCORDING TO 120(C)(1) FEDERAL CODE, FHWA WILL PARTICIPATE AT 100% FEDERAL FUNDING FOR TRAFFIC CONTROL SIGNALIZATION. INDIVIDUAL LOCATIONS: N475 - SR 58/CHURCHMANS RD AND DELTECH ENTRANCE SR 20 AND JOHNSON ROAD SR273/DELAWARE ST & 9TH STREET SR273/FERRY CUTOFF & DELAWARE STREET SR273/DELAWARE STREET - SCHOOL REHOBOTH BLVD, MILFORD SR 54 AND MALLARD LAKES SR 7, SR 41, AND SR 48 SR 4/7 AND OLD ROUTE 4 AND SR 4/7 AND ROAD N336F US40 AND PLEASANT VALLEY ROAD US 13 AT LEPORE ROAD MCKENNANS CHURCH RD AND MILL CREEK ROAD MARSH ROAD AT FORWOOD MANOR TELEGRAPH ROAD SR 9 AND ROGERS ROAD SR16 AND SR36 | $2,390,425 |
| Department of Transportation | PROJECT TITLE: PAVEMENT AND REHABILITATION, NORTH II, 2024 :::: PROJECT DESCRIPTION: 2' BITUMINOUS MILLING; BITUMINOUS PATCHING; 2' TYPE C OVERLAY; GUARDRAIL; PAVEMENT MARKINGS LOCATIONS TO INCLUDE: CROSSAN RD FROM DOE RUN RD - UPPER PIKE CREEK RD VALLEY RD FROM HUNTER WAY - OLD WILMINGTON RD | $2,374,019 |
| Department of Transportation | PROJECT TITLE: BR 1-249 ON OLD BALTIMORE PIKE OVER TRIBUTARY TO CHRISTINA RIVER :::: PROJECT DESCRIPTION: THIS WORK INVOLVES THE REPLACEMENT OF AN EXISTING CORRUGATED METAL PIPE ARCH PRECAST CONCRETE BOX CULVERT. ADDITIONAL WORK INCLUDES THE PLACEMENT OF RIPRAP IN THE STREAM FOR SCOUR PROTECTION AND RECONSTRUCTION OF THE APPROACH ROADWAY AS NECESSARY. WORK WILL BE PERFORMED UNDER A FULL ROAD CLOSURE WITH DETOUR. | $1,617,057 |
| Department of Transportation | PROJECT TITLE: HEP KC, SR15 & IRISH HILL RD. INTERSECTION IMPROVEMENTS :::: PROJECT DESCRIPTION: THIS PROJECT WILL INVOLVE THE INSTALLATION OF A ROUNDABOUT AND ASSOCIATED IMPROVEMENTS AT THE INTERSECTION OF CANTERBURY ROAD (SR15) AND IRISH HILL ROAD (K31). | $1,335,470 |
| Department of Transportation | PROJECT TITLE: CAPE HENLOPEN STATE PARK POINT TRAIL :::: PROJECT DESCRIPTION: THIS IS A DNREC PROJECT, WHICH WILL RECEIVE 80% FUNDING FROM DELDOT. THE PROJECT PERTAINS TO DESIGNING A TRAIL CONNECTION IN CAPE HENLOPEN STATE PARK IN SUSSEX COUNTY. | $1,061,899 |